ROADWORKS SUMMARY
The Hill, BRIGG, DN20 0NP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Hill, DN20 0NP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Hill, BRIGG, DN20 0NP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Hill are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Bigby Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bigby Road, Brigg.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:30 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 May 2025 at 08:55.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
5 May and 10 Jun 2025
Details
View Map
Share
Follow
Bigby Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Bigby Road, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Jan 2025 at 07:52.

Network Rail logo
Finishing
Thursday
Details
View Map
Share
Follow
Bigby Road

Network Rail are proposing to carry out Works for Rail Purposes on Bigby Road, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Dec 2024 at 07:33.

Network Rail logo
Finishing
Thursday
Details
View Map
Share
Follow
Bigby Road

Network Rail are carrying out Works for Rail Purposes on Bigby Road, Brigg.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 20:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Jun 2025 at 08:45.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
A15 From Elsham Wold Junction To M180

National Highways are proposing to carry out Works for road purposes on A15 From Elsham Wold Junction To M180, Elsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 22 May 2025 at 08:31.

National Highways logo
Finishing
Saturday
Details
View Map
Share
Follow
A15 From A1077 To B1206

National Highways are proposing to carry out Works for road purposes on A15 From A1077 To B1206, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 May 2025 at 07:53.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Westrum Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Westrum Lane, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 May 2025 at 09:01.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Westrum Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Westrum Lane, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 May 2025 at 09:46.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Westrum Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Westrum Lane, Brigg.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 May 2025 at 07:39.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
11 Jun and 22 Jul 2025
Details
View Map
Share
Follow
Albert Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Albert Street, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jan 2025 at 08:33.

North Lincolnshire Council logo
Between
22 and 29 Jun 2025
Details
View Map
Share
Follow
Santon Lane

North Lincolnshire Council are proposing to carry out Utility asset works on Santon Lane, Santon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 15 May 2025 at 10:41.

North Lincolnshire Council logo
Between
15 and 29 Jul 2025
Details
View Map
Share
Follow
Silversides Lane

North Lincolnshire Council are proposing to carry out Utility asset works on Silversides Lane, Scawby Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 21 May 2025 at 09:52.

North Lincolnshire Council logo
Between
16 and 30 Jul 2025
Details
View Map
Share
Follow
River Meadow

North Lincolnshire Council are proposing to carry out Utility asset works on River Meadow, Scawby Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 21 May 2025 at 09:52.

Northern Powergrid (Yorkshire) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
New Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on New Street, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Jan 2025 at 10:35.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
21 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Albert Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Albert Street, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Jan 2025 at 08:45.

Northern Powergrid (Yorkshire) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
New Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on New Street, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jan 2025 at 13:18.

Northern Powergrid (Yorkshire) logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Lunns Crescent

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Lunns Crescent, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 May 2025 at 10:43.

Northern Powergrid (Yorkshire) logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Lunns Crescent

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Lunns Crescent, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 May 2025 at 14:38.

North Lincolnshire Council logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Santon Lane

North Lincolnshire Council are proposing to carry out Utility asset works on Santon Lane, Santon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 4 Apr 2025 at 14:19.

North Lincolnshire Council logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Silversides Lane

North Lincolnshire Council are proposing to carry out Utility asset works on Silversides Lane, Scawby Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 4 Apr 2025 at 11:06.

North Lincolnshire Council logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
River Meadow

North Lincolnshire Council are proposing to carry out Utility asset works on River Meadow, Scawby Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 8 Apr 2025 at 09:30.

Northern Powergrid (Yorkshire) logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Brigg Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Brigg Road, Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Jun 2025 at 12:48.

Anglian Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Bigby High Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Bigby High Road, Brigg.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 12 May 2025 at 13:04.

Anglian Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Barnetby Lane

Anglian Water are proposing to carry out New service connection on Barnetby Lane, Elsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 29 May 2025 at 09:45.

Anglian Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Barnetby Lane

Anglian Water were proposing to carry out New service connection on Barnetby Lane, Elsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 22 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 22 May 2025 at 16:23.


Roadworks Map near to The Hill, BRIGG, DN20 0NP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 22:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Hill, BRIGG, DN20 0NP (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.