ROADWORKS SUMMARY
Stourcastle, STURMINSTER NEWTON, DT10 1FF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Stourcastle, DT10 1FF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Stourcastle, STURMINSTER NEWTON, DT10 1FF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stourcastle are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Copse Hill To Angers Lane - Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Copse Hill To Angers Lane - Road, Broad Oak.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 December 2024 at 10:00 and could run through until 30 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 09:35.

Wessex Internet logo
Finishing
Friday
Details
View Map
Share
Follow
Pleck

Wessex Internet are proposing to carry out Utility asset works on Pleck, Marnhull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 28 Nov 2024 at 11:50.

Dorset Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Back Lane

Dorset Council are proposing to carry out Highway improvement works on Back Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Feb 2025 at 10:21.

Dorset Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Greenhayes

Dorset Council are proposing to carry out Section 50 on Greenhayes, Okeford Fitzpaine.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Mar 2025 at 12:20.

Dorset Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Greenhayes

Dorset Council are proposing to carry out Highway improvement works on Greenhayes, Okeford Fitzpaine.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 13 Feb 2025 at 16:05.

Dorset Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Back Lane

Dorset Council are proposing to carry out Highway improvement works on Back Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 20 Mar 2025 at 16:20.

Wessex Water logo
Between
1 and 7 Apr 2025
Details
View Map
Share
Follow
Stearts Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Stearts Lane, Hinton St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 7 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 7 Nov 2024 at 15:45.

Wessex Water logo
Between
7 Apr and 5 May 2025
Details
View Map
Share
Follow
Stearts Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Stearts Lane, Hinton St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 7 Nov 2024 at 15:50.

Wessex Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Cat Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Cat Lane, Stourton Caundle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 21 Jan 2025 at 10:10.

Wessex Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Cat Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Cat Lane, Stourton Caundle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 21 Jan 2025 at 14:40.

Gigaclear logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Station Road

Gigaclear were proposing to carry out Utility asset works on Station Road, Stalbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 21 Jan 2025 at 14:06.

Gigaclear logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Church Hill

Gigaclear were proposing to carry out Utility asset works on Church Hill, Stalbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 11:23.

Gigaclear logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Church Hill

Gigaclear were proposing to carry out Utility asset works on Church Hill, Stalbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 29 Jan 2025 at 09:58.

Wessex Internet logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Back Lane

Wessex Internet are proposing to carry out Utility asset works on Back Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 11 Mar 2025 at 09:00.

Gigaclear logo
Between
5 and 7 May 2025
Details
View Map
Share
Follow
Green Close

Gigaclear are proposing to carry out Remedial works on Green Close, Sturminster Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 30 Jan 2025 at 16:05.

Dorset Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Kingston Lane To Military Lane - Lane

Dorset Council are proposing to carry out Highway improvement works on Kingston Lane To Military Lane - Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 13 Mar 2025 at 15:15.

Dorset Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Kingston Lane To Military Lane - Lane

Dorset Council are proposing to carry out Highway improvement works on Kingston Lane To Military Lane - Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Mar 2025 at 12:16.

Dorset Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Silly Hill To Kingston Lane - Lane

Dorset Council are proposing to carry out Highway improvement works on Silly Hill To Kingston Lane - Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 13 Mar 2025 at 15:15.

Dorset Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Silly Hill To Kingston Lane - Lane

Dorset Council are proposing to carry out Highway improvement works on Silly Hill To Kingston Lane - Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Mar 2025 at 12:16.

Dorset Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Silly Hill

Dorset Council are proposing to carry out Highway improvement works on Silly Hill, Woodrow, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 13 Mar 2025 at 15:15.

Dorset Council logo
Between
6 and 19 May 2025
Details
View Map
Share
Follow
Silly Hill

Dorset Council are proposing to carry out Highway improvement works on Silly Hill, Woodrow, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Mar 2025 at 12:16.

Wessex Internet logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Back Lane

Wessex Internet are proposing to carry out Utility asset works on Back Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 27 Feb 2025 at 10:40.

Dorset Council logo
Between
7 and 20 May 2025
Details
View Map
Share
Follow
Kingston Lane

Dorset Council are proposing to carry out Highway improvement works on Kingston Lane, Kingston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:06.

Dorset Council logo
Between
7 and 20 May 2025
Details
View Map
Share
Kingston Lane

Dorset Council were proposing to carry out Highway improvement works on Kingston Lane, Kingston, Hazelbury Bryan.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 May 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Dorset Council on 18 Feb 2025 at 11:06.

Dorset Council logo
Between
8 and 21 May 2025
Details
View Map
Share
Follow
Shillingstone Lane

Dorset Council are proposing to carry out Highway improvement works on Shillingstone Lane, Okeford Fitzpaine.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:06.

Dorset Council logo
Between
8 and 21 May 2025
Details
View Map
Share
Follow
Lanchards

Dorset Council are proposing to carry out Highway improvement works on Lanchards, Shillingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:06.

Dorset Council logo
Between
8 and 21 May 2025
Details
View Map
Share
Follow
Poplar Hill

Dorset Council are proposing to carry out Highway improvement works on Poplar Hill, Shillingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:06.

Dorset Council logo
Between
9 and 22 May 2025
Details
View Map
Share
Follow
Higher Street To Belchalwell Street - Road

Dorset Council are proposing to carry out Highway improvement works on Higher Street To Belchalwell Street - Road, Okeford Fitzpaine.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:06.

Dorset Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Locketts Farm To Dairy House Farm Access - Lane

Dorset Council are proposing to carry out Highway improvement works on Locketts Farm To Dairy House Farm Access - Lane, Droop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:10.

Dorset Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Droop To Locketts Farm - Lane

Dorset Council are proposing to carry out Highway improvement works on Droop To Locketts Farm - Lane, Droop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:10.

Gigaclear logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Penny Street

Gigaclear are proposing to carry out Utility asset works on Penny Street, Sturminster Newton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 11 Feb 2025 at 10:10.

Dorset Council logo
Between
15 and 27 May 2025
Details
View Map
Share
Follow
Marsh Lane

Dorset Council are proposing to carry out Highway improvement works on Marsh Lane, Wonston, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 11 Mar 2025 at 09:10.

Dorset Council logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Bere Marsh

Dorset Council are proposing to carry out Highway improvement works on Bere Marsh, Shillingstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 13 Mar 2025 at 09:50.

Wessex Water logo
LONG TERM
Between
2 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Stearts Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Stearts Lane, Hinton St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 27 Feb 2025 at 10:40.

Wessex Water logo
LONG TERM
Between
2 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Stearts Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Stearts Lane, Hinton St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 4 Mar 2025 at 12:05.

Dorset Council logo
Between
4 and 13 Jun 2025
Details
View Map
Share
Follow
The Common

Dorset Council are proposing to carry out Highway improvement works on The Common, Kings Stag.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 Feb 2025 at 10:45.

Dorset Council logo
Between
4 and 13 Jun 2025
Details
View Map
Share
Follow
The Common

Dorset Council are proposing to carry out Highway improvement works on The Common, Woodrow, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 Feb 2025 at 10:45.

Dorset Council logo
Between
4 and 13 Jun 2025
Details
View Map
Share
Follow
The Causeway

Dorset Council are proposing to carry out Highway improvement works on The Causeway, Hazelbury Bryan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 Feb 2025 at 10:45.

Wessex Internet logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Copse Hill

Wessex Internet are proposing to carry out Utility asset works on Copse Hill, Broad Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 10 Mar 2025 at 20:28.

Wessex Internet logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Copse Hill To Angers Lane - Road

Wessex Internet are proposing to carry out Utility asset works on Copse Hill To Angers Lane - Road, Broad Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 10 Mar 2025 at 20:30.

Wessex Internet logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
New Road

Wessex Internet are proposing to carry out Utility asset works on New Road, Broad Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 10 Mar 2025 at 20:25.

Wessex Internet logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Common Lane

Wessex Internet are proposing to carry out Utility asset works on Common Lane, Broad Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 10 Mar 2025 at 20:16.


Roadworks Map near to Stourcastle, STURMINSTER NEWTON, DT10 1FF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Mar 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Stourcastle, STURMINSTER NEWTON, DT10 1FF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
ELM CLOSE 
(0.1 miles)
Last Mile Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Mar 2025 09:44
(Scheduled: 20 Mar 2025 - 26 Mar 2025)
0.1
Details
Share
Follow
2
Wessex Water logo
URGENT
  
NEW ROAD 
(1.0 miles)
Wessex Water
Utility repair and maintenance works - Verge - Some carriageway incursion
Complete
20 Mar 2025 14:03 - 16:02
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.