ROADWORKS SUMMARY
Main Street, BARTON-UPON-HUMBER, DN18 6BH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Main Street, DN18 6BH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Main Street, BARTON-UPON-HUMBER, DN18 6BH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Lincolnshire Council logo
LONG TERM
Between
27 Feb 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Falkland Way

North Lincolnshire Council are proposing to carry out Utility asset works on Falkland Way, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2023 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Lincolnshire Council on 23 Dec 2024 at 09:18.

North Lincolnshire Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Bridge Lane

North Lincolnshire Council are carrying out Highway improvement works on Bridge Lane, Horkstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 00:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 13 Nov 2024 at 14:33.

North Lincolnshire Council logo
LONG TERM
Between
8 Nov 2024 and 30 May 2025
Details
View Map
Share
Follow
Bridge Lane

North Lincolnshire Council are proposing to carry out Highway improvement works on Bridge Lane, Horkstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 30 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Lincolnshire Council on 11 Nov 2024 at 14:31.

East Riding Of Yorkshire Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Gibson Lane South

East Riding Of Yorkshire Council are carrying out Highway improvement works on Gibson Lane South, Melton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 09:44 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 22 Jan 2025 at 10:27.

East Riding Of Yorkshire Council logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Gibson Lane Track

East Riding Of Yorkshire Council are proposing to carry out Permanent reinstatement on Gibson Lane Track, Welton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 29 Jan 2025 at 11:51.

East Riding Of Yorkshire Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Wyke Way

East Riding Of Yorkshire Council are carrying out Highway improvement works on Wyke Way, Melton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 00:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 28 Jan 2025 at 10:24.

North Lincolnshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wootton Road

North Lincolnshire Council are carrying out Utility asset works on Wootton Road, Elsham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 10:29 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Lincolnshire Council on 20 Jan 2025 at 10:32.

North Lincolnshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wootton Road

North Lincolnshire Council are proposing to carry out Utility asset works on Wootton Road, Elsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Lincolnshire Council on 4 Nov 2024 at 15:15.

Anglian Water logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thornton Curtis Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Thornton Curtis Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 12:53.

Anglian Water logo
Until
14 Feb 2025
Details
View Map
Share
Follow
Thornton Curtis Road

Anglian Water are carrying out Utility repair and maintenance works on Thornton Curtis Road, Burnham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 02:41 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Jan 2025 at 02:42.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Brickyard Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Brickyard Lane, Melton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jan 2025 at 14:43.

North Lincolnshire Council logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Falkland Way

North Lincolnshire Council are proposing to carry out Utility asset works on Falkland Way, Barton Upon Humber.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 10 Jan 2025 at 09:13.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Brickyard Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Brickyard Lane, Melton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Jan 2025 at 10:27.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Brickyard Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Brickyard Lane, Melton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jan 2025 at 12:22.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Brickyard Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Brickyard Lane, Melton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Jan 2025 at 09:51.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
School Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on School Lane, Appleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 15:00.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
School Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on School Lane, Appleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Jan 2025 at 08:50.

North Lincolnshire Council logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Falkland Way

North Lincolnshire Council are proposing to carry out Utility asset works on Falkland Way, Barton Upon Humber.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 27 Jan 2025 at 13:57.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Horkstow Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Horkstow Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 08:58.

Anglian Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Horkstow Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Horkstow Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:28.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Horkstow Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Horkstow Road, Barton Upon Humber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 14:25.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
A15 From Humber Bridge To A1077

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From Humber Bridge To A1077, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Ferriby Road

North Lincolnshire Council are proposing to carry out Utility asset works on Ferriby Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

North Lincolnshire Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
A15 From A1077 To B1206

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From A1077 To B1206, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 18 Nov 2024 at 11:38.

Northern Powergrid (Yorkshire) logo
Between
14 and 24 Apr 2025
Details
View Map
Share
Follow
Paul Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Paul Lane, Appleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Jan 2025 at 14:19.

Northern Powergrid (Yorkshire) logo
Between
14 and 24 Apr 2025
Details
View Map
Share
Follow
Paul Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Paul Lane, Appleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Jan 2025 at 15:17.

North Lincolnshire Council logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
A15 From Humber Bridge To A1077

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From Humber Bridge To A1077, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 31 Jan 2025 at 13:27.

North Lincolnshire Council logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
Ferriby Road

North Lincolnshire Council are proposing to carry out Utility asset works on Ferriby Road, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 31 Jan 2025 at 09:41.

North Lincolnshire Council logo
Between
22 and 30 Apr 2025
Details
View Map
Share
Follow
A15 From A1077 To B1206

North Lincolnshire Council are proposing to carry out Utility asset works on A15 From A1077 To B1206, Barton Upon Humber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 31 Jan 2025 at 09:41.


Roadworks Map near to Main Street, BARTON-UPON-HUMBER, DN18 6BH (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 2 Feb 2025 02:43
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Main Street, BARTON-UPON-HUMBER, DN18 6BH (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
North Lincolnshire Council logo
MAJOR
  
BRIDGE LANE 
(0.9 miles)
North Lincolnshire Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 8 Nov 2024 - 30 May 2025
0.9
Details
Share
Follow
2
North Lincolnshire Council logo
MAJOR
  
BRIDGE LANE 
(0.9 miles)
North Lincolnshire Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 8 Nov 2024 00:00
(Scheduled: 8 Nov 2024 - 30 May 2025)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.