ROADWORKS SUMMARY
Cordova Gardens, BRIDPORT, DT6 3NG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cordova Gardens, DT6 3NG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cordova Gardens, BRIDPORT, DT6 3NG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cordova Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Dorset Council logo
LONG TERM
Until
11 May 2026
Details
View Map
Share
Follow
Carters Lane

Dorset Council are carrying out Highway improvement works on Carters Lane, Morcombelake.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:24 and could run through until 11 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 14 Apr 2025 at 11:35.

Dorset Council logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Icen Lane

Dorset Council are carrying out Highway improvement works on Icen Lane, Shipton Gorge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 11:11 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 14 Apr 2025 at 10:45.

Dorset Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Smishops Lane

Dorset Council are carrying out Highway improvement works on Smishops Lane, Loders.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 18:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 31 Mar 2025 at 09:25.

ESP Electricity logo
LONG TERM
Between
9 May and 22 Jun 2025
Details
View Map
Share
West Allington

ESP Electricity were proposing to carry out Utility asset works on West Allington, Bridport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 May 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 19 Mar 2025 at 16:51.

Dorset Council logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Chilcombe Lane

Dorset Council are carrying out Highway improvement works on Chilcombe Lane, Chilcombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 15:00.

Wessex Water logo
Between
5 and 13 Jun 2025
Details
View Map
Share
Follow
Magdalen Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Magdalen Lane, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 3 Apr 2025 at 15:20.

Western Power Distribution (South West) logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Slape Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Slape Hill, Waytown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 May 2025 at 09:29.

Western Power Distribution (South West) logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Slape Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Slape Hill, Waytown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 20 May 2025 at 11:35.

Western Power Distribution (South West) logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Slape Hill

Western Power Distribution (South West) were proposing to carry out Utility asset works on Slape Hill, Waytown.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 June 2025 and run through until 17 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Apr 2025 at 09:50.

ESP Electricity logo
Between
23 Jun and 17 Jul 2025
Details
View Map
Share
West Allington

ESP Electricity were proposing to carry out Utility asset works on West Allington, Bridport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 17 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 22 May 2025 at 16:33.

Dorset Council logo
Between
26 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Bredy Road

Dorset Council are proposing to carry out Highway improvement works on Bredy Road, Burton Bradstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 25 Mar 2025 at 12:30.

Dorset Council logo
Between
26 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Bredy Road

Dorset Council are proposing to carry out Highway improvement works on Bredy Road, Burton Bradstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Dorset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Firch Lane

Dorset Council are proposing to carry out Highway improvement works on Firch Lane, Walditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Dorset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Walditch Road

Dorset Council were proposing to carry out Highway improvement works on Walditch Road, Walditch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Dorset Council on 26 Feb 2025 at 11:45.

Dorset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Walditch Road

Dorset Council are proposing to carry out Highway improvement works on Walditch Road, Walditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 25 Mar 2025 at 12:30.

Dorset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Walditch Road

Dorset Council are proposing to carry out Highway improvement works on Walditch Road, Walditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Dorset Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Firch Lane

Dorset Council are proposing to carry out Highway improvement works on Firch Lane, Walditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 25 Mar 2025 at 12:25.

Wessex Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Hembury Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Hembury Road, Askerswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 May 2025 at 11:16.

Dorset Council logo
Between
1 and 14 Jul 2025
Details
View Map
Share
Follow
Mangerton Lane

Dorset Council are proposing to carry out Highway improvement works on Mangerton Lane, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 26 Mar 2025 at 12:15.

Dorset Council logo
Between
1 and 14 Jul 2025
Details
View Map
Share
Follow
Mangerton Lane

Dorset Council are proposing to carry out Highway improvement works on Mangerton Lane, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Dorset Council logo
Between
1 and 14 Jul 2025
Details
View Map
Share
Follow
Mangerton Lane

Dorset Council are proposing to carry out Highway improvement works on Mangerton Lane, Mangerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 26 Mar 2025 at 12:15.

Dorset Council logo
Between
1 and 14 Jul 2025
Details
View Map
Share
Follow
Mangerton Lane

Dorset Council are proposing to carry out Highway improvement works on Mangerton Lane, Mangerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Dorset Council logo
Between
1 and 14 Jul 2025
Details
View Map
Share
Follow
Mangerton Lane

Dorset Council are proposing to carry out Highway improvement works on Mangerton Lane, West Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 26 Mar 2025 at 12:15.

Dorset Council logo
Between
1 and 14 Jul 2025
Details
View Map
Share
Follow
Mangerton Lane

Dorset Council are proposing to carry out Highway improvement works on Mangerton Lane, West Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Wessex Water logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Hembury Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Hembury Road, Askerswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 29 Apr 2025 at 12:15.

Dorset Council logo
Between
2 and 15 Jul 2025
Details
View Map
Share
Follow
Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Atrim Road, Dottery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 1 Apr 2025 at 12:05.

Dorset Council logo
Between
2 and 15 Jul 2025
Details
View Map
Share
Follow
Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Atrim Road, Dottery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Dorset Council logo
Between
2 and 15 Jul 2025
Details
View Map
Share
Follow
Broadoak To Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Broadoak To Atrim Road, Broadoak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 1 Apr 2025 at 12:05.

Dorset Council logo
Between
2 and 15 Jul 2025
Details
View Map
Share
Follow
Broadoak To Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Broadoak To Atrim Road, Broadoak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 Apr 2025 at 12:15.

Wessex Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Tizards Knap

Wessex Water are proposing to carry out Remedial works on Tizards Knap, Morcombelake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 29 Apr 2025 at 12:20.

Western Power Distribution (South West) logo
Between
7 and 20 Aug 2025
Details
View Map
Share
North Allington

Western Power Distribution (South West) were proposing to carry out Utility asset works on North Allington, Bridport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 20 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 21 May 2025 at 11:01.

Wessex Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Old Church Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Old Church Road, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 May 2025 at 11:00.


Roadworks Map near to Cordova Gardens, BRIDPORT, DT6 3NG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 21:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cordova Gardens, BRIDPORT, DT6 3NG (21 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Giganet logo
EAST STREET 
(0.2 miles)
Giganet
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
2
Giganet logo
EAST STREET 
(0.2 miles)
Giganet
Utility asset works - Carriageway - Give and take
Cancelled
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
0.2
Details
Share
3
Giganet logo
EAST STREET 
(0.2 miles)
Giganet
Utility asset works - Carriageway - Give and take
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.2
Details
Share
Follow
4
Wessex Water logo
URGENT
  
CHURCH STREET 
(0.2 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
3 Jun 2025 09:00 - 11:25
0.2
Details
Share
5
Wessex Water logo
SOUTH STREET 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
6
Wessex Water logo
SOUTH STREET 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
7
Dorset Council logo
MANOR FIELDS 
(0.4 miles)
Dorset Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.4
Details
Share
Follow
8
ESP Electricity logo
TANNERY ROAD 
(0.4 miles)
ESP Electricity
Utility asset works - Footway - Two-way signals
Planned
Scheduled: 2 Jun 2025 - 13 Jun 2025
0.4
Details
Share
Follow
9
ESP Electricity logo
TANNERY ROAD 
(0.4 miles)
ESP Electricity
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 07:00
(Scheduled: 2 Jun 2025 - 13 Jun 2025)
0.4
Details
Share
Follow
10
ESP Electricity logo
ST MICHAELS LANE 
(0.4 miles)
ESP Electricity
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 2 Jun 2025 - 13 Jun 2025
0.4
Details
Share
Follow
  • ...