ROADWORKS SUMMARY
Station Road, GOOLE, DN14 0QR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Station Road, DN14 0QR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Station Road, GOOLE, DN14 0QR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Station Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Yorkshire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Field Lane

North Yorkshire County Council are carrying out Highway improvement works on Field Lane, Thorpe Willoughby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2025 at 08:00 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Feb 2025 at 16:39.

North Yorkshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Main Road

North Yorkshire County Council are carrying out Highway repair and maintenance works on Main Road, Temple Hirst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:30 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 16:26.

North Yorkshire County Council logo
LONG TERM
Between
14 Feb and 22 May 2025
Details
View Map
Share
Follow
Cobcroft Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Cobcroft Lane, Cridling Stubbs.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 11 Dec 2024 at 10:43.

North Yorkshire County Council logo
LONG TERM
Between
14 Feb and 22 May 2025
Details
View Map
Share
Follow
Whitefield Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Whitefield Lane, Whitley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 11 Dec 2024 at 14:32.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Beech Tree Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:14.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Manor Drive

North Yorkshire County Council are proposing to carry out Highway improvement works on Manor Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 7 Mar 2025 at 12:55.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Manor Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Manor Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:14.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Brigg Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Brigg Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:13.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Pinewood Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Pinewood Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Lingcroft Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Lingcroft Close, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:09.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Mill Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:10.

North Yorkshire County Council logo
Between
1 and 30 Apr 2025
Details
View Map
Share
Follow
Hillam Road

North Yorkshire County Council are proposing to carry out Highway improvement works on Hillam Road, Gateforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 7 Mar 2025 at 11:15.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 28 Nov 2025
Details
View Map
Share
Follow
Stocking Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Stocking Lane, Kellingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 25 Feb 2025 at 13:13.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Stocking Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Stocking Lane, Kellingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:37.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Turvers Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Turvers Lane, Beal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 13:10.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Millfield Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Millfield Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:16.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Underwit Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Underwit Road, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:15.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Camela Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camela Lane, Barlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:15.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Heck Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Heck Lane, Hensall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:38.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Hillam Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Hillam Road, Gateforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:44.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Prospect Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Prospect Close, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:11.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Doncaster Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Doncaster Road, Whitley.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 13:18.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Oaklands Crescent

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oaklands Crescent, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:13.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Oaklands Crescent

North Yorkshire County Council are proposing to carry out Highway improvement works on Oaklands Crescent, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 7 Mar 2025 at 14:53.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
From Brigg Lane To End Of Cul De Sac

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on From Brigg Lane To End Of Cul De Sac, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Croftway

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Croftway, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:11.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Oaklands

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oaklands, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Croft Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Croft Road, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:16.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Camela Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camela Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 12:57.

Quickline Commucations logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Fenwick Common Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Common Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:36.

Quickline Commucations logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Fenwick Common Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Common Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:06.

North Yorkshire County Council logo
Between
3 Apr and 1 May 2025
Details
View Map
Share
Follow
Camela Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Camela Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 7 Mar 2025 at 11:18.

Northern Powergrid (Northeast) logo
Between
4 Apr and 2 May 2025
Details
View Map
Share
Follow
Brigg Lane

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brigg Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Jan 2025 at 16:16.

Northern Powergrid (Northeast) logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Brigg Lane

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brigg Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Feb 2025 at 15:52.

Quickline Commucations logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Fenwick Common Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Common Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:08.

Quickline Commucations logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Fenwick Common Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Common Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:36.

Quickline Commucations logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Fenwick Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:06.

Quickline Commucations logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Fenwick Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 15:07.

Quickline Commucations logo
Between
11 and 15 Apr 2025
Details
View Map
Share
Follow
Fenwick Common Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Common Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 15 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:08.

Quickline Commucations logo
Between
11 and 15 Apr 2025
Details
View Map
Share
Follow
Fenwick Common Lane

Quickline Commucations are proposing to carry out Utility asset works on Fenwick Common Lane, Fenwick, Doncaster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 15 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 17 Jan 2025 at 14:37.

North Yorkshire County Council logo
LONG TERM
Between
1 May and 1 Jul 2025
Details
View Map
Share
Follow
Low Street

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Low Street, Carlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Feb 2025 at 15:11.

North Yorkshire County Council logo
LONG TERM
Between
1 May and 1 Jul 2025
Details
View Map
Share
Follow
Cobcroft Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cobcroft Lane, Cridling Stubbs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Feb 2025 at 14:27.

North Yorkshire County Council logo
LONG TERM
Between
1 May and 1 Jul 2025
Details
View Map
Share
Follow
Weeland Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Weeland Road, Eggborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Feb 2025 at 14:55.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Wood Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wood Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:05.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Saxon Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Saxon Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:55.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Sandway Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Drive, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:27.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Sandway Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:29.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Norman Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Norman Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:52.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Sandway Avenue

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Avenue, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:14.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Stuart Grove

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Stuart Grove, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:50.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Tudor Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Tudor Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:48.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
The Coppice

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Coppice, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:08.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Wood Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:02.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Field Avenue

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Field Avenue, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 10:48.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Acorn Way

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Acorn Way, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 11:57.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Laurel Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Laurel Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 5 Mar 2025 at 12:00.

Northern Gas Networks logo
Between
27 May and 9 Jun 2025
Details
View Map
Share
Follow
Lodge Lane Track

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Lane Track, Gowdall.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the verge only.

This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 16:30.

Quickline Commucations logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Highgate

Quickline Commucations are proposing to carry out Utility asset works on Highgate, Balne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 20 Feb 2025 at 15:08.

Quickline Commucations logo
Between
27 and 30 May 2025
Details
View Map
Share
Highgate

Quickline Commucations were proposing to carry out Utility asset works on Highgate, Balne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 20 Feb 2025 at 15:04.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Beaumont Place

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beaumont Place, Brayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:03.

Quickline Commucations logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Park Lane

Quickline Commucations are proposing to carry out Utility asset works on Park Lane, Balne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 21 Feb 2025 at 14:09.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Mayfield Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mayfield Road, Brayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:11.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Camblesforth Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camblesforth Road, Barlow.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 12:21.

Quickline Commucations logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Lowgate

Quickline Commucations are proposing to carry out Utility asset works on Lowgate, Balne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 21 Feb 2025 at 11:03.


Roadworks Map near to Station Road, GOOLE, DN14 0QR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 8 Mar 2025 13:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Station Road, GOOLE, DN14 0QR (0 Events)