ROADWORKS SUMMARY
Lower Sea Lane, BRIDPORT, DT6 6LR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lower Sea Lane, DT6 6LR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lower Sea Lane, BRIDPORT, DT6 6LR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Sea Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (South West) logo
LONG TERM
Until
5 Feb 2025
Details
View Map
Share
Follow
Woodhouse Hill

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Woodhouse Hill, Uplyme.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 23:20 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Feb 2024 at 23:28.

Dorset Council logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
B3165 Hawkmoor Hill To Fishpond Bottom Road

Dorset Council are carrying out Highway improvement works on B3165 Hawkmoor Hill To Fishpond Bottom Road, Whitchurch Canonicorum.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2024 at 10:32 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 25 Nov 2024 at 12:00.

Dorset Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Carters Lane

Dorset Council are carrying out Highway improvement works on Carters Lane, Morcombelake.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:24 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 4 Oct 2024 at 08:55.

Dorset Council logo
Finishing
Friday
Details
View Map
Share
Follow
Marine Parade

Dorset Council are carrying out Highway improvement works on Marine Parade, Lyme Regis.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 12:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 25 Nov 2024 at 13:56.

Dorset Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Cobb Road

Dorset Council are carrying out roadworks on Cobb Road, Lyme Regis.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 12:00 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 10 Dec 2024 at 11:00.

Gigaclear logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Pound Lane

Gigaclear are proposing to carry out Utility asset works on Pound Lane, Uplyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 27 Sep 2024 at 15:18.

Gigaclear logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Pound Lane

Gigaclear are proposing to carry out Utility asset works on Pound Lane, Uplyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 14 Oct 2024 at 15:07.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Higher Sea Lane

Southern Gas Networks are proposing to carry out New service connection on Higher Sea Lane, Charmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:20.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Higher Sea Lane

Southern Gas Networks are proposing to carry out New service connection on Higher Sea Lane, Charmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:15.

Western Power Distribution (South West) logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Whitchurch Cross To Cockwell Cross

Western Power Distribution (South West) are proposing to carry out Utility asset works on Whitchurch Cross To Cockwell Cross, Whitchurch Canonicorum.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 7 Nov 2024 at 12:10.

Western Power Distribution (South West) logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Whitchurch Cross To Cockwell Cross

Western Power Distribution (South West) were proposing to carry out Utility asset works on Whitchurch Cross To Cockwell Cross, Whitchurch Canonicorum.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 10:21.

Western Power Distribution (South West) logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Whitchurch Cross To Cockwell Cross

Western Power Distribution (South West) are proposing to carry out Utility asset works on Whitchurch Cross To Cockwell Cross, Whitchurch Canonicorum.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Oct 2024 at 12:25.

Western Power Distribution (South West) logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Gibbs Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Gibbs Lane, Morcombelake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Oct 2024 at 12:30.

Western Power Distribution (South West) logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Gibbs Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Gibbs Lane, Morcombelake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Oct 2024 at 12:25.

Gigaclear logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Swains Cottage To Woodbine Cottage

Gigaclear are proposing to carry out Utility asset works on Road From Swains Cottage To Woodbine Cottage, Uplyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 22 Oct 2024 at 11:28.

Gigaclear logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Road From Swains Cottage To Woodbine Cottage

Gigaclear are proposing to carry out Utility asset works on Road From Swains Cottage To Woodbine Cottage, Uplyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 23 Oct 2024 at 11:07.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Somers Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Somers Road, Lyme Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 17 Dec 2024 at 09:30.

South West Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Pooles Court

South West Water are proposing to carry out Remedial works on Pooles Court, Lyme Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Dec 2024 at 12:20.

South West Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Pooles Court

South West Water were proposing to carry out Remedial works on Pooles Court, Lyme Regis.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Nov 2024 at 08:23.

Wessex Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Moorbath

Wessex Water are proposing to carry out Utility repair and maintenance works on Moorbath, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 17 Dec 2024 at 12:51.

South West Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Tappers Knapp

South West Water are proposing to carry out Utility repair and maintenance works on Tappers Knapp, Uplyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Nov 2024 at 11:26.

Wessex Water logo
Between
7 and 10 Mar 2025
Details
View Map
Share
Follow
Hawkmoor Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Hawkmoor Hill, Marshwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Dec 2024 at 12:45.

South West Water logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Lane Past Chapel Cottage

South West Water were proposing to carry out Permanent reinstatement on Lane Past Chapel Cottage, Rocombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 22 Nov 2024 at 15:14.

South West Water logo
Between
13 and 17 Mar 2025
Details
View Map
Share
Follow
Lane Past Chapel Cottage

South West Water are proposing to carry out Permanent reinstatement on Lane Past Chapel Cottage, Rocombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Nov 2024 at 16:41.


Roadworks Map near to Lower Sea Lane, BRIDPORT, DT6 6LR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lower Sea Lane, BRIDPORT, DT6 6LR (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
NEWLANDS BRIDGE TO JUNCTION A35T 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 17 Dec 2024 09:45
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.