ROADWORKS SUMMARY
Simpson Close, BARROW-UPON-HUMBER, DN19 7BL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Simpson Close, DN19 7BL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Simpson Close, BARROW-UPON-HUMBER, DN19 7BL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Simpson Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Between
11 Feb 2021 and 31 Jul 2025
Details
View Map
Share
Follow
Vicar Lane

National Highways are proposing to carry out Highway improvement works on Vicar Lane, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2021 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 14:22.

National Highways logo
LONG TERM
Between
21 Oct 2021 and 31 Jul 2025
Details
View Map
Share
Follow
Commercial Road

National Highways are proposing to carry out Highway improvement works on Commercial Road, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2021 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 15:13.

National Highways logo
LONG TERM
Between
1 Jan 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Waterhouse Lane

National Highways are proposing to carry out Highway improvement works on Waterhouse Lane, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 15:14.

National Highways logo
LONG TERM
Between
13 Jun 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Fish Street

National Highways are proposing to carry out Highway improvement works on Fish Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 14:21.

National Highways logo
LONG TERM
Between
23 Jun 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Market Place

National Highways are proposing to carry out Highway improvement works on Market Place, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 14:37.

National Highways logo
LONG TERM
Between
1 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Ferensway

National Highways are proposing to carry out Highway improvement works on Ferensway, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 31 July 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 30 Nov 2023 at 09:55.

National Highways logo
LONG TERM
Between
1 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
St James Street

National Highways are proposing to carry out Highway improvement works on St James Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 15:11.

National Highways logo
LONG TERM
Between
1 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
William Street

National Highways are proposing to carry out Highway improvement works on William Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 15:05.

National Highways logo
LONG TERM
Between
1 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Ferensway

National Highways are proposing to carry out Highway improvement works on Ferensway, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 30 Nov 2023 at 09:55.

National Highways logo
LONG TERM
Between
1 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Cogan Street

National Highways are proposing to carry out Highway improvement works on Cogan Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 14:30.

National Highways logo
LONG TERM
Between
11 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Princes Dock Street

National Highways are proposing to carry out Highway improvement works on Princes Dock Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 30 Nov 2023 at 14:24.

National Highways logo
LONG TERM
Between
27 Sep 2023 and 31 Jul 2025
Details
View Map
Share
Follow
Dagger Lane

National Highways are proposing to carry out Highway improvement works on Dagger Lane, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2023 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 7 Dec 2023 at 14:21.

East Riding Of Yorkshire Council logo
LONG TERM
Between
14 Oct 2024 and 18 Oct 2025
Details
View Map
Share
Follow
Boothferry Road Roundabout

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Boothferry Road Roundabout, Hessle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 18 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Riding Of Yorkshire Council on 7 Aug 2024 at 14:22.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hawthorn Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Hawthorn Avenue, Kingston Upon Hull.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 11:48.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hawthorn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Avenue, Kingston Upon Hull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 15:21.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hawthorn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Avenue, Kingston Upon Hull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Oct 2024 at 11:47.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hawthorn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Avenue, Kingston Upon Hull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 11:37.

North Lincolnshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Catherine Street

North Lincolnshire Council are proposing to carry out Utility asset works on Catherine Street, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 9 Sep 2024 at 08:04.

North Lincolnshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pasture Road

North Lincolnshire Council are proposing to carry out Utility asset works on Pasture Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 9 Sep 2024 at 08:04.

North Lincolnshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Soutergate

North Lincolnshire Council are proposing to carry out Utility asset works on Soutergate, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 9 Sep 2024 at 07:47.

Hull City Council logo
LONG TERM
Between
9 Dec 2024 and 25 Feb 2025
Details
View Map
Share
Princes Dock Street

Hull City Council were proposing to carry out Highway improvement works on Princes Dock Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 25 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 5 Nov 2024 at 11:53.

Hull City Council logo
LONG TERM
Between
9 Dec 2024 and 25 Feb 2025
Details
View Map
Share
Princes Dock Street

Hull City Council were proposing to carry out Highway improvement works on Princes Dock Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 25 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 23 Oct 2024 at 14:14.

Hull City Council logo
LONG TERM
Between
16 Dec 2024 and 25 Feb 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 25 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hull City Council on 4 Oct 2024 at 15:23.

North Lincolnshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Falkland Way

North Lincolnshire Council are carrying out Utility asset works on Falkland Way, Barton Upon Humber.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 13:15 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 16 Dec 2024 at 15:02.

Hull City Council logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hull City Council on 23 Oct 2024 at 15:20.

Hull City Council logo
LONG TERM
Between
16 Dec 2024 and 25 Feb 2025
Details
View Map
Share
Follow
High Street

Hull City Council are proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 25 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 11 Nov 2024 at 11:29.

Hull City Council logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Hull City Council on 5 Nov 2024 at 09:38.

Hull City Council logo
LONG TERM
Between
16 Dec 2024 and 25 Feb 2025
Details
View Map
Share
Follow
High Street

Hull City Council are proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 25 February 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 15 Nov 2024 at 11:26.

Hull City Council logo
LONG TERM
Between
6 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Princes Dock Street

Hull City Council are proposing to carry out Highway improvement works on Princes Dock Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 15 Nov 2024 at 11:12.

Northern Powergrid (Yorkshire) logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Cottage Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cottage Lane, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Nov 2024 at 08:26.

Northern Powergrid (Yorkshire) logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Cottage Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Cottage Lane, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Oct 2024 at 13:14.

Hull City Council logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 23 Oct 2024 at 16:49.

Hull City Council logo
LONG TERM
Between
20 Jan and 25 Feb 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 25 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 5 Nov 2024 at 09:39.

North Lincolnshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Wootton Road

North Lincolnshire Council are proposing to carry out Utility asset works on Wootton Road, Elsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Lincolnshire Council on 7 Nov 2024 at 10:10.

North Lincolnshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Wootton Road

North Lincolnshire Council are proposing to carry out Utility asset works on Wootton Road, Elsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Lincolnshire Council on 4 Nov 2024 at 15:15.

Hull City Council logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 17 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 23 Oct 2024 at 15:28.

Hull City Council logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
High Street

Hull City Council were proposing to carry out Highway improvement works on High Street, Kingston Upon Hull.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 17 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 5 Nov 2024 at 09:39.

Anglian Water logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Littleworth Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Littleworth Lane, Goxhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 09:56.

Hull City Council logo
LONG TERM
Between
27 Jan and 9 Mar 2025
Details
View Map
Share
Argyle Street

Hull City Council were proposing to carry out Highway repair and maintenance works on Argyle Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 9 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hull City Council on 2 Dec 2024 at 14:25.

Anglian Water logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thornton Curtis Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Thornton Curtis Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 12:53.

Anglian Water logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Barrow Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 08:52.

Telefonica UK logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Anlaby Road

Telefonica UK are proposing to carry out Utility asset works on Anlaby Road, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 27 Nov 2024 at 14:08.

Telefonica UK logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Anlaby Road

Telefonica UK are proposing to carry out Utility asset works on Anlaby Road, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 21 Nov 2024 at 14:49.

Anglian Water logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Thorngarth Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Thorngarth Lane, Barrow Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 08:47.

Anglian Water logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Church Side

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Side, Barrow Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 13:58.

Telefonica UK logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Anlaby Road

Telefonica UK were proposing to carry out Utility asset works on Anlaby Road, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 11 Nov 2024 at 15:17.

Anglian Water logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Church Side

Anglian Water were proposing to carry out Utility repair and maintenance works on Church Side, Barrow Upon Humber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Dec 2024 at 13:40.

Anglian Water logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Church Side

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Side, Barrow Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 09:10.

Anglian Water logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Church Side

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Side, Barrow Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Dec 2024 at 09:33.

Hull City Council logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Boulevard

Hull City Council are proposing to carry out Highway repair and maintenance works on Boulevard, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hull City Council on 4 Oct 2024 at 09:23.

East Riding Of Yorkshire Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Atholl Avenue

East Riding Of Yorkshire Council were proposing to carry out Highway improvement works on Atholl Avenue, Hessle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 17 Dec 2024 at 11:36.

East Riding Of Yorkshire Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Atholl Avenue

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Atholl Avenue, Hessle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 17 Dec 2024 at 11:36.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
St Georges Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Georges Road, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 08:59.

Anglian Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
College Road

Anglian Water are proposing to carry out Utility repair and maintenance works on College Road, Barrow Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 10:26.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Horkstow Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Horkstow Road, Barton Upon Humber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 14:25.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Horkstow Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Horkstow Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:28.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Horkstow Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Horkstow Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 08:58.

Hull City Council logo
LONG TERM
Between
25 Feb and 8 May 2025
Details
View Map
Share
Princes Dock Street

Hull City Council were proposing to carry out Highway improvement works on Princes Dock Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 8 May 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 5 Nov 2024 at 11:53.

Hull City Council logo
LONG TERM
Between
25 Feb and 8 May 2025
Details
View Map
Share
Princes Dock Street

Hull City Council were proposing to carry out Highway improvement works on Princes Dock Street, Kingston Upon Hull.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 8 May 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Hull City Council on 23 Oct 2024 at 16:50.

Hull City Council logo
Between
7 and 11 Mar 2025
Details
View Map
Share
Follow
Brighton Street

Hull City Council are proposing to carry out Highway improvement works on Brighton Street, Kingston Upon Hull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hull City Council on 4 Oct 2024 at 09:26.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
A15 From A1077 To B1206

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From A1077 To B1206, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

Northern Gas Networks logo
LONG TERM
Between
10 Mar and 14 May 2025
Details
View Map
Share
Follow
Anlaby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Anlaby Road, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 13:53.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Ferriby Road

North Lincolnshire Council are proposing to carry out Utility asset works on Ferriby Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
A15 From Humber Bridge To A1077

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From Humber Bridge To A1077, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

Northern Gas Networks logo
LONG TERM
Between
17 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Anlaby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Anlaby Road, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2024 at 16:00.

Northern Gas Networks logo
LONG TERM
Between
17 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Anlaby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Anlaby Road, Kingston Upon Hull.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 09:30.


Roadworks Map near to Simpson Close, BARROW-UPON-HUMBER, DN19 7BL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Simpson Close, BARROW-UPON-HUMBER, DN19 7BL (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
SIMPSON CLOSE 
(0.0 miles)
BT
New service connection - Footway - Some carriageway incursion
In Progress
Since: 17 Dec 2024 10:06
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.0
Details
Share
Follow
2
BT logo
PALMER LANE 
(0.1 miles)
BT
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.1
Details
Share
Follow
3
BT logo
PALMER LANE 
(0.1 miles)
BT
New service connection - Footway - No carriageway incursion
Complete
16 Dec 2024 12:32 - 17 Dec 2024 11:27
0.1
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.