ROADWORKS SUMMARY
Manor Farm Road, SCUNTHORPE, DN17 1LG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Manor Farm Road, DN17 1LG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Manor Farm Road, SCUNTHORPE, DN17 1LG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Manor Farm Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lincolnshire County Council logo
LONG TERM
Between
27 Aug 2024 and 30 Aug 2027
Details
View Map
Share
Follow
Gainsborough Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Gainsborough Road, Scotter.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 30 August 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lincolnshire County Council on 7 Aug 2024 at 11:30.

Network Rail logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Brumby Wood Lane

Network Rail are carrying out Works for Rail Purposes on Brumby Wood Lane, Scunthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 07:00 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Jul 2025 at 09:06.

Network Rail logo
LONG TERM
Between
23 Jul 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Brumby Wood Lane

Network Rail are proposing to carry out Works for Rail Purposes on Brumby Wood Lane, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 22 Apr 2025 at 14:20.

Severn Trent Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Grange Lane North

Severn Trent Water are carrying out Utility asset works on Grange Lane North, Scunthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 09:00 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2025 at 15:49.

Lincolnshire County Council logo
LONG TERM
Between
11 Aug 2025 and 25 Aug 2028
Details
View Map
Share
Follow
Lindholme

Lincolnshire County Council are proposing to carry out Highway improvement works on Lindholme, Scotter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 25 August 2028. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lincolnshire County Council on 29 May 2025 at 16:22.

Anglian Water logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Northampton Road

Anglian Water are carrying out Utility repair and maintenance works on Northampton Road, Northampton Road Industrial Estate, Scunthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:52 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 2 Oct 2025 at 15:20.

Anglian Water logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Kettering Road

Anglian Water are carrying out Utility repair and maintenance works on Kettering Road, Scunthorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:52 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 2 Oct 2025 at 15:20.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
28 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Glebe Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Glebe Road, Scunthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Sep 2025 at 10:00.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Winterton Road

Northern Powergrid (Yorkshire) are carrying out New service connection on Winterton Road, Scunthorpe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 11:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Sep 2025 at 09:49.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
28 Sep and 23 Nov 2025
Details
View Map
Share
Follow
Winterton Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Winterton Road, Scunthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Sep 2025 at 10:00.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Glebe Road

Northern Powergrid (Yorkshire) are carrying out New service connection on Glebe Road, Scunthorpe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 September 2025 at 11:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Sep 2025 at 09:48.

North Lincolnshire Council logo
Between
1 and 24 Oct 2025
Details
View Map
Share
Follow
Cherry Grove

North Lincolnshire Council are proposing to carry out Utility asset works on Cherry Grove, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 4 Jun 2025 at 14:29.

North Lincolnshire Council logo
Finishing
Today
Details
View Map
Share
Follow
North Moor Lane

North Lincolnshire Council are carrying out Utility asset works on North Moor Lane, Messingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2025 at 07:12 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 6 Oct 2025 at 09:51.

North Lincolnshire Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Normanby Road

North Lincolnshire Council are proposing to carry out Utility asset works on Normanby Road, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 1 Aug 2025 at 08:08.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Bottesford Road

Anglian Water are carrying out Utility repair and maintenance works on Bottesford Road, Scunthorpe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2025 at 08:35 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Oct 2025 at 09:56.

Network Rail logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Dawes Lane

Network Rail are proposing to carry out Works for Rail Purposes on Dawes Lane, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jun 2025 at 08:12.

Northern Powergrid (Yorkshire) logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Scawby Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Scawby Road, Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jul 2025 at 07:46.

Northern Powergrid (Yorkshire) logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Scawby Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Scawby Road, Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Jul 2025 at 08:09.

North Lincolnshire Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Normanby Road

North Lincolnshire Council are proposing to carry out Utility asset works on Normanby Road, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 25 Sep 2025 at 08:50.

Severn Trent Water logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Sorrel Way

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Sorrel Way, Scunthorpe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2025 at 12:48.

Severn Trent Water logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Follow
Sorrel Way

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sorrel Way, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Jul 2025 at 09:30.

Anglian Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Old Crosby

Anglian Water are proposing to carry out Utility repair and maintenance works on Old Crosby, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 17 Jul 2025 at 09:30.

Northern Powergrid (Yorkshire) logo
Between
25 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Mary Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Mary Street, Scunthorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Oct 2025 at 15:31.

Northern Powergrid (Yorkshire) logo
Between
25 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Mary Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Mary Street, Scunthorpe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Oct 2025 at 15:43.

North Lincolnshire Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Access Road To Parkwood Junior And Infants School

North Lincolnshire Council are proposing to carry out Utility asset works on Access Road To Parkwood Junior And Infants School, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Lincolnshire Council on 23 Jun 2025 at 11:06.

Northern Powergrid (Yorkshire) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Percival Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Percival Street, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Sep 2025 at 10:14.

Northern Powergrid (Yorkshire) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Percival Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Percival Street, Scunthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Aug 2025 at 13:40.

Network Rail logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Chapel Lane

Network Rail are proposing to carry out Works for Rail Purposes on Chapel Lane, Keadby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 7 Aug 2025 at 10:59.


Roadworks Map near to Manor Farm Road, SCUNTHORPE, DN17 1LG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 10 Oct 2025 02:44
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Manor Farm Road, SCUNTHORPE, DN17 1LG (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
WILLOUGHBY ROAD 
(0.4 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 9 Oct 2025 09:00
(Scheduled: 9 Oct 2025 - 17 Oct 2025)
0.4
Details
Share
Follow
2
Anglian Water logo
URGENT
  
BONBY GROVE 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Verge - Some carriageway incursion
In Progress
Since: 7 Oct 2025 12:51
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
0.5
Details
Share
Follow
3
BT logo
ALEXANDRA ROAD 
(0.7 miles)
BT
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 8 Oct 2025 19:00
(Scheduled: 8 Oct 2025 - 11 Oct 2025)
0.7
Details
Share
Follow
4
BT logo
LANCASTER ROAD 
(0.8 miles)
BT
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 8 Oct 2025 - 11 Oct 2025
0.8
Details
Share
Follow
5
Northern Powergrid (Yorkshire) logo
URGENT
  
ONTARIO ROAD 
(0.8 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 7 Oct 2025 10:00
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
0.8
Details
Share
Follow
6
BT logo
CROWLAND AVENUE, NORTH LINCOLNSHIRE 
(0.8 miles)
BT
Utility asset works - Footway - Give and take
In Progress
Since: 9 Oct 2025 13:30
(Scheduled: 8 Oct 2025 - 13 Oct 2025)
0.8
Details
Share
Follow
7
Anglian Water logo
URGENT
  
BOTTESFORD ROAD 
(0.9 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 7 Oct 2025 08:35
(Scheduled: 7 Oct 2025 - 13 Oct 2025)
0.9
Details
Share
Follow
8
Severn Trent Water logo
OLD BRUMBY STREET 
(1.0 miles)
Severn Trent Water
Utility asset works - Carriageway - Give and take
Planned
Scheduled: 9 Oct 2025 - 10 Oct 2025
1.0
Details
Share
Follow
9
Anglian Water logo
GLANFORD ROAD 
(1.0 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 9 Oct 2025 - 13 Oct 2025
1.0
Details
Share
Follow
10
BT logo
MERTON ROAD 
(1.0 miles)
BT
New service connection - Footway, Verge - No carriageway incursion
In Progress
Since: 9 Oct 2025 14:59
(Scheduled: 9 Oct 2025 - 13 Oct 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.