ROADWORKS SUMMARY
Barton, RICHMOND, DL10 6HR
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for DL10 6HR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Barton, RICHMOND, DL10 6HR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Jun 2024 and 30 Mar 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wells Lane, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 15 Apr 2024 at 09:04.
30 Jun 2024 and 30 Mar 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 15 Apr 2024 at 09:02.
30 Jun 2024 and 30 Mar 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Marygate, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 15 Apr 2024 at 09:04.
30 Jun 2024 and 30 Mar 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Barton To Barton Interchange Roundabout, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 30 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 15 Apr 2024 at 09:03.
3 Mar 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Elton Parade, Darlington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 08:00 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 09:08.
27 Jan and 19 Dec 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Barracks Bank, Scotch Corner.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 11:18.
27 Jan and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hummersknott Avenue, Darlington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 6 Jan 2025 at 15:49.
27 Jan and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hummersknott Avenue, Darlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 15:29.
28 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Cleveland Terrace, Darlington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 15:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Jan 2025 at 15:55.
5 Feb and 12 Apr 2025
National Highways are proposing to carry out Works for road purposes on Grange Road, Blackwell, Darlington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Feb 2025 at 13:51.
12 Apr 2025
National Highways are carrying out Works for road purposes on Grange Road, Blackwell, Darlington.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2025 at 20:00 and could run through until 12 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Feb 2025 at 08:33.
10 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cleveland Terrace, Darlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:09.
10 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Elton Road, Darlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:06.
10 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Elton Parade, Darlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2024 at 11:10.
6 Mar 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Elton Road, Darlington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 February 2025 at 13:00 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 08:52.
Friday
Northern Powergrid (Northeast) were proposing to carry out New service connection on Strawgate Lane, Stapleton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Feb 2025 at 10:35.
22 and 24 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Parkside, Darlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Nov 2024 at 12:10.
22 and 24 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Parkside, Darlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Jan 2025 at 12:28.
24 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carmel Road North, Darlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 12:25.
24 and 28 Feb 2025
Darlington Borough Council are proposing to carry out Highway repair and maintenance works on Edinburgh Drive, Darlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Darlington Borough Council on 30 Jan 2025 at 14:25.
24 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carmel Road North, Darlington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 31 Dec 2024 at 10:45.
3 Mar and 11 Apr 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 8 Nov 2024 at 11:14.
17 and 23 Mar 2025
Darlington Borough Council are proposing to carry out Highway repair and maintenance works on Roundhill Road, Hurworth Moor, Darlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Darlington Borough Council on 30 Jan 2025 at 12:03.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Back Lane, Moulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 29 Jan 2025 at 08:14.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Stapleton Village Streets, Stapleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:50.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Cleasby Road, Stapleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:57.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Barton To Hangbank Cottage, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:42.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Darlington Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:29.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Back Lane, North Cowton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 29 Jan 2025 at 08:22.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Moulton Lane, Dalton Gates.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 30 Jan 2025 at 13:40.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Kneeton Lane, Middleton Tyas.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:32.
1 Apr and 31 Oct 2025
North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on Five Hills Lane, Middleton Tyas.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Jan 2025 at 16:00.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Richmond Road, Middleton Tyas.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 29 Jan 2025 at 08:04.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Barton To Barton Interchange Roundabout, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:33.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Marygate, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:44.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Stapleton To Blackwell Bridge Roundabout, Stapleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:48.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on The Green, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:43.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Barton To Watherne Road, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 29 Jan 2025 at 08:27.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Stapleton To Barton Road, Stapleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 7 Feb 2025 at 10:53.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Strawgate Lane, Stapleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 29 Jan 2025 at 08:22.
8 Apr and 7 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Church Lane, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Feb 2025 at 09:52.
21 Apr and 4 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Green, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 14 Feb 2025 at 13:54.
13 and 19 May 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Strawgate Lane, Stapleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 19 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Feb 2025 at 10:36.
Roadworks Map near to Barton, RICHMOND, DL10 6HR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Barton, RICHMOND, DL10 6HR (3 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.