ROADWORKS SUMMARY
Crabourne Road, DUDLEY, DY2 0EH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Crabourne Road, DY2 0EH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Crabourne Road, DUDLEY, DY2 0EH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Crabourne Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are carrying out roadworks on Castle Hill, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 January 2023 at 00:01 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:41.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Trindle Road

Transport for West Midlands (TfWM) are carrying out roadworks on Trindle Road, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2023 at 16:30 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:43.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
Birmingham Street

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Birmingham Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2023 at 00:01 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 1 May 2025 at 15:28.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
King Street

Transport for West Midlands (TfWM) are carrying out roadworks on King Street, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 November 2023 at 07:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:41.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
King Street

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on King Street, Dudley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 November 2023 at 07:00 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:41.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
Birmingham Street

Transport for West Midlands (TfWM) are carrying out roadworks on Birmingham Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2023 at 07:00 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 1 May 2025 at 15:28.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
The Broadway

Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Broadway, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 11:43.

Birmingham City Council logo
LONG TERM
Between
15 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Pembridge Close

Birmingham City Council were proposing to carry out Highway improvement works on Pembridge Close, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2024 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 9 Jan 2025 at 10:53.

Birmingham City Council logo
LONG TERM
Between
30 Oct 2024 and 30 Oct 2025
Details
View Map
Share
Follow
Conway Avenue

Birmingham City Council are proposing to carry out Highway improvement works on Conway Avenue, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 13 Aug 2024 at 13:05.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
9 Jan and 1 Oct 2025
Details
View Map
Share
Follow
Trindle Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Trindle Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 08:33.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Park Street West

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Park Street West, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Halesowen Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Halesowen Street, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:25.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 24 Nov 2025
Details
View Map
Share
Follow
Long Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Long Lane, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Jan 2025 at 13:36.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on High Street, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Birmingham Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Birmingham Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
3 Feb and 28 Nov 2025
Details
View Map
Share
Follow
Oldbury Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Oldbury Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Park Street West

Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Park Street West, Rowley Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:08.

Sandwell Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Halesowen Street

Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Halesowen Street, Rowley Regis.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 13 Aug 2025 at 09:51.

Sandwell Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Long Lane

Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Long Lane, Rowley Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 May 2025 at 08:52.

Sandwell Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
High Street

Sandwell Metropolitan Borough Council are carrying out Highway improvement works on High Street, Rowley Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 May 2025 at 08:54.

Sandwell Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Birmingham Road

Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Birmingham Road, Rowley Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 May 2025 at 08:58.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
21 Apr 2025 and 19 Apr 2026
Details
View Map
Share
Follow
Duncan Edwards Way

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 19 April 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Dec 2024 at 12:49.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
21 Apr 2025 and 19 Apr 2026
Details
View Map
Share
Duncan Edwards Way

Transport for West Midlands (TfWM) were proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 19 April 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Apr 2025 at 08:54.

Cadent Gas logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Tat Bank Road

Cadent Gas are carrying out Utility asset works on Tat Bank Road, Oldbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 12:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 13:45.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Charterfield Drive

Cadent Gas were proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 12:26.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
20 Jun 2025 and 15 Sep 2026
Details
View Map
Share
Follow
Porters Field

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Porters Field, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 15 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 May 2025 at 11:27.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
20 Jun 2025 and 15 Sep 2026
Details
View Map
Share
Follow
St Joseph Street

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on St Joseph Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 15 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 May 2025 at 11:28.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Western Road

Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 22 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 10:28.

Cadent Gas logo
LONG TERM
Between
7 Jul and 1 Dec 2025
Details
View Map
Share
Follow
Tat Bank Road

Cadent Gas are proposing to carry out Utility asset works on Tat Bank Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:59.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
13 Jul 2025 and 10 Jan 2027
Details
View Map
Share
Follow
Railway Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Railway Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 10 January 2027. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 23 May 2025 at 09:29.

Cadent Gas logo
LONG TERM
Between
17 Jul and 9 Oct 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 18:30.

Cadent Gas logo
LONG TERM
Between
22 Jul and 17 Oct 2025
Details
View Map
Share
Stourbridge Road

Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Halesowen.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:07.

Cadent Gas logo
LONG TERM
Between
22 Jul and 17 Oct 2025
Details
View Map
Share
Stourbridge Road

Cadent Gas were proposing to carry out Utility asset works on Stourbridge Road, Halesowen.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:48.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
11 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Apr 2025 at 08:47.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are carrying out Works for road purposes on Castle Hill, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 04:00 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Aug 2025 at 09:04.

Cadent Gas logo
LONG TERM
Between
11 Aug and 26 Sep 2025
Details
View Map
Share
Vicarage Road West

Cadent Gas were proposing to carry out Utility asset works on Vicarage Road West, Woodsetton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 08:34.

Cadent Gas logo
LONG TERM
Between
11 Aug and 27 Oct 2025
Details
View Map
Share
Birmingham New Road

Cadent Gas were proposing to carry out Utility asset works on Birmingham New Road, Dudley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 08:34.

Cadent Gas logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Brettell Lane

Cadent Gas are carrying out Utility asset works on Brettell Lane, Brierley Hill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 10:27.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Ridgmont Croft

Cadent Gas are proposing to carry out Utility asset works on Ridgmont Croft, Birmingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 09:28.

Cadent Gas logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Central Drive

Cadent Gas were proposing to carry out Utility asset works on Central Drive, Lower Gornal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 10:00.

Cadent Gas logo
LONG TERM
Until
21 Oct 2025
Details
View Map
Share
Follow
Hambleton Road

Cadent Gas are carrying out Utility asset works on Hambleton Road, Hayley Green.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 08:30 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:12.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
26 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 20 Aug 2025 at 11:34.

Western Power Distribution (West Midlands) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bells Moor Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Bells Moor Road, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Jun 2025 at 13:39.

Western Power Distribution (West Midlands) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bells Moor Road

Western Power Distribution (West Midlands) are carrying out New service connection on Bells Moor Road, West Bromwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:46 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Aug 2025 at 09:25.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
31 Aug and 19 Oct 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are proposing to carry out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Mar 2025 at 09:36.

Cadent Gas logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
West Boulevard

Cadent Gas are proposing to carry out Utility asset works on West Boulevard, Quinton, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:55.

Cadent Gas logo
Until
26 Sep 2025
Details
View Map
Share
Follow
West Boulevard

Cadent Gas are carrying out Utility asset works on West Boulevard, Quinton, Birmingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 10:35.

LONG TERM
Between
1 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Ridge Grove

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridge Grove, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:40.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Stewkins

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stewkins, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 7 May 2025 at 11:57.

Cadent Gas logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Westmead Drive

Cadent Gas are proposing to carry out Utility asset works on Westmead Drive, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:30.

Cadent Gas logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Westmead Drive

Cadent Gas are carrying out Utility asset works on Westmead Drive, Oldbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 13:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 13:42.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Hartland Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hartland Street, Pensnett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 May 2025 at 11:19.

Cadent Gas logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Stone Street

Cadent Gas are carrying out Utility asset works on Stone Street, Oldbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 13:57.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Vicarage Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Pensnett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 21 May 2025 at 09:29.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
High View Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High View Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 20 May 2025 at 15:13.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Groveland Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Groveland Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Jul 2025 at 08:08.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Groveland Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Groveland Road, Tipton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Sep 2025 at 09:14.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Hazel Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hazel Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 09:26.

South Staffordshire Water logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Follow
Roberts Green Road

South Staffordshire Water are proposing to carry out Utility asset works on Roberts Green Road, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:46.

South Staffordshire Water logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Roberts Green Road

South Staffordshire Water are carrying out Utility asset works on Roberts Green Road, Upper Gornal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 1 Sep 2025 at 12:39.

South Staffordshire Water logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Follow
Roundhouse Road

South Staffordshire Water are proposing to carry out Utility asset works on Roundhouse Road, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:43.

South Staffordshire Water logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Roundhouse Road

South Staffordshire Water are carrying out Utility asset works on Roundhouse Road, Upper Gornal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 1 Sep 2025 at 12:40.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Sunnybank Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Road, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 23 May 2025 at 13:39.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Sunnybank Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Road, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 08:31.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Vicar Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicar Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 23 May 2025 at 14:52.

LONG TERM
Between
1 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Peartree Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Peartree Lane, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 23 May 2025 at 15:26.

Cadent Gas logo
LONG TERM
Between
5 Sep and 27 Nov 2025
Details
View Map
Share
Western Road

Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 27 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:20.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Western Road

Cadent Gas are carrying out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 08:25.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Kidderminster Road

Cadent Gas were proposing to carry out Utility asset works on Kidderminster Road, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 17:06.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Summervale Road

Cadent Gas were proposing to carry out Utility asset works on Summervale Road, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 17:07.

Cadent Gas logo
LONG TERM
Between
8 Sep and 27 Oct 2025
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 07:48.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Bromsgrove Road

Cadent Gas are carrying out Utility repair and maintenance works on Bromsgrove Road, Halesowen.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 10:13 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 14:27.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Tedstone Road

Cadent Gas are proposing to carry out Utility asset works on Tedstone Road, Birmingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 09:23.

Cadent Gas logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Tedstone Road

Cadent Gas are carrying out Utility asset works on Tedstone Road, Birmingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 08:46.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Graingers Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Graingers Lane, Cradley Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 26 Aug 2025 at 14:51.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
8 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Graingers Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Graingers Lane, Cradley Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 12:52.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Knarsdale Close

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Knarsdale Close, Brierley Hill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Jun 2025 at 09:16.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Salop Drive

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Salop Drive, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 23 Jul 2025 at 14:16.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Level Street

Transport for West Midlands (TfWM) are carrying out Utility asset works on Level Street, Brierley Hill.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 00:01 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Sep 2025 at 11:02.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Langley Road

Cadent Gas are proposing to carry out Utility asset works on Langley Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:27.

Cadent Gas logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Langley Road

Cadent Gas are carrying out Utility asset works on Langley Road, Oldbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 15:57 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 08:47.

Cadent Gas logo
Between
8 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Stone Street

Cadent Gas are proposing to carry out Utility asset works on Stone Street, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 10:43.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 16:38.

Cadent Gas logo
LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Regent Street

Cadent Gas are proposing to carry out Utility asset works on Regent Street, Woodsetton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:59.

Cadent Gas logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Regent Street

Cadent Gas are carrying out Utility asset works on Regent Street, Woodsetton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 10:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 10:01.

National Highways logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wolverhampton Road

National Highways are carrying out roadworks on Wolverhampton Road, Oldbury.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 20:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Sep 2025 at 08:52.

Cadent Gas logo
LONG TERM
Between
11 Sep and 19 Oct 2025
Details
View Map
Share
Thicknall Rise

Cadent Gas were proposing to carry out Utility asset works on Thicknall Rise, Hagley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 19 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 13:39.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Railway Street

Transport for West Midlands (TfWM) are carrying out Works for road purposes on Railway Street, Tipton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 23:59 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Sep 2025 at 11:11.

Worcestershire County Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Worcester Road

Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Worcester Road, West Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Sep 2025 at 09:21.

Worcestershire County Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Kidderminster Road

Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Kidderminster Road, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Sep 2025 at 09:21.

Cadent Gas logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Woodhouse Road

Cadent Gas are proposing to carry out Utility asset works on Woodhouse Road, Birmingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:52.

Cadent Gas logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Woodhouse Road

Cadent Gas are carrying out Utility asset works on Woodhouse Road, Birmingham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 12:26.

Cadent Gas logo
Until
13 Oct 2025
Details
View Map
Share
Follow
Kittiwake Drive

Cadent Gas are carrying out Utility asset works on Kittiwake Drive, Quarry Bank.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 08:31.

Cadent Gas logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Reservoir Road

Cadent Gas are proposing to carry out Utility asset works on Reservoir Road, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 16:06.

Cadent Gas logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Reservoir Road

Cadent Gas are proposing to carry out Utility asset works on Reservoir Road, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 07:42.

Cadent Gas logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
New Henry Street

Cadent Gas are proposing to carry out Utility asset works on New Henry Street, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 14:06.

Cadent Gas logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
New Henry Street

Cadent Gas are proposing to carry out Utility asset works on New Henry Street, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 15:24.

Transport for West Midlands (TfWM) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
New Mill Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on New Mill Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 10 Sep 2025 at 15:28.

Transport for West Midlands (TfWM) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
New Mill Street

Transport for West Midlands (TfWM) are carrying out Works for road purposes on New Mill Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 20:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Sep 2025 at 07:43.

Sandwell Metropolitan Borough Council logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Dudley Port

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dudley Port, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 May 2025 at 15:13.

Sandwell Metropolitan Borough Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Dudley Port

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Dudley Port, Tipton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 18:30 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2025 at 17:11.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
15 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Horseley Road

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Horseley Road, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 2 Sep 2025 at 13:25.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Horseley Road

Transport for West Midlands (TfWM) are carrying out Works for road purposes on Horseley Road, Tipton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 06:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Sep 2025 at 11:21.

Cadent Gas logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Vicarage Road West

Cadent Gas were proposing to carry out Utility asset works on Vicarage Road West, Woodsetton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 08:35.

Finishing
Monday
Details
View Map
Share
Follow
The Broadway

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on The Broadway, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 11:25.

South Staffordshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Silverthorne Lane

South Staffordshire Water are carrying out Utility repair and maintenance works on Silverthorne Lane, Cradley Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 09:19 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 16 Sep 2025 at 09:55.

Transport for West Midlands (TfWM) logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
The Minories

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on The Minories, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 8 Sep 2025 at 13:03.

Transport for West Midlands (TfWM) logo
Until
18 Sep 2025
Details
View Map
Share
Follow
The Minories

Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Minories, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 20:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2025 at 11:32.

Transport for West Midlands (TfWM) logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Flood Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Flood Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Sep 2025 at 09:04.

Transport for West Midlands (TfWM) logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Flood Street

Transport for West Midlands (TfWM) carried out Works for road purposes on Flood Street, Dudley.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 16 Sep 2025 and 18 Sep 2025 and were actually completed between 16 Sep 2025 (20:00) and 18 Sep 2025 (05:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 18 Sep 2025 at 09:27.

Transport for West Midlands (TfWM) logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Flood Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Flood Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 14:21.

Severn Trent Water logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Corporation Road

Severn Trent Water were proposing to carry out Remedial works on Corporation Road, Dudley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 09:38.

Cadent Gas logo
LONG TERM
Until
25 Nov 2025
Details
View Map
Share
Follow
The Straits

Cadent Gas are carrying out Utility asset works on The Straits, Lower Gornal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:30 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 10:38.

Cadent Gas logo
Until
30 Sep 2025
Details
View Map
Share
Follow
High Arcal Road

Cadent Gas are carrying out Utility asset works on High Arcal Road, Lower Gornal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:30 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 10:37.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
16 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Great Bridge

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Great Bridge, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 5 December 2025. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2025 at 11:03.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
16 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Great Bridge

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Great Bridge, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 5 December 2025. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 2 Sep 2025 at 13:14.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
16 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Market Place

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Market Place, Great Bridge, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 5 December 2025. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2025 at 11:02.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
16 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Market Place

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Market Place, Great Bridge, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 5 December 2025. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 2 Sep 2025 at 13:13.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Great Bridge

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Great Bridge, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 May 2025 at 14:43.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Great Bridge

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Great Bridge, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 27 Aug 2025 at 09:38.

Until
26 Sep 2025
Details
View Map
Share
Follow
High View Street

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on High View Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2025 at 09:27.

Worcestershire County Council logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Thicknall Rise

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Thicknall Rise, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Worcestershire County Council on 7 Jul 2025 at 15:21.

Worcestershire County Council logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Thicknall Rise

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Thicknall Rise, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Worcestershire County Council on 8 Jul 2025 at 09:38.

Worcestershire County Council logo
Between
22 Sep and 1 Oct 2025
Details
View Map
Share
Western Road

Worcestershire County Council were proposing to carry out Highway improvement works on Western Road, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 1 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 3 Jul 2025 at 11:05.

Cadent Gas logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Grange Lane

Cadent Gas were proposing to carry out Utility asset works on Grange Lane, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 14:22.

Cadent Gas logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Grange Lane

Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 15:57.

Cadent Gas logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Grange Lane

Cadent Gas are proposing to carry out Utility asset works on Grange Lane, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 10:57.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hawne Lane

Cadent Gas are proposing to carry out Utility asset works on Hawne Lane, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 15:18.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hawne Lane

Cadent Gas are proposing to carry out Utility asset works on Hawne Lane, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 10:18.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hawne Lane

Cadent Gas are proposing to carry out Utility asset works on Hawne Lane, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:48.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hayseech Road

Cadent Gas are proposing to carry out Utility asset works on Hayseech Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 15:20.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Hayseech Road

Cadent Gas are proposing to carry out Utility asset works on Hayseech Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:49.

Cadent Gas logo
LONG TERM
Between
22 Sep and 30 Oct 2025
Details
View Map
Share
Follow
Wrights Lane

Cadent Gas are proposing to carry out Utility asset works on Wrights Lane, Cradley Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 10:29.

Cadent Gas logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Joinings Bank

Cadent Gas are proposing to carry out Utility asset works on Joinings Bank, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 08:48.

Cadent Gas logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Joinings Bank

Cadent Gas are proposing to carry out Utility asset works on Joinings Bank, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 07:52.

Cadent Gas logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Thompson Road

Cadent Gas are proposing to carry out Utility asset works on Thompson Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:43.

Cadent Gas logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Thompson Road

Cadent Gas are proposing to carry out Utility asset works on Thompson Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 07:52.

Transport for West Midlands (TfWM) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Flood Street

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Flood Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 10 Sep 2025 at 14:48.

Transport for West Midlands (TfWM) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Flood Street

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Flood Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 10 Sep 2025 at 15:29.

Transport for West Midlands (TfWM) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Hall Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Hall Street, Dudley.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 10:25.

Transport for West Midlands (TfWM) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Hall Street

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Hall Street, Dudley.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Aug 2025 at 10:43.

South Staffordshire Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Kinfare Rise

South Staffordshire Water are proposing to carry out Utility asset works on Kinfare Rise, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:46.

South Staffordshire Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Naylors Grove

South Staffordshire Water are proposing to carry out Utility asset works on Naylors Grove, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:43.

South Staffordshire Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Naylors Grove

South Staffordshire Water are proposing to carry out Utility asset works on Naylors Grove, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 17 Jul 2025 at 12:10.

Cadent Gas logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Byron Croft

Cadent Gas are proposing to carry out Utility asset works on Byron Croft, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 11:26.

Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Vicar Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicar Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 08:36.

Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Vicar Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicar Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 25 Jun 2025 at 11:05.

Cadent Gas logo
LONG TERM
Between
23 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Thicknall Rise

Cadent Gas are proposing to carry out Utility asset works on Thicknall Rise, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 15:41.

Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Stewkins

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stewkins, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 10:05.

Cadent Gas logo
LONG TERM
Between
25 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 17:08.

Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Peartree Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Peartree Lane, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Jun 2025 at 08:05.

Cadent Gas logo
Between
26 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 14:16.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Worcester Road

Cadent Gas were proposing to carry out Utility asset works on Worcester Road, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 09:03.

Cadent Gas logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Kidderminster Road

Cadent Gas are proposing to carry out Utility asset works on Kidderminster Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 11:03.

Cadent Gas logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Summervale Road

Cadent Gas are proposing to carry out Utility asset works on Summervale Road, Hagley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2025 at 14:43.

Cadent Gas logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Meadowbrook Road

Cadent Gas were proposing to carry out Utility asset works on Meadowbrook Road, Halesowen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Jun 2025 at 19:24.

Cadent Gas logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Meadowbrook Road

Cadent Gas are proposing to carry out Utility asset works on Meadowbrook Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 15:07.

Cadent Gas logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Meadowbrook Road

Cadent Gas are proposing to carry out Utility asset works on Meadowbrook Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 09:15.

Cadent Gas logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Briery Road

Cadent Gas are proposing to carry out Utility asset works on Briery Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Jul 2025 at 15:06.

Cadent Gas logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Briery Road

Cadent Gas are proposing to carry out Utility asset works on Briery Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 09:15.

Severn Trent Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Brick Kiln Street

Severn Trent Water were proposing to carry out Remedial works on Brick Kiln Street, Quarry Bank.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Jul 2025 at 13:51.

Cadent Gas logo
LONG TERM
Between
29 Sep and 29 Oct 2025
Details
View Map
Share
Defford Drive

Cadent Gas were proposing to carry out Utility asset works on Defford Drive, Oldbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 12:03.

Cadent Gas logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Moat Road

Cadent Gas are proposing to carry out Utility asset works on Moat Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 09:21.

Cadent Gas logo
LONG TERM
Between
29 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Defford Drive

Cadent Gas are proposing to carry out Utility asset works on Defford Drive, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 09:20.

Cadent Gas logo
Between
29 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 09:15.

Cadent Gas logo
Between
29 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 00:10.

Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Hartland Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hartland Street, Pensnett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 10:49.

Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Vicarage Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Vicarage Lane, Pensnett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 10:50.

Cadent Gas logo
LONG TERM
Between
29 Sep and 14 Nov 2025
Details
View Map
Share
Grosvenor Road South

Cadent Gas were proposing to carry out Utility asset works on Grosvenor Road South, Lower Gornal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 10:10.

Cadent Gas logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Grosvenor Road

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Road, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 13:10.

Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Hazel Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hazel Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 9 Jun 2025 at 10:35.

Transport for West Midlands (TfWM) logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Sedgley Road East

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Sedgley Road East, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Jul 2025 at 12:05.

Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Sunnybank Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Road, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 May 2025 at 12:07.

Cadent Gas logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Claycroft Terrace

Cadent Gas are proposing to carry out Utility asset works on Claycroft Terrace, Woodsetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 10:00.

Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Hambleton Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hambleton Road, Hayley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:39.

Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Fatherless Barn Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fatherless Barn Crescent, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:39.

Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Lusbridge Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lusbridge Close, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:39.

Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Shepherds Brook Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Shepherds Brook Road, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Jun 2025 at 10:40.

South Staffordshire Water logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Colley Lane

South Staffordshire Water are proposing to carry out Remedial works on Colley Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 8 Jul 2025 at 12:27.

Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Monteagle Drive

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Monteagle Drive, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 08:59.

Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Charlecote Drive

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Charlecote Drive, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 Jun 2025 at 09:00.

BT logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Summer Lane

BT are proposing to carry out Utility asset works on Summer Lane, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Jul 2025 at 12:19.

BT logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Summer Lane

BT are proposing to carry out Utility asset works on Summer Lane, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Jul 2025 at 15:15.

Severn Trent Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Carters Lane

Severn Trent Water were proposing to carry out Remedial works on Carters Lane, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 11:15.

Sandwell Metropolitan Borough Council logo
Between
6 and 15 Oct 2025
Details
View Map
Share
Follow
Payne Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Payne Street, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Feb 2025 at 09:51.

Sandwell Metropolitan Borough Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Payne Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Payne Street, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Feb 2025 at 11:29.

Staffordshire County Council logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2025 at 08:03.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Moat Road

Cadent Gas are proposing to carry out Utility asset works on Moat Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 13:38.

Cadent Gas logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Defford Drive

Cadent Gas are proposing to carry out Utility asset works on Defford Drive, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 13:29.

Cadent Gas logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Moat Road

Cadent Gas were proposing to carry out Utility asset works on Moat Road, Oldbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 11:42.

South Staffordshire Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Church Road

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Church Road, Netherton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 15 Jul 2025 at 09:07.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Titford Road

Cadent Gas are proposing to carry out Utility asset works on Titford Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 11:47.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Titford Road

Cadent Gas are proposing to carry out Utility asset works on Titford Road, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2025 at 00:10.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
6 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Spon Lane South

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Spon Lane South, Smethwick.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Jun 2025 at 16:30.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
6 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Spon Lane South

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Spon Lane South, West Bromwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Jun 2025 at 16:30.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
6 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Kelvin Way

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Kelvin Way, West Bromwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Jun 2025 at 16:30.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
6 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Spon Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Spon Lane, West Bromwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Jun 2025 at 16:30.

LONG TERM
Between
6 Oct 2025 and 10 Aug 2026
Details
View Map
Share
Follow
Birmingham Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birmingham Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 11 Aug 2025 at 14:10.

LONG TERM
Between
6 Oct 2025 and 5 Aug 2026
Details
View Map
Share
Follow
Burnt Tree

Dudley Metropolitan Borough Council are proposing to carry out Highway improvement works on Burnt Tree, Tipton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Aug 2025 at 09:05.

LONG TERM
Between
6 Oct 2025 and 5 Aug 2026
Details
View Map
Share
Follow
Tividale Road

Dudley Metropolitan Borough Council are proposing to carry out Highway improvement works on Tividale Road, Tipton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 August 2026. The works will impact the footway and cycleway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 21 Aug 2025 at 09:57.

LONG TERM
Between
6 Oct 2025 and 5 Aug 2026
Details
View Map
Share
Follow
Birmingham New Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birmingham New Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Jul 2025 at 12:13.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Dudley Road West

Cadent Gas are proposing to carry out Utility asset works on Dudley Road West, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:48.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Dudley Road West

Cadent Gas are proposing to carry out Utility asset works on Dudley Road West, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 15:41.

Cadent Gas logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Tipton Road

Cadent Gas are proposing to carry out Utility asset works on Tipton Road, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:59.

Cadent Gas logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Tipton Road

Cadent Gas are proposing to carry out Utility asset works on Tipton Road, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 15:40.

LONG TERM
Between
6 Oct 2025 and 5 Aug 2026
Details
View Map
Share
Follow
Burnt Tree

Dudley Metropolitan Borough Council are proposing to carry out Highway improvement works on Burnt Tree, Tipton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 5 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Aug 2025 at 09:05.

Cadent Gas logo
LONG TERM
Between
6 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Dudley Road East

Cadent Gas are proposing to carry out Utility asset works on Dudley Road East, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:53.

Cadent Gas logo
LONG TERM
Between
6 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Dudley Road East

Cadent Gas are proposing to carry out Utility asset works on Dudley Road East, Tividale, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 15:41.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Bluebell Road

Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:42.

Cadent Gas logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Priory Road

Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:41.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Browning Road

Cadent Gas are proposing to carry out Utility asset works on Browning Road, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 11:19.

South Staffordshire Water logo
Between
6 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Cricket Meadow

South Staffordshire Water are proposing to carry out Utility asset works on Cricket Meadow, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Jun 2025 at 12:46.

South Staffordshire Water logo
Between
6 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Cricket Meadow

South Staffordshire Water are proposing to carry out Utility asset works on Cricket Meadow, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 17 Jul 2025 at 12:11.

Western Power Distribution (West Midlands) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Robert Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Robert Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Jul 2025 at 13:00.

Western Power Distribution (West Midlands) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Robert Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Robert Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Aug 2025 at 13:25.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Tipton Road

Cadent Gas were proposing to carry out Utility asset works on Tipton Road, Sedgley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 08:37.

Severn Trent Water logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Brick Kiln Street

Severn Trent Water are proposing to carry out Remedial works on Brick Kiln Street, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Jul 2025 at 10:27.

Severn Trent Water logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Brick Kiln Street

Severn Trent Water are proposing to carry out Remedial works on Brick Kiln Street, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 08:36.

Sandwell Metropolitan Borough Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Dudley Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dudley Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 2 May 2025 at 12:59.

Sandwell Metropolitan Borough Council logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Dudley Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dudley Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 13:23.

Cadent Gas logo
Between
9 and 16 Oct 2025
Details
View Map
Share
Follow
Bloxcidge Street

Cadent Gas are proposing to carry out Utility asset works on Bloxcidge Street, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 11:16.

Cadent Gas logo
Between
10 and 24 Oct 2025
Details
View Map
Share
Western Road

Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 12:46.

Cadent Gas logo
LONG TERM
Between
10 Oct and 17 Dec 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 17 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 15:46.

Cadent Gas logo
LONG TERM
Between
10 Oct and 17 Nov 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 10:57.

Cadent Gas logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Central Drive

Cadent Gas were proposing to carry out Utility asset works on Central Drive, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 10:16.

Sandwell Metropolitan Borough Council logo
Between
10 and 14 Oct 2025
Details
View Map
Share
Follow
Ridgeway Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridgeway Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 2 May 2025 at 14:12.

Cadent Gas logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Cedar Road

Cadent Gas were proposing to carry out Utility asset works on Cedar Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:43.

Between
16 and 31 Oct 2025
Details
View Map
Share
Follow
Love Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Love Lane, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 13 May 2025 at 08:35.

Transport for West Midlands (TfWM) logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Birmingham New Road

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Birmingham New Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Sep 2025 at 12:36.

Cadent Gas logo
LONG TERM
Between
17 Oct and 24 Nov 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 20:57.

Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Cheviot Way

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cheviot Way, Hayley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Jun 2025 at 11:35.

BT logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Junction Road

BT were proposing to carry out Utility asset works on Junction Road, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Sep 2025 at 12:23.

Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
High Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 22 Jul 2025 at 11:14.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Wood Street

Severn Trent Water are proposing to carry out New service connection on Wood Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Jul 2025 at 10:33.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Wood Street

Severn Trent Water are proposing to carry out New service connection on Wood Street, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Jul 2025 at 11:50.

Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Stockwell Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stockwell Avenue, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2025 at 12:50.

Between
20 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Acres Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Acres Road, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2025 at 12:50.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Graingers Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Graingers Lane, Cradley Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 13:00.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Graingers Lane

Sandwell Metropolitan Borough Council were proposing to carry out Highway improvement works on Graingers Lane, Cradley Heath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 12:26.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Cradley Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Cradley Road, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 13:01.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Lower High Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Lower High Street, Cradley Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 13:00.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on High Street, Cradley Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 12:59.

Sandwell Metropolitan Borough Council logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
St Annes Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on St Annes Road, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2025 at 13:02.

Cadent Gas logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Maple Road

Cadent Gas were proposing to carry out Utility asset works on Maple Road, Dudley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:10.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Lavender Road

Cadent Gas were proposing to carry out Utility asset works on Lavender Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:11.

Western Power Distribution (West Midlands) logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Birmingham New Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Birmingham New Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 12 Aug 2025 at 10:48.

Western Power Distribution (West Midlands) logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Birmingham New Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Birmingham New Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Aug 2025 at 14:49.

Western Power Distribution (West Midlands) logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Birmingham New Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Birmingham New Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Aug 2025 at 10:54.

Western Power Distribution (West Midlands) logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Dudley Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 12 Aug 2025 at 10:32.

Western Power Distribution (West Midlands) logo
Between
20 and 26 Oct 2025
Details
View Map
Share
Follow
Dudley Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Aug 2025 at 13:54.

Cadent Gas logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Ryders Green Road

Cadent Gas are proposing to carry out Utility asset works on Ryders Green Road, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 10:40.

Cadent Gas logo
Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Edge Street

Cadent Gas are proposing to carry out New service connection on Edge Street, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 15:16.

Cadent Gas logo
Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Edge Street

Cadent Gas are proposing to carry out New service connection on Edge Street, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2025 at 14:58.

Worcestershire County Council logo
Between
21 and 31 Oct 2025
Details
View Map
Share
Western Road

Worcestershire County Council were proposing to carry out Highway improvement works on Western Road, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 30 Jul 2025 at 10:51.

Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Redlake Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Redlake Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 13 May 2025 at 12:42.

Western Power Distribution (West Midlands) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Pargeter Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Pargeter Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 16 Jul 2025 at 13:27.

Western Power Distribution (West Midlands) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Pargeter Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Pargeter Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2025 at 11:19.

Western Power Distribution (West Midlands) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Pargeter Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Pargeter Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Sep 2025 at 10:35.

Western Power Distribution (West Midlands) logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Worcester Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Worcester Street, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Jun 2025 at 12:40.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Balds Lane

Cadent Gas are proposing to carry out Utility asset works on Balds Lane, Lye.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 10:27.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Balds Lane

Cadent Gas are proposing to carry out Utility asset works on Balds Lane, Lye.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 16:21.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Balds Lane

Cadent Gas were proposing to carry out Utility asset works on Balds Lane, Lye.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 16:15.

Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Stockwell Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stockwell Avenue, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 May 2025 at 10:39.

Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Acres Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Acres Road, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 27 May 2025 at 10:40.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Titford Lane

Cadent Gas are proposing to carry out Utility asset works on Titford Lane, Rowley Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2025 at 10:00.

Cadent Gas logo
Between
27 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Tudor Road

Cadent Gas are proposing to carry out Utility asset works on Tudor Road, Oldbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 09:49.

Between
27 and 29 Oct 2025
Details
View Map
Share
Chase Road

Dudley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Chase Road, Lower Gornal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 10:31.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Hamilton Drive

Cadent Gas are proposing to carry out Utility asset works on Hamilton Drive, Tividale, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 09:14.

Cadent Gas logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Hamilton Drive

Cadent Gas were proposing to carry out Utility asset works on Hamilton Drive, Tividale, Oldbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 14:05.

Cadent Gas logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Dudley Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Dudley Road, Himley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Jun 2025 at 15:18.

Cadent Gas logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Dudley Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Dudley Road, Himley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 09:34.

Western Power Distribution (West Midlands) logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Aug 2025 at 10:58.

Western Power Distribution (West Midlands) logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2025 at 09:49.

Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Chad Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chad Road, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 11 Jun 2025 at 14:49.

Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Chad Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chad Road, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Jun 2025 at 10:46.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Gospel End Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Gospel End Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 11 Aug 2025 at 14:00.

Severn Trent Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Hob Green Road

Severn Trent Water are proposing to carry out New service connection on Hob Green Road, Wollescote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Aug 2025 at 13:27.

Between
30 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Summerfield Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Summerfield Avenue, Wall Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 12 Sep 2025 at 09:35.

Between
30 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Foundry Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Foundry Road, Wall Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 12 Sep 2025 at 09:35.

Western Power Distribution (West Midlands) logo
Between
1 and 7 Nov 2025
Details
View Map
Share
Follow
Oak Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Oak Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2025 at 15:17.

Cadent Gas logo
Between
2 and 4 Nov 2025
Details
View Map
Share
Follow
Castle Street

Cadent Gas are proposing to carry out Remedial works on Castle Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 11:54.

South Staffordshire Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Nimmings Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Nimmings Road, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 22 Aug 2025 at 12:46.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Gayfield Avenue

BT are proposing to carry out Utility asset works on Gayfield Avenue, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Aug 2025 at 13:17.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Gayfield Avenue

BT are proposing to carry out Utility asset works on Gayfield Avenue, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Aug 2025 at 10:25.

Cadent Gas logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Matty Road

Cadent Gas were proposing to carry out Utility asset works on Matty Road, Oldbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 16:47.

Cadent Gas logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Cedar Road

Cadent Gas were proposing to carry out Utility asset works on Cedar Road, Dudley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:10.

Cadent Gas logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Bluebell Road

Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 22:11.

Severn Trent Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Hermit Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hermit Street, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 16:12.

Severn Trent Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Alderwood Rise

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alderwood Rise, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 16:12.

Between
4 and 14 Nov 2025
Details
View Map
Share
Follow
Grenville Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Grenville Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2025 at 15:58.

Cadent Gas logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Musk Lane West

Cadent Gas are proposing to carry out Utility asset works on Musk Lane West, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:29.

Cadent Gas logo
LONG TERM
Between
7 Nov and 11 Dec 2025
Details
View Map
Share
Bromsgrove Road

Cadent Gas were proposing to carry out Utility asset works on Bromsgrove Road, Romsley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2025 and run through until 11 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 11:33.

Between
7 and 14 Nov 2025
Details
View Map
Share
Follow
Cedar Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cedar Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Sep 2025 at 13:01.

Between
7 and 14 Nov 2025
Details
View Map
Share
Follow
Cedar Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cedar Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2025 at 10:24.

Worcestershire County Council logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Western Road

Worcestershire County Council are proposing to carry out Highway improvement works on Western Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 22 Aug 2025 at 16:47.

Worcestershire County Council logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Western Road

Worcestershire County Council are proposing to carry out Highway improvement works on Western Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Worcestershire County Council on 26 Aug 2025 at 11:42.

Cadent Gas logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Rosemary Road

Cadent Gas were proposing to carry out Utility asset works on Rosemary Road, Halesowen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 16:59.

Western Power Distribution (West Midlands) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Hill Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Hill Street, Quarry Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Sep 2025 at 08:40.

Cadent Gas logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Clee Road

Cadent Gas were proposing to carry out Utility asset works on Clee Road, Oldbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2025 at 16:50.

Cadent Gas logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Coleridge Rise

Cadent Gas are proposing to carry out Utility asset works on Coleridge Rise, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 11:28.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Brownswall Road

Cadent Gas are proposing to carry out Utility asset works on Brownswall Road, Sedgley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:06.

Cadent Gas logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Brownswall Road

Cadent Gas are proposing to carry out Utility asset works on Brownswall Road, Sedgley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 14:38.

Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Tipton Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tipton Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Sep 2025 at 13:03.

Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Tipton Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tipton Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2025 at 10:25.

Cadent Gas logo
Between
11 and 25 Nov 2025
Details
View Map
Share
Western Road

Cadent Gas were proposing to carry out Utility asset works on Western Road, Hagley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 25 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 12:46.

Cadent Gas logo
LONG TERM
Between
11 Nov 2025 and 1 Jan 2026
Details
View Map
Share
Follow
Brettell Lane

Cadent Gas are proposing to carry out Utility asset works on Brettell Lane, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 1 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 14:27.

Severn Trent Water logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Ryder Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ryder Street, Wordsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Aug 2025 at 08:45.

Cadent Gas logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Follow
Church Square

Cadent Gas are proposing to carry out New service connection on Church Square, Oldbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 15:34.

South Staffordshire Water logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Summer Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Summer Lane, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 5 Sep 2025 at 11:29.

Between
12 and 28 Nov 2025
Details
View Map
Share
Follow
Cradley Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cradley Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Sep 2025 at 12:58.

Between
12 and 28 Nov 2025
Details
View Map
Share
Follow
Cradley Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cradley Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 9 Sep 2025 at 10:11.

Between
12 and 30 Nov 2025
Details
View Map
Share
Follow
Summerfield Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Summerfield Avenue, Wall Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 16:15.

Between
12 and 30 Nov 2025
Details
View Map
Share
Follow
Foundry Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Foundry Road, Wall Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 16:15.

Between
12 and 30 Nov 2025
Details
View Map
Share
Follow
Grenville Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Grenville Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 16:16.

Cadent Gas logo
LONG TERM
Between
13 Nov and 30 Dec 2025
Details
View Map
Share
Follow
Mendip Road

Cadent Gas are proposing to carry out Utility asset works on Mendip Road, Hayley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 14:42.

Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Norton Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Norton Road, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 3 Sep 2025 at 11:31.

Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Norton Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Norton Road, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Sep 2025 at 11:02.

Severn Trent Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
King William Street

Severn Trent Water were proposing to carry out New service connection on King William Street, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Severn Trent Water on 13 Aug 2025 at 11:55.

Severn Trent Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
King William Street

Severn Trent Water are proposing to carry out New service connection on King William Street, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 11:33.

Severn Trent Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
King William Street

Severn Trent Water are proposing to carry out New service connection on King William Street, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Aug 2025 at 13:29.

Staffordshire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 14:49.

Transport for West Midlands (TfWM) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Sedgley Road East

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Sedgley Road East, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Sep 2025 at 14:38.

South Staffordshire Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Barnfield Road

South Staffordshire Water are proposing to carry out New service connection on Barnfield Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 29 Aug 2025 at 09:46.

Telefonica UK logo
Between
17 and 18 Nov 2025
Details
View Map
Share
Follow
Harrold Street

Telefonica UK are proposing to carry out Utility asset works on Harrold Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 18 November 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 21 Aug 2025 at 07:47.

Telefonica UK logo
Between
17 and 18 Nov 2025
Details
View Map
Share
Follow
Harrold Street

Telefonica UK are proposing to carry out Utility asset works on Harrold Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 18 November 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 2 Sep 2025 at 14:31.

Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Meriden Avenue

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Meriden Avenue, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2025 at 09:44.

South Staffordshire Water logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Cottage Street

South Staffordshire Water are proposing to carry out Remedial works on Cottage Street, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 26 Aug 2025 at 12:49.

Cadent Gas logo
Between
19 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Western Road

Cadent Gas are proposing to carry out Utility asset works on Western Road, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 09:56.

Cadent Gas logo
Between
19 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Gervase Drive

Cadent Gas are proposing to carry out Utility asset works on Gervase Drive, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 9 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 09:04.

Cadent Gas logo
LONG TERM
Between
19 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
The Straits

Cadent Gas are proposing to carry out Utility asset works on The Straits, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 30 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:21.

Cadent Gas logo
Between
19 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Coleridge Rise

Cadent Gas are proposing to carry out Utility asset works on Coleridge Rise, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:22.

Cadent Gas logo
Between
19 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Browning Road

Cadent Gas are proposing to carry out Utility asset works on Browning Road, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:22.

Cadent Gas logo
Between
19 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Byron Croft

Cadent Gas are proposing to carry out Utility asset works on Byron Croft, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:22.

Cadent Gas logo
Between
19 Nov and 3 Dec 2025
Details
View Map
Share
Follow
High Arcal Road

Cadent Gas are proposing to carry out Utility asset works on High Arcal Road, Lower Gornal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:19.

Between
20 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Stream Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stream Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Sep 2025 at 12:57.

Between
20 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Stream Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stream Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Sep 2025 at 12:03.

Between
20 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Stream Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stream Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2025 at 13:42.

Cadent Gas logo
LONG TERM
Between
20 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Ryders Green Road

Cadent Gas are proposing to carry out Utility asset works on Ryders Green Road, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 11:10.

Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Bowling Green Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bowling Green Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2025 at 10:48.

Cadent Gas logo
LONG TERM
Between
24 Nov 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Leys Road

Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:58.

Cadent Gas logo
Between
24 Nov and 23 Dec 2025
Details
View Map
Share
Tudor Road

Cadent Gas were proposing to carry out Utility asset works on Tudor Road, Oldbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 23 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 12:19.

Between
24 Nov and 2 Dec 2025
Details
View Map
Share
Follow
Monteagle Drive

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Monteagle Drive, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 11:19.

ESP Electricity logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Lombard Street West

ESP Electricity are proposing to carry out Utility asset works on Lombard Street West, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 27 Aug 2025 at 15:46.

Cadent Gas logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Woodbank Road

Cadent Gas are proposing to carry out Utility asset works on Woodbank Road, Sedgley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jul 2025 at 15:45.

Cadent Gas logo
Between
24 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Woodbank Road

Cadent Gas are proposing to carry out Utility asset works on Woodbank Road, Sedgley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 14:28.

Between
25 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Berkeley Drive

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Berkeley Drive, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 10 Sep 2025 at 12:21.

Between
25 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Berkeley Drive

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Berkeley Drive, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 15 Sep 2025 at 11:06.

Cadent Gas logo
LONG TERM
Between
26 Nov 2025 and 24 Jan 2026
Details
View Map
Share
Follow
Hambleton Road

Cadent Gas are proposing to carry out Utility asset works on Hambleton Road, Hayley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 24 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 15:30.

Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Chase Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chase Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Sep 2025 at 11:36.

Cadent Gas logo
LONG TERM
Between
28 Nov 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Bromsgrove Road

Cadent Gas are proposing to carry out Utility asset works on Bromsgrove Road, Romsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 7 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 11:00.

Between
28 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Charlecote Drive

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Charlecote Drive, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 12:36.

South Staffordshire Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Canal Street

South Staffordshire Water are proposing to carry out New service connection on Canal Street, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 8 Sep 2025 at 14:12.

Cadent Gas logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Priory Road

Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 14:09.

Cadent Gas logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Follow
Masefield Road

Cadent Gas are proposing to carry out Utility asset works on Masefield Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 15:27.

Between
4 and 17 Dec 2025
Details
View Map
Share
Follow
Lusbridge Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lusbridge Close, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 Aug 2025 at 13:07.

Between
5 and 18 Dec 2025
Details
View Map
Share
Follow
Fatherless Barn Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fatherless Barn Crescent, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 2 Sep 2025 at 08:36.

Worcestershire County Council logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Brake Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brake Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 16 Sep 2025 at 09:55.

Worcestershire County Council logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Brake Lane

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Brake Lane, Hagley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 18 Sep 2025 at 10:13.

Between
8 and 19 Dec 2025
Details
View Map
Share
Follow
Hambleton Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hambleton Road, Hayley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 1 Sep 2025 at 12:13.

Severn Trent Water logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Valley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Valley Road, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 14:46.

Cadent Gas logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Temple Way

Cadent Gas were proposing to carry out Utility asset works on Temple Way, Tividale, Oldbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 14:06.

Cadent Gas logo
Between
8 and 19 Dec 2025
Details
View Map
Share
Temple Way

Cadent Gas were proposing to carry out Utility asset works on Temple Way, Tividale, Oldbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 11:06.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Somery Road

Cadent Gas were proposing to carry out Utility asset works on Somery Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:39.

Cadent Gas logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Chestnut Avenue

Cadent Gas were proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 17:36.

Cadent Gas logo
Between
8 and 24 Dec 2025
Details
View Map
Share
Follow
Sandyfields Road

Cadent Gas are proposing to carry out Utility asset works on Sandyfields Road, Sedgley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 14:01.

Cadent Gas logo
Between
8 and 24 Dec 2025
Details
View Map
Share
Follow
Sandyfields Road

Cadent Gas are proposing to carry out Utility asset works on Sandyfields Road, Sedgley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 08:38.

BT logo
Between
9 and 11 Dec 2025
Details
View Map
Share
Follow
The Drive

BT are proposing to carry out Utility repair and maintenance works on The Drive, Halesowen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Sep 2025 at 14:44.

Between
9 and 12 Dec 2025
Details
View Map
Share
Follow
Peel Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Peel Street, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 2 Sep 2025 at 15:24.

Between
10 and 26 Dec 2025
Details
View Map
Share
Follow
Balfour Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Balfour Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 26 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 10 Sep 2025 at 15:04.

Severn Trent Water logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Upper Church Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Upper Church Lane, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 08:23.

Between
12 and 23 Dec 2025
Details
View Map
Share
Follow
Ridge Grove

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ridge Grove, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2025 and could run through until 23 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 2 Sep 2025 at 08:47.

South Staffordshire Water logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Park Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Park Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 15 Sep 2025 at 15:37.

South Staffordshire Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Castle Hill

South Staffordshire Water are proposing to carry out New service connection on Castle Hill, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 15 Sep 2025 at 13:04.

Severn Trent Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Hermit Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hermit Street, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 16:32.

Severn Trent Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Alderwood Rise

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alderwood Rise, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2025 at 16:39.

Cadent Gas logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 15:38.


Roadworks Map near to Crabourne Road, DUDLEY, DY2 0EH (15 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Crabourne Road, DUDLEY, DY2 0EH (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South Staffordshire Water logo
URGENT
  
SILVERTHORNE LANE 
(0.4 miles)
South Staffordshire Water
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 16 Sep 2025 09:19
(Scheduled: 16 Sep 2025 - 22 Sep 2025)
0.4
Details
Share
Follow
2
South Staffordshire Water logo
ABINGDON ROAD 
(0.5 miles)
South Staffordshire Water
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 17 Sep 2025 10:42
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
0.5
Details
Share
Follow
3
BT logo
JAMES DEE CLOSE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
18 Sep 2025 13:43 - 15:44
0.6
Details
Share
4
Sandwell Metropolitan Borough Council logo
MAJOR
  
NORTHGATE 
(0.6 miles)
Sandwell Metropolitan Borough Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 19 Sep 2025
0.6
Details
Share
Follow
5
Sandwell Metropolitan Borough Council logo
MAJOR
  
NORTHGATE 
(0.6 miles)
Sandwell Metropolitan Borough Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 19 Sep 2025
0.6
Details
Share
Follow
6
Sandwell Metropolitan Borough Council logo
MAJOR
  
GRAINGERS LANE 
(0.7 miles)
Sandwell Metropolitan Borough Council
Highway improvement works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 8 Sep 2025 - 17 Oct 2025
0.7
Details
Share
Follow
7
Sandwell Metropolitan Borough Council logo
MAJOR
  
GRAINGERS LANE 
(0.7 miles)
Sandwell Metropolitan Borough Council
Highway improvement works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 8 Sep 2025 - 11 Oct 2025
0.7
Details
Share
Follow
8
Western Power Distribution (West Midlands) logo
URGENT
  
STATION STREET 
(0.7 miles)
Western Power Distribution (West Midlands)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Sep 2025 08:00
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
0.7
Details
Share
Follow
9
Western Power Distribution (West Midlands) logo
URGENT
  
GRAINGERS LANE 
(0.7 miles)
Western Power Distribution (West Midlands)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 17 Sep 2025 08:00
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
0.7
Details
Share
Follow
10
Severn Trent Water logo
URGENT
  
CRADLEY FORGE 
(0.8 miles)
Severn Trent Water
Utility repair and maintenance works - Verge - No carriageway incursion
In Progress
Since: 15 Sep 2025 15:00
(Scheduled: 15 Sep 2025 - 26 Sep 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.