ROADWORKS SUMMARY
Blind Lane Close, BRIDPORT, DT6 3FE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Blind Lane Close, DT6 3FE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Blind Lane Close, BRIDPORT, DT6 3FE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Blind Lane Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Dorset Council logo
LONG TERM
Until
8 May 2025
Details
View Map
Share
Follow
Smishops Lane

Dorset Council are carrying out Highway improvement works on Smishops Lane, Loders.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 November 2023 at 00:00 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 19 Dec 2024 at 14:40.

Dorset Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Marsh Farm Road Junction To Coltleigh Farm Plantation

Dorset Council are carrying out Remedial works on Marsh Farm Road Junction To Coltleigh Farm Plantation, Mapperton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 February 2024 at 12:48 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 Sep 2024 at 16:15.

Dorset Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Carters Lane

Dorset Council are carrying out Highway improvement works on Carters Lane, Morcombelake.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:24 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 4 Oct 2024 at 08:55.

Dorset Council logo
LONG TERM
Until
14 Apr 2025
Details
View Map
Share
Follow
Icen Lane

Dorset Council are carrying out Highway improvement works on Icen Lane, Shipton Gorge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 11:11 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 14 Oct 2024 at 12:50.

Giganet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Well Plot To New Road

Giganet are proposing to carry out Utility asset works on Well Plot To New Road, Uploders.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Giganet on 25 Oct 2024 at 09:08.

Dorset Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Atrim Road

Dorset Council are proposing to carry out Highway improvement works on Atrim Road, Dottery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 17 Dec 2024 at 12:55.

Dorset Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Atrim Road

Dorset Council are carrying out Highway improvement works on Atrim Road, Dottery.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 Jan 2025 at 09:35.

Wessex Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Moorbath

Wessex Water are proposing to carry out Utility repair and maintenance works on Moorbath, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 13 Jan 2025 at 13:40.

Western Power Distribution (South West) logo
Between
20 Feb and 13 Mar 2025
Details
View Map
Share
Follow
West Allington

Western Power Distribution (South West) are proposing to carry out Utility asset works on West Allington, Bridport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Jan 2025 at 13:15.

Western Power Distribution (South West) logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
West Allington

Western Power Distribution (South West) are proposing to carry out Utility asset works on West Allington, Bridport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Jan 2025 at 12:20.

Western Power Distribution (South West) logo
Between
28 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Furleigh Cross Kingsland To Silkhay Farms Junction

Western Power Distribution (South West) are proposing to carry out Utility asset works on Furleigh Cross Kingsland To Silkhay Farms Junction, Netherbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 17 Dec 2024 at 12:45.

Western Power Distribution (South West) logo
Between
28 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Furleigh Cross Kingsland To Silkhay Farms Junction

Western Power Distribution (South West) are proposing to carry out Utility asset works on Furleigh Cross Kingsland To Silkhay Farms Junction, Netherbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Dec 2024 at 12:15.

Wessex Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Moorbath

Wessex Water are proposing to carry out Utility repair and maintenance works on Moorbath, Bridport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 14 Jan 2025 at 12:32.

Western Power Distribution (South West) logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
White Sheet Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on White Sheet Hill, Beaminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 17 Dec 2024 at 12:45.

Western Power Distribution (South West) logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
White Sheet Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on White Sheet Hill, Beaminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Dec 2024 at 12:15.

Western Power Distribution (South West) logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
West Mead

Western Power Distribution (South West) are proposing to carry out Utility asset works on West Mead, Bridport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Jan 2025 at 14:49.

Western Power Distribution (South West) logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Lodge Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Lodge Lane, Bridport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Jan 2025 at 14:49.


Roadworks Map near to Blind Lane Close, BRIDPORT, DT6 3FE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 30 Jan 2025 23:22
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Blind Lane Close, BRIDPORT, DT6 3FE (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
KINGS HEAD HILL 
(0.2 miles)
BT
Utility asset works - Carriageway - Two-way signals
Planned
Scheduled: 30 Jan 2025 - 31 Jan 2025
0.2
Details
Share
Follow
2
Giganet logo
MAIN STREET 
(0.8 miles)
Giganet
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 30 Jan 2025 09:30
(Scheduled: 30 Jan 2025 - 3 Feb 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.