ROADWORKS SUMMARY
Glebe Court, BEAMINSTER, DT8 3EZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Glebe Court, DT8 3EZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Glebe Court, BEAMINSTER, DT8 3EZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Glebe Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Silver Street

Network Rail were proposing to carry out Works for Rail Purposes on Silver Street, Misterton, Crewkerne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 May 2025 at 09:29.

Wessex Internet logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
A356 From Junction Lechers Lane East Through Village To Old Post Office

Wessex Internet are proposing to carry out Utility asset works on A356 From Junction Lechers Lane East Through Village To Old Post Office, South Perrott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 7 Aug 2025 at 15:05.

Wessex Internet logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
A356 From Junction Lechers Lane East Through Village To Old Post Office

Wessex Internet are proposing to carry out Utility asset works on A356 From Junction Lechers Lane East Through Village To Old Post Office, South Perrott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Internet on 26 Jun 2025 at 15:10.

Southern Gas Networks logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Mangerton Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Mangerton Lane, Mangerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 15:03.

Southern Gas Networks logo
Between
9 and 13 Sep 2025
Details
View Map
Share
Follow
Mangerton Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Mangerton Lane, Mangerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 13 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 14:20.

Wessex Internet logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Picket Lane

Wessex Internet are proposing to carry out Utility asset works on Picket Lane, South Perrott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 18 Jul 2025 at 14:30.

Wessex Internet logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Picket Lane

Wessex Internet are proposing to carry out Utility asset works on Picket Lane, South Perrott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 26 Jun 2025 at 15:15.

Dorset Council logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pilsdon Lane

Dorset Council are proposing to carry out Highway improvement works on Pilsdon Lane, Pilsdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 29 Jul 2025 at 12:45.

Dorset Council logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pilsdon Lane

Dorset Council are proposing to carry out Highway improvement works on Pilsdon Lane, Pilsdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 2 Sep 2025 at 12:10.

Wessex Internet logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Pretty Box Farm Road North Hill Plantation Junction To Winyards Gap Crossroads

Wessex Internet are proposing to carry out Utility asset works on Pretty Box Farm Road North Hill Plantation Junction To Winyards Gap Crossroads, Chedington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 28 Aug 2025 at 10:35.

BT logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Corscombe Cross Southwest To Down Farm

BT were proposing to carry out Utility asset works on Corscombe Cross Southwest To Down Farm, Corscombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 2 Jul 2025 at 11:32.

BT logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Down Farm To Junction Crabbs Barn Lane

BT were proposing to carry out Utility asset works on Down Farm To Junction Crabbs Barn Lane, Beaminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 2 Jul 2025 at 12:12.

Wessex Water logo
Between
30 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Pymore Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Pymore Road, Pymore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Jul 2025 at 13:45.

Wessex Water logo
Between
30 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Pymore Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Pymore Road, Pymore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Jul 2025 at 14:26.

Dorset Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Broadoak To Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Broadoak To Atrim Road, Broadoak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 28 Aug 2025 at 10:35.

Dorset Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Broadoak To Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Broadoak To Atrim Road, Broadoak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 29 Jul 2025 at 12:25.

Dorset Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Atrim Road, Dottery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 28 Aug 2025 at 10:35.

Dorset Council logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Atrim Road, Dottery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 29 Jul 2025 at 12:25.

BT logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Corscombe Cross Southwest To Down Farm

BT are proposing to carry out Utility asset works on Corscombe Cross Southwest To Down Farm, Corscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Jul 2025 at 12:20.

BT logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Down Farm To Junction Crabbs Barn Lane

BT are proposing to carry out Utility asset works on Down Farm To Junction Crabbs Barn Lane, Beaminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 21 Aug 2025 at 11:05.

BT logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Down Farm To Junction Crabbs Barn Lane

BT are proposing to carry out Utility asset works on Down Farm To Junction Crabbs Barn Lane, Beaminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Jul 2025 at 12:20.

BT logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Corscombe Cross Southwest To Down Farm

BT are proposing to carry out Utility asset works on Corscombe Cross Southwest To Down Farm, Corscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 21 Aug 2025 at 11:05.

Southern Gas Networks logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out New service connection on Church Street, Beaminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:35.


Roadworks Map near to Glebe Court, BEAMINSTER, DT8 3EZ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Glebe Court, BEAMINSTER, DT8 3EZ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.