ROADWORKS SUMMARY
Magrath Court, BRIGG, DN20 8TS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Magrath Court, DN20 8TS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Magrath Court, BRIGG, DN20 8TS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Magrath Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Between
23 Jul 2023 and 23 Jan 2025
Details
View Map
Share
Follow
A18 Between Wrawby And Barnetby Top

Anglian Water are proposing to carry out Utility asset works on A18 Between Wrawby And Barnetby Top, Melton Ross.

These works are categorised as Major.

The works will start on or after 23 July 2023 and could run through until 23 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 19 May 2023 at 07:15.

Anglian Water logo
LONG TERM
Between
23 Jul 2023 and 23 Jan 2025
Details
View Map
Share
Follow
A18 Between Wrawby And Barnetby Top

Anglian Water are proposing to carry out Utility asset works on A18 Between Wrawby And Barnetby Top, Wrawby.

These works are categorised as Major.

The works will start on or after 23 July 2023 and could run through until 23 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 19 May 2023 at 07:15.

Anglian Water logo
LONG TERM
Between
20 Aug 2023 and 20 Jan 2025
Details
View Map
Share
Follow
Kettleby Lane

Anglian Water are proposing to carry out Utility asset works on Kettleby Lane, Wrawby.

These works are categorised as Major.

The works will start on or after 20 August 2023 and could run through until 20 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 18 Jul 2023 at 10:47.

Anglian Water logo
LONG TERM
Between
21 Aug 2023 and 20 Apr 2025
Details
View Map
Share
Follow
Middlegate Lane

Anglian Water are proposing to carry out Utility asset works on Middlegate Lane, Elsham.

These works are categorised as Major.

The works will start on or after 21 August 2023 and could run through until 20 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 31 May 2023 at 08:37.

Anglian Water logo
LONG TERM
Between
21 Aug 2023 and 20 Apr 2025
Details
View Map
Share
Follow
C121 Between Barnetby Top And Elsham

Anglian Water are proposing to carry out Utility asset works on C121 Between Barnetby Top And Elsham, Elsham.

These works are categorised as Major.

The works will start on or after 21 August 2023 and could run through until 20 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 1 Jun 2023 at 05:35.

Anglian Water logo
LONG TERM
Between
27 Aug 2023 and 27 Feb 2025
Details
View Map
Share
Follow
Guilicarr Lane

Anglian Water are proposing to carry out Utility asset works on Guilicarr Lane, North Kelsey.

These works are categorised as Major.

The works will start on or after 27 August 2023 and could run through until 27 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 27 Jun 2023 at 12:42.

Anglian Water logo
LONG TERM
Between
3 Sep 2023 and 3 Mar 2025
Details
View Map
Share
Follow
Howsham Road

Anglian Water are proposing to carry out Utility asset works on Howsham Road, Howsham.

These works are categorised as Major.

The works will start on or after 3 September 2023 and could run through until 3 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 9 Jun 2023 at 06:36.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Bigby Road

Cadent Gas are proposing to carry out Utility asset works on Bigby Road, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 09:05.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Ings Lane

Cadent Gas are proposing to carry out Utility asset works on Ings Lane, Hibaldstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2024 at 07:59.

Cadent Gas logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Ings Lane

Cadent Gas are carrying out Utility asset works on Ings Lane, Hibaldstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 09:20 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:27.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Nookings Drive

Cadent Gas are proposing to carry out Utility asset works on Nookings Drive, Hibaldstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Jul 2024 at 07:53.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
The Millfield

Cadent Gas are proposing to carry out Utility asset works on The Millfield, Hibaldstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2024 at 07:59.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
The Millfield

Cadent Gas are carrying out Utility asset works on The Millfield, Hibaldstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 08:35.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Howsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Nov 2024 at 09:13.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Howsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Oct 2024 at 09:49.

Cadent Gas logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 07:50.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Scawby Road

Cadent Gas are proposing to carry out Utility asset works on Scawby Road, Scawby Brook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 00:10.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Scawby Road

Cadent Gas are proposing to carry out Utility asset works on Scawby Road, Scawby Brook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:08.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Scawby Road

Cadent Gas are proposing to carry out Utility asset works on Scawby Road, Scawby Brook.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 07:55.

North Lincolnshire Council logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Ings Lane

North Lincolnshire Council are proposing to carry out Highway improvement works on Ings Lane, Hibaldstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by North Lincolnshire Council on 21 Nov 2024 at 08:52.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 10:20.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Manley Gardens

Cadent Gas are proposing to carry out Utility asset works on Manley Gardens, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 07:47.

Cadent Gas logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Bigby High Road

Cadent Gas were proposing to carry out Utility asset works on Bigby High Road, Kettleby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 11:45.

Northern Powergrid (Yorkshire) logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Lidgett Close

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lidgett Close, Scawby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Oct 2024 at 13:08.

Northern Powergrid (Yorkshire) logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Lidgett Close

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lidgett Close, Scawby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Dec 2024 at 08:17.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Scawby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 17 Oct 2024 at 10:09.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
West Terrace

Cadent Gas are proposing to carry out Utility asset works on West Terrace, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:08.

North Lincolnshire Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ermine Street

North Lincolnshire Council are proposing to carry out Utility asset works on Ermine Street, Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 12 Nov 2024 at 07:55.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Kiln Lane

Cadent Gas are proposing to carry out Utility asset works on Kiln Lane, Brigg.

These works are categorised as Major.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:14.

Cadent Gas logo
LONG TERM
Between
30 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Bigby Road

Cadent Gas are proposing to carry out Utility asset works on Bigby Road, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 08:00.

Cadent Gas logo
LONG TERM
Between
3 Feb and 24 Mar 2025
Details
View Map
Share
Bigby High Road

Cadent Gas were proposing to carry out Utility asset works on Bigby High Road, Kettleby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 12:54.

Cadent Gas logo
LONG TERM
Between
3 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Bigby High Road

Cadent Gas are proposing to carry out Utility asset works on Bigby High Road, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:17.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
The Copse

Cadent Gas are proposing to carry out Utility asset works on The Copse, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:42.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Manley Gardens

Cadent Gas are proposing to carry out Utility asset works on Manley Gardens, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 10:42.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Manley Gardens

Cadent Gas are proposing to carry out Utility asset works on Manley Gardens, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:37.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Copse

Cadent Gas are proposing to carry out Utility asset works on The Copse, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:42.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Pingley Lane

Cadent Gas are proposing to carry out Utility asset works on Pingley Lane, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 08:35.

Cadent Gas logo
LONG TERM
Between
27 Feb and 17 Apr 2025
Details
View Map
Share
Follow
Bigby Road

Cadent Gas are proposing to carry out Utility asset works on Bigby Road, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:46.

North Lincolnshire Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
A15 Link Between A18 And M180

North Lincolnshire Council are proposing to carry out Utility asset works on A15 Link Between A18 And M180, Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

North Lincolnshire Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
A15 Between M180 And Staniwells

North Lincolnshire Council are proposing to carry out Utility asset works on A15 Between M180 And Staniwells, Scawby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 31 Oct 2024 at 12:52.

Anglian Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Road, Somerby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 11:53.


Roadworks Map near to Magrath Court, BRIGG, DN20 8TS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 04:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Magrath Court, BRIGG, DN20 8TS (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
WRAWBY STREET 
(0.1 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 16 Dec 2024 08:02
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.1
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
PRESTON DRIVE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 5 Dec 2024 - 23 Dec 2024)
0.3
Details
Share
3
Cadent Gas logo
MAJOR
  
HAWTHORN AVENUE 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 5 Dec 2024 - 19 Dec 2024)
0.3
Details
Share
4
Cadent Gas logo
BRIDGE STREET 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.4
Details
Share
Follow
5
North Lincolnshire Council logo
WRAWBY ROAD 
(0.5 miles)
North Lincolnshire Council
Highway improvement works - Verge, Footpath - Some carriageway incursion
In Progress
Since: 9 Dec 2024 00:00
(Scheduled: 9 Dec 2024 - 21 Dec 2024)
0.5
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
BIGBY ROAD 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 24 Oct 2024 - 24 Dec 2024
0.6
Details
Share
Follow
7
Cadent Gas logo
EMERGENCY
  
WATERS EDGE 
(0.6 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 2 Dec 2024 09:40
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.6
Details
Share
Follow
8
Cadent Gas logo
EMERGENCY
  
SCAWBY ROAD 
(0.6 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Verge - Two-way signals
In Progress
Since: 2 Dec 2024 09:48
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.6
Details
Share
Follow
9
Anglian Water logo
URGENT
  
BURGESS ROAD 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Footway - Two-way signals
Complete
13 Dec 2024 09:42 - 10:25
0.7
Details
Share
10
Anglian Water logo
BURGESS ROAD 
(0.7 miles)
Anglian Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.