ROADWORKS SUMMARY
Epsom Court, NEWTON AYCLIFFE, DL5 4YG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Epsom Court, DL5 4YG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Epsom Court, NEWTON AYCLIFFE, DL5 4YG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Epsom Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
West Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on West Terrace, Aycliffe Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:22.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A167 (From B6443 Junc To C187 Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From B6443 Junc To C187 Junc), Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 15:16.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
The Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on The Lane, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 10:13.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Butterwick Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Butterwick Road, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:18.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
East End

Durham County Council are proposing to carry out Highway repair and maintenance works on East End, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:38.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
High Street

Durham County Council are proposing to carry out Highway repair and maintenance works on High Street, Aycliffe Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:14.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heighington Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heighington Lane, Newton Aycliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 4 Mar 2025 at 10:22.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heighington Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heighington Lane, School Aycliffe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 13:27.

Northumbrian Water logo
LONG TERM
Between
21 Apr and 22 Sep 2025
Details
View Map
Share
The Leas

Northumbrian Water were proposing to carry out Permanent reinstatement on The Leas, Sedgefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Feb 2025 at 12:52.

Northumbrian Water logo
LONG TERM
Between
30 Apr 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Road Through Westerton

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Road Through Westerton, Westerton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 28 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 3 Apr 2025 at 07:50.

Northern Powergrid (Northeast) logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
A688 (From C96 Junc To Coundongate Roundabout)

Northern Powergrid (Northeast) are carrying out Utility asset works on A688 (From C96 Junc To Coundongate Roundabout), Coundongate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 10:30 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 May 2025 at 13:21.

Durham County Council logo
LONG TERM
Between
19 May and 15 Aug 2025
Details
View Map
Share
Follow
Byerley Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Byerley Road, Shildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 29 Apr 2025 at 08:26.

Durham County Council logo
LONG TERM
Between
19 May and 19 Aug 2025
Details
View Map
Share
Follow
Byerley Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Byerley Road, Shildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 16 May 2025 at 10:11.

Durham County Council logo
LONG TERM
Until
19 Aug 2025
Details
View Map
Share
Follow
Byerley Road

Durham County Council are carrying out Highway repair and maintenance works on Byerley Road, Shildon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 19 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 19 May 2025 at 08:24.

Northern Powergrid (Northeast) logo
Finishing
Monday
Details
View Map
Share
Follow
St Cuthberts Way

Northern Powergrid (Northeast) are proposing to carry out New service connection on St Cuthberts Way, Newton Aycliffe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 22 Apr 2025 at 15:28.

Northern Powergrid (Northeast) logo
Finishing
Monday
Details
View Map
Share
Follow
St Cuthberts Way

Northern Powergrid (Northeast) are carrying out New service connection on St Cuthberts Way, Newton Aycliffe.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:00 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 May 2025 at 09:57.

Northern Gas Networks logo
Thursday
Details
View Map
Share
Byerley Road

Northern Gas Networks carried out Utility repair and maintenance works on Byerley Road, Shildon.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 27 May 2025 and 5 Jun 2025 and were actually completed between 27 May 2025 (11:44) and 3 Jun 2025 (09:57). The works impacted the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 10:00.

Nexfibre Networks Limited logo
Between
29 May and 12 Jun 2025
Details
View Map
Share
Follow
Mellanby Crescent

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mellanby Crescent, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 25 Mar 2025 at 09:06.

Nexfibre Networks Limited logo
Between
29 May and 12 Jun 2025
Details
View Map
Share
Follow
Mellanby Crescent

Nexfibre Networks Limited are proposing to carry out Utility asset works on Mellanby Crescent, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 12 May 2025 at 12:40.

Durham County Council logo
LONG TERM
Between
1 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Winterton Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Winterton Avenue, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 18 Feb 2025 at 09:43.

Northern Powergrid (Northeast) logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Watling Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Watling Road, Bishop Auckland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Apr 2025 at 10:07.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Follow
A177 From C23 Junction To Stonybeck Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on A177 From C23 Junction To Stonybeck Lane, Garmondsway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 08:30.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Moor Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 08:56.

Nexfibre Networks Limited logo
Finishing
Monday
Details
View Map
Share
Follow
Ross Walk

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ross Walk, Newton Aycliffe.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Mar 2025 at 14:21.

Northumbrian Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Road Through Westerton

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Road Through Westerton, Westerton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 29 Apr 2025 at 09:26.

Nexfibre Networks Limited logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Ross Walk

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ross Walk, Newton Aycliffe.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 19 May 2025 at 11:21.

Durham County Council logo
Between
13 and 17 Jun 2025
Details
View Map
Share
Follow
Moor Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Newton Aycliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 May 2025 at 12:58.

Durham County Council logo
Between
15 and 17 Jun 2025
Details
View Map
Share
Follow
A177 From C23 Junction To Stonybeck Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on A177 From C23 Junction To Stonybeck Lane, Garmondsway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 2 Jun 2025 at 08:18.

Northern Powergrid (Northeast) logo
Between
20 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Watling Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Watling Road, Bishop Auckland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Apr 2025 at 10:09.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
C37 (From Wood Lane Junc To Duncombe Bank)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on C37 (From Wood Lane Junc To Duncombe Bank), Ferryhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 10:31.

Durham County Council logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Owen Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Owen Street, Ferryhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 30 May 2025 at 10:52.

Durham County Council logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Owen Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Owen Street, Ferryhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 2 Jun 2025 at 12:05.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Cleves Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleves Court, Ferryhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 08:21.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Cleves Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleves Court, Ferryhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 10:32.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Wood Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wood Lane, Ferryhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 08:20.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Wood Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wood Lane, Ferryhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 09:16.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
C37 (From Wood Lane Junc To Duncombe Bank)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on C37 (From Wood Lane Junc To Duncombe Bank), Ferryhill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 15:03.

Northumbrian Water logo
LONG TERM
Between
23 Jul 2025 and 28 Jan 2026
Details
View Map
Share
Follow
Road Through Westerton

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Road Through Westerton, Westerton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Apr 2025 at 09:28.

Northumbrian Water logo
LONG TERM
Between
23 Jul and 19 Dec 2025
Details
View Map
Share
Follow
The Leas

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Leas, Sedgefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 30 May 2025 at 12:55.

G2 Energy IDNO logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
A167 (From Thinford Roundabout To C36/chilton Bypass Roundabout)

G2 Energy IDNO are proposing to carry out New service connection on A167 (From Thinford Roundabout To C36/chilton Bypass Roundabout), Ferryhill.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by G2 Energy IDNO on 30 Apr 2025 at 14:11.

Northern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Helena Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Helena Terrace, Bishop Auckland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:22.

Northern Gas Networks logo
Between
18 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Vart Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vart Road, Bishop Auckland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:19.


Roadworks Map near to Epsom Court, NEWTON AYCLIFFE, DL5 4YG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Epsom Court, NEWTON AYCLIFFE, DL5 4YG (13 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Northeast) logo
MAJOR
  
LOW GREEN 
(0.3 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 28 Apr 2025 09:00
(Scheduled: 28 Apr 2025 - 13 Jun 2025)
0.3
Details
Share
Follow
2
Northumbrian Water logo
MAJOR
  
ARMSTRONG CLOSE 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 20 May 2025 13:50
(Scheduled: 19 May 2025 - 9 Jun 2025)
0.7
Details
Share
Follow
3
Nexfibre Networks Limited logo
MAJOR
  
ALDFRID PLACE 
(0.7 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 29 May 2025 - 9 Jul 2025)
0.7
Details
Share
4
Nexfibre Networks Limited logo
VANE ROAD 
(0.8 miles)
Nexfibre Networks Limited
Remedial works - Carriageway - Give and take
In Progress
Since: 31 May 2025 09:00
(Scheduled: 27 May 2025 - 5 Jun 2025)
0.8
Details
Share
Follow
5
Nexfibre Networks Limited logo
MAJOR
  
MALING GREEN 
(0.8 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Verge, Footpath - Give and take
Planned
Scheduled: 29 May 2025 - 3 Jun 2025
0.8
Details
Share
Follow
6
Nexfibre Networks Limited logo
MAJOR
  
MALING GREEN 
(0.8 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Verge, Footpath - Give and take
In Progress
Since: 29 May 2025 09:00
(Scheduled: 29 May 2025 - 3 Jun 2025)
0.8
Details
Share
Follow
7
Nexfibre Networks Limited logo
MAJOR
  
MELLANBY CRESCENT 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 29 May 2025 - 12 Jun 2025
0.9
Details
Share
Follow
8
Nexfibre Networks Limited logo
MAJOR
  
MELLANBY CRESCENT 
(0.9 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway, Verge, Footpath - Road closure
Planned
Scheduled: 29 May 2025 - 12 Jun 2025
0.9
Details
Share
Follow
9
Virgin Media logo
FAULKNER ROAD 
(0.9 miles)
Virgin Media
Utility asset works - Carriageway, Footpath - Some carriageway incursion
Cancelled
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.9
Details
Share
10
Northern Gas Networks logo
MAJOR
  
HEDLEY CLOSE 
(1.0 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge, Footpath - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 27 Jun 2025
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.