ROADWORKS SUMMARY
Worcester Road, STOURPORT-ON-SEVERN, DY13 9AN
Introduction
View current and future planned roadworks and road closures for Worcester Road, DY13 9AN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Worcester Road, STOURPORT-ON-SEVERN, DY13 9AN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Worcester Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
24 Jul 2024 and 26 Jul 2027
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gorst Hill, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2024 and could run through until 26 July 2027. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 8 Mar 2024 at 13:31.
30 Sep 2026
Worcestershire County Council are carrying out roadworks on Dunley Road, Stourport On Severn.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 15:00 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 1 Apr 2026 at 10:41.
26 Oct 2026
Electricity Network Company are carrying out Utility asset works on Worcester Road, Kidderminster.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2026 at 09:00 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Jul 2026 at 09:09.
5 Oct 2026
Western Power Distribution (West Midlands) are carrying out Utility asset works on Habberley Road, Kidderminster.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 July 2026 at 14:30 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Aug 2026 at 13:49.
6 Nov 2029
Worcestershire County Council are carrying out Highway repair and maintenance works on Lea Lane, Cookley, Kidderminster.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2026 at 00:01 and could run through until 6 November 2029. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 11 Aug 2026 at 14:24.
26 Oct 2026
Electricity Network Company are carrying out Utility asset works on Worcester Road, Kidderminster.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 August 2026 at 14:15 and could run through until 26 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 25 Aug 2026 at 09:19.
26 Aug and 1 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Chester Road North, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Aug 2026 at 08:14.
Tomorrow
Severn Trent Water are carrying out Utility asset works on Elmley Lane, Elmley Lovett.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:15 and could run through until 17 September 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 10 Sep 2026 at 11:57.
1 Sep and 5 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Chester Road North, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Aug 2026 at 13:30.
28 Sep 2026
Severn Trent Water are carrying out Utility asset works on Stanklyn Lane, Stone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 09:30 and could run through until 28 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Sep 2026 at 09:53.
23 Sep 2026
Western Power Distribution (West Midlands) are carrying out Utility asset works on Gilbert Scott Way, Kidderminster.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 12:00 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2026 at 12:33.
14 Sep and 15 Nov 2026
Worcestershire County Council are proposing to carry out Highway improvement works on Pearl Lane, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 15 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Worcestershire County Council on 21 May 2026 at 10:33.
24 Sep 2026
Severn Trent Water are carrying out Utility repair and maintenance works on Vernon Road, Stourport On Severn.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 13:30 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 15:38.
Friday
Severn Trent Water are proposing to carry out New service connection on Coventry Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 20 Jul 2026 at 10:28.
18 Sep and 11 Oct 2026
Severn Trent Water are proposing to carry out Utility asset works on Crown Lane To Elmley Lovett, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 11 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 12:36.
21 and 25 Sep 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Sutton Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Sep 2026 at 08:21.
23 Sep and 6 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Blakebrook, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Sep 2026 at 12:09.
23 Sep and 6 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Blakebrook, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Sep 2026 at 16:47.
23 Sep and 23 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hurcott Road, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Aug 2026 at 14:13.
24 Sep and 7 Oct 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Chester Road South, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 2 Jul 2026 at 10:46.
28 Sep and 16 Nov 2026
Severn Trent Water are proposing to carry out Utility asset works on Butts Lane, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 Aug 2026 at 14:13.
28 Sep and 23 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Chester Road North, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Sep 2026 at 11:23.
29 Sep and 6 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on Roden Avenue, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Aug 2026 at 14:02.
29 Sep and 1 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Elmbridge Lane, Rushock, Droitwich Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Jun 2026 at 10:43.
5 and 9 Oct 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Comhampton Lane, Dunhampton, Ombersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 9 Jul 2026 at 10:49.
5 and 26 Oct 2026
Severn Trent Water are proposing to carry out Utility asset works on Crown Lane To Mount Pleasant, Elmley Lovett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 Jul 2026 at 11:44.
5 and 26 Oct 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Crown Lane To Mount Pleasant, Elmley Lovett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 26 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Aug 2026 at 10:52.
6 and 12 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on Shrubbery Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Aug 2026 at 14:04.
7 and 9 Oct 2026
Severn Trent Water are proposing to carry out New service connection on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Jul 2026 at 10:11.
12 Oct and 20 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tram Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Sep 2026 at 12:22.
15 Oct and 6 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Long Acre, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 11:55.
19 and 30 Oct 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Doverdale Lane, Dunhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 24 Aug 2026 at 14:31.
19 and 30 Oct 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Doverdale Lane, Doverdale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 24 Aug 2026 at 14:29.
19 Oct and 25 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hurcott Road, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Aug 2026 at 13:19.
19 and 22 Oct 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Aug 2026 at 14:47.
21 Oct and 24 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Blakebrook, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 16 Apr 2026 at 12:05.
21 and 23 Oct 2026
BT are proposing to carry out Utility repair and maintenance works on Bramley Way, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Jul 2026 at 15:07.
23 and 27 Oct 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Baxter Avenue, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 12:01.
23 Oct and 18 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Gilbert Scott Way, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Sep 2026 at 11:16.
24 Oct and 1 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Rectory Lane, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Jul 2026 at 07:49.
24 Oct and 1 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Stourport Road, Hartlebury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Jul 2026 at 07:48.
26 and 28 Oct 2026
Worcestershire County Council were proposing to carry out Highway repair and maintenance works on Stagborough Way, Stourport On Severn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 28 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 28 Aug 2026 at 11:42.
26 Oct and 1 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Stagborough Way, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 1 Sep 2026 at 12:26.
26 Oct and 6 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Linden Avenue, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 17 Jun 2026 at 15:19.
26 and 30 Oct 2026
Western Power Distribution (West Midlands) were proposing to carry out roadworks on Shrubbery Street, Kidderminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2026 and run through until 30 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Aug 2026 at 14:03.
26 Oct and 7 Dec 2026
Severn Trent Water are proposing to carry out Utility asset works on Sneads Green To Cutnall Green, Elmley Lovett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 7 December 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2026 at 13:28.
2 and 30 Nov 2026
Severn Trent Water are proposing to carry out Utility asset works on Vicarage Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 30 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 14 May 2026 at 09:24.
2 and 4 Nov 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oxford Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Aug 2026 at 09:38.
2 and 6 Nov 2026
Western Power Distribution (West Midlands) were proposing to carry out roadworks on Roden Avenue, Kidderminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Aug 2026 at 14:01.
2 and 11 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Sep 2026 at 16:44.
2 and 4 Nov 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oxford Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Sep 2026 at 09:21.
4 and 6 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Woodhall Close, Ombersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Jul 2026 at 08:04.
5 and 18 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Aug 2026 at 11:24.
5 and 18 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Cakebole Lane, Chaddesley Corbett, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Aug 2026 at 11:24.
6 Nov and 4 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Radford Avenue, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Aug 2026 at 09:06.
9 and 13 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Pump Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Sep 2026 at 16:55.
12 and 25 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Boreley Lane, Ombersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 12 Aug 2026 at 14:28.
13 and 20 Nov 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Coventry Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Sep 2026 at 14:34.
16 Nov and 7 Dec 2026
Severn Trent Water are proposing to carry out Utility asset works on New Road, Cutnall Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 7 December 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Aug 2026 at 10:54.
16 Nov and 7 Dec 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Broad Common, Cutnall Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Aug 2026 at 10:59.
18 and 20 Nov 2026
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Lincomb Bank, Lincomb, Crossway Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 24 Aug 2026 at 13:31.
18 and 20 Nov 2026
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Lincomb Bank, Lincomb, Crossway Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 24 Aug 2026 at 10:48.
23 Nov and 4 Dec 2026
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Bishops Wood Lane, Crossway Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 24 Aug 2026 at 11:15.
23 Nov and 4 Dec 2026
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Bishops Wood Lane, Crossway Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 24 Aug 2026 at 13:33.
23 and 27 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on B4196 Astley, Astley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 7 Sep 2026 at 08:14.
23 and 27 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on B4196 Astley, Astley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the verge only.
This roadwork event was last updated by Worcestershire County Council on 10 Sep 2026 at 09:23.
23 and 27 Nov 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Deasland Lane, Heightington, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 16 Sep 2026 at 09:44.
25 Nov and 11 Dec 2026
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Bewdley Road, Kidderminster.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2026 and run through until 11 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Sep 2026 at 13:13.
26 Nov 2026 and 22 Jan 2027
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on George Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 22 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Sep 2026 at 16:19.
26 Nov 2026 and 22 Jan 2027
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on George Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 22 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 15:42.
27 Nov and 1 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on Findon Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 15:35.
30 Nov and 2 Dec 2026
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Heightington Road, Bewdley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2026 and run through until 2 December 2026. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 10:17.
30 Nov 2026 and 5 Jan 2027
Severn Trent Water are proposing to carry out Utility asset works on Back Lane, Shenstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 5 January 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 29 Apr 2026 at 11:34.
30 Nov and 11 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Sep 2026 at 13:32.
30 Nov and 11 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fox Lane, Chaddesley Corbett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 3 Sep 2026 at 10:05.
1 and 3 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on Offmore Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 3 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 15:36.
1 and 3 Dec 2026
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heightington Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 3 December 2026. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 14 Sep 2026 at 11:56.
7 and 17 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 17 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Aug 2026 at 14:04.
7 and 9 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on Charles Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 15:37.
7 and 20 Dec 2026
Severn Trent Water are proposing to carry out Utility asset works on Walton Road, Elmley Lovett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 20 December 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 23 Jul 2026 at 11:37.
9 and 23 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hayes Road, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Sep 2026 at 13:58.
9 and 23 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Hayes Road, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Sep 2026 at 12:47.
9 and 15 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Deasland Lane, Heightington, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 15 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Sep 2026 at 14:39.
9 and 12 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on East Street, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 15:37.
11 and 23 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Lane, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 14 Sep 2026 at 14:04.
11 and 23 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Lane, Wolverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2026 and could run through until 23 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 15 Sep 2026 at 12:46.
11 and 15 Dec 2026
Western Power Distribution (West Midlands) are proposing to carry out roadworks on St Georges Terrace, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2026 and could run through until 15 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Aug 2026 at 15:38.
14 Dec 2026 and 14 Jan 2027
Cadent Gas are proposing to carry out Utility asset works on Red Hill, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 14 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 16:30.
14 and 18 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Spennells Valley Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 8 Sep 2026 at 08:47.
14 and 18 Dec 2026
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Spennells Valley Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 10 Sep 2026 at 15:42.
Roadworks Map near to Worcester Road, STOURPORT-ON-SEVERN, DY13 9AN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Worcester Road, STOURPORT-ON-SEVERN, DY13 9AN (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 15 Sep 2026 - 24 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.