ROADWORKS SUMMARY
Southfield Avenue, GRIMSBY, DN33 2NX
Introduction
View current and future planned roadworks and road closures for Southfield Avenue, DN33 2NX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Southfield Avenue, GRIMSBY, DN33 2NX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Southfield Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Feb 2026
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Corporation Road, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2023 at 11:00 and could run through until 6 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 7 Aug 2024 at 09:14.
4 Dec 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Cleethorpe Road, Grimsby.
These works are categorised as Major.
The works started on 26 February 2024 at 20:00 and could run through until 4 December 2024. The works will impact the carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North East Lincolnshire Council on 26 Feb 2024 at 20:28.
23 Aug 2025
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Conway Avenue, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 January 2024 at 10:30 and could run through until 23 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 26 Jan 2024 at 11:07.
4 Dec 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Gilbey Road Cycle Track, Grimsby.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 26 February 2024 at 09:30 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 26 Feb 2024 at 09:45.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Frederick Ward Way, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:12.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Wellowgate, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:11.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Church Lane, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:12.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Bargate, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:11.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Deansgate, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:11.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Cartergate, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:08.
29 Nov 2024
North East Lincolnshire Council are carrying out Highway repair and maintenance works on Grosvenor Street, Grimsby.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 9 Oct 2024 at 15:11.
30 Sep and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Weelsby Road, Grimsby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Jun 2024 at 13:05.
24 Dec 2024
Cadent Gas are carrying out Utility asset works on Weelsby Road, Grimsby.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 09:45 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:22.
21 Oct and 16 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Peaks Lane, Grimsby.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:52.
2 Nov and 20 Dec 2024
North East Lincolnshire Council are proposing to carry out Remedial works on A180 From Lock Hill Roundabout To Pyewipe Roundabout, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2024 and could run through until 20 December 2024. The works will impact the carriageway, verge, cycleway and footpath.
This roadwork event was last updated by North East Lincolnshire Council on 1 Nov 2024 at 15:50.
4 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 14:54.
4 Dec 2024
Cadent Gas are carrying out Utility asset works on Cooks Lane, Great Coates.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 08:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:12.
11 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Great Coates.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 13:58.
11 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Great Coates.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 15:42.
9 Dec 2024
Cadent Gas are carrying out Utility asset works on Station Road, Great Coates.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:32.
11 Nov and 13 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Lord Street, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 16:28.
Monday
Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 14:03.
Monday
Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 14:54.
Monday
Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 15:38.
Monday
Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:00.
Monday
Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 14:14.
11 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Heneage Road, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2024 at 14:07.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cooks Lane, Great Coates.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 15:42.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Recto Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:53.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cooks Lane, Great Coates.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 13:58.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Recto Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2024 at 12:58.
20 Dec 2024
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Lord Street, Grimsby.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 12:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Nov 2024 at 11:07.
Today
Anglian Water are proposing to carry out Utility repair and maintenance works on Sea View Street, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 29 Aug 2024 at 15:19.
Monday
Anglian Water were proposing to carry out Utility repair and maintenance works on Pasture Street, Grimsby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 5 Nov 2024 at 09:28.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Laceby Road, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Aug 2024 at 16:36.
Tomorrow
Anglian Water were proposing to carry out Utility repair and maintenance works on Laceby Road, Grimsby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Aug 2024 at 16:06.
Tomorrow
Anglian Water are carrying out Utility repair and maintenance works on Wells Road, Healing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 04:12 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 04:13.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Wells Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 3 Sep 2024 at 09:28.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Wells Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 29 Aug 2024 at 15:13.
Monday
Anglian Water are carrying out Utility repair and maintenance works on Sea View Street, Cleethorpes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 18:27 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 18:27.
Monday
Anglian Water are proposing to carry out Utility repair and maintenance works on Sea View Street, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 15:44.
Monday
Anglian Water were proposing to carry out Utility repair and maintenance works on Sea View Street, Cleethorpes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2024 and run through until 25 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 22 Oct 2024 at 11:26.
22 Nov and 2 Dec 2024
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Gilbey Road Industrial, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 2 December 2024. The works will impact the footway, cycleway and footpath.
This roadwork event was last updated by North East Lincolnshire Council on 16 Sep 2024 at 10:02.
26 Nov and 5 Dec 2024
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Railway Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 9 Sep 2024 at 15:52.
2 and 16 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Weelsby Road, Grimsby.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:39.
9 and 13 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Rowlandson Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 May 2024 at 14:49.
10 and 12 Dec 2024
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on St Peters Avenue, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 17 Sep 2024 at 14:42.
10 and 12 Dec 2024
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Freeman Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 17 Sep 2024 at 14:50.
17 Dec 2024 and 7 Jan 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Birchin Way, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 17 Sep 2024 at 14:23.
27 Dec 2024 and 10 Jan 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Trinity Road, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 4 Oct 2024 at 10:45.
27 Dec 2024 and 17 Jan 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Littlefield Lane, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 13:48.
27 Dec 2024 and 2 Jan 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Town Hall Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 13:46.
27 Dec 2024 and 2 Jan 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Victoria Street West, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 13:44.
2 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tyler Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:13.
2 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:58.
2 and 16 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kelham Road, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:59.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 14:46.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:41.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kelham Road, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:08.
7 and 9 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Rosemary Way, Cleethorpes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 Sep 2024 at 10:44.
9 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:59.
9 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 14:58.
9 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:41.
9 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Beacon Court, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:00.
9 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Beacon Court, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:08.
13 and 24 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Hatcliffe Road, West Ravendale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Oct 2024 at 11:54.
20 Jan and 4 Feb 2025
North East Lincolnshire Council were proposing to carry out Highway repair and maintenance works on Poplar Road, Cleethorpes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North East Lincolnshire Council on 11 Nov 2024 at 14:49.
20 Jan and 29 Mar 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Armstrong Street, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by North East Lincolnshire Council on 25 Jun 2024 at 10:33.
22 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cartergate, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 13:30.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:08.
27 and 31 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Wells Road, Healing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Nov 2024 at 16:37.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out roadworks on Hainton Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:30.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jun 2024 at 10:40.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:52.
27 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:35.
27 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:53.
27 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:30.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out roadworks on Hainton Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:42.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out roadworks on Hainton Avenue, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:00.
27 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:37.
6 and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Granville Street, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:46.
6 and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Granville Street, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:36.
10 and 16 Feb 2025
North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Westward Ho, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North East Lincolnshire Council on 19 Jun 2024 at 14:57.
13 and 27 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Patrick Street, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:43.
13 and 27 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Patrick Street, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:36.
17 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 16:25.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Heneage Road, Grimsby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 13:39.
17 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 16:24.
Roadworks Map near to Southfield Avenue, GRIMSBY, DN33 2NX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Southfield Avenue, GRIMSBY, DN33 2NX (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Oct 2024 - 29 Nov 2024)
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.