ROADWORKS SUMMARY
Mount Pleasant, DURHAM, DH7 6AS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mount Pleasant, DH7 6AS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mount Pleasant, DURHAM, DH7 6AS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mount Pleasant are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
South Bailey

Durham County Council are carrying out Highway repair and maintenance works on South Bailey, Durham City.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 08:00 and could run through until 16 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 10:47.

Durham County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
North Road

Durham County Council are carrying out Highway repair and maintenance works on North Road, Durham City.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2024 at 08:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 13 Jan 2025 at 11:21.

Durham County Council logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
North Bailey

Durham County Council are carrying out Highway repair and maintenance works on North Bailey, Durham City.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2024 at 08:30 and could run through until 16 March 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 10:47.

Northumbrian Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Road Through Belmont Industrial Estate

Northumbrian Water are carrying out Utility repair and maintenance works on Road Through Belmont Industrial Estate, Belmont.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 19:00 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 14 Feb 2025 at 11:13.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Stanley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2024 at 15:32.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2024 at 13:46.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 12:14.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 12:15.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Croft Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Croft Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:56.

Northumbrian Water logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Croft Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Croft Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 09:15 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 21 Jan 2025 at 11:04.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Langley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Langley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 11:29.

Northumbrian Water logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Langley Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Langley Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 January 2025 at 09:15 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 21 Jan 2025 at 11:04.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Side), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Side)

Northumbrian Water are carrying out Utility repair and maintenance works on Coronation Terrace (Side), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 13:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Jan 2025 at 14:48.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Unity Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Unity Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Unity Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Unity Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 13:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Jan 2025 at 14:48.

Durham County Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crossgate

Durham County Council are proposing to carry out Highway repair and maintenance works on Crossgate, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 14:10.

Durham County Council logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Crossgate

Durham County Council are carrying out Highway repair and maintenance works on Crossgate, Durham City.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 27 Jan 2025 at 08:43.

Durham County Council logo
Finishing
Friday
Details
View Map
Share
Follow
South Crescent

Durham County Council are carrying out Highway repair and maintenance works on South Crescent, Durham City.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 11 Feb 2025 at 16:15.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Hawthorn Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hawthorn Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:58.

Northumbrian Water logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Hawthorn Terrace (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Hawthorn Terrace (Back), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 12:50 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 Jan 2025 at 14:39.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sycamore Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sycamore Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:58.

Northumbrian Water logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Sycamore Terrace (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Sycamore Terrace (Back), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 12:50 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 27 Jan 2025 at 14:44.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sabin Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sabin Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:39.

Northumbrian Water logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Sabin Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Sabin Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 09:00 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 28 Jan 2025 at 09:07.

Northern Gas Networks logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 08:00 and could run through until 14 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 07:57.

Durham County Council logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Oakridge Road

Durham County Council are carrying out Highway repair and maintenance works on Oakridge Road, Ushaw Moor.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:02 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 3 Feb 2025 at 11:01.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Prospect Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Prospect Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:59.

Northumbrian Water logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Prospect Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Prospect Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 15:15 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 Feb 2025 at 15:15.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Catherine Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Catherine Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:59.

Northumbrian Water logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Catherine Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Catherine Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 15:15 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 7 Feb 2025 at 15:15.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Coronation Terrace (Back), New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 15:05 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 3 Feb 2025 at 16:01.

Northern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pelton Fell Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Pelton Fell Road, Chester-le-street.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2025 at 16:52 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Feb 2025 at 16:04.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Dudley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dudley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:40.

Northumbrian Water logo
LONG TERM
Until
10 Apr 2025
Details
View Map
Share
Follow
Dudley Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Dudley Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 10:30 and could run through until 10 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Feb 2025 at 11:16.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Jubilee Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Jubilee Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:40.

Northumbrian Water logo
LONG TERM
Until
10 Apr 2025
Details
View Map
Share
Follow
Jubilee Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on Jubilee Terrace, New Kyo.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 10:30 and could run through until 10 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 14 Feb 2025 at 11:16.

National Highways logo
LONG TERM
Between
14 Feb and 30 Jul 2025
Details
View Map
Share
Follow
Lumley New Road

National Highways are proposing to carry out Diversionary works on Lumley New Road, Castle Dene.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Dec 2024 at 15:32.

Northumbrian Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Blue House Bank

Northumbrian Water are carrying out Utility repair and maintenance works on Blue House Bank, Chester-le-street.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2025 at 15:30 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Feb 2025 at 08:14.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hill Top

Northumbrian Water are carrying out Utility repair and maintenance works on Hill Top, Stanley.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 February 2025 at 08:45 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Feb 2025 at 09:20.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Laverick Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Laverick Terrace (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:10.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
New Durham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Durham Road, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:12.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Durham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Durham Road, Annfield Plain.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:12.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
New Durham Road (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Durham Road (Side), Annfield Plain.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:13.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
William Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on William Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:50.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Welsh Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Welsh Terrace, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:51.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Mary Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mary Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:48.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Thomas Street (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Thomas Street (Side), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:49.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Elizabeth Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Elizabeth Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:49.

Durham County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Park Road North

Durham County Council are proposing to carry out Highway repair and maintenance works on Park Road North, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:52.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Broom Crescent

Durham County Council were proposing to carry out Highway repair and maintenance works on Broom Crescent, Ushaw Moor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 10:29.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Broom Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on Broom Crescent, Ushaw Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 15:42.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Ash Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Ash Avenue, Ushaw Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:30.

Durham County Council logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
South Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on South Crescent, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 13:16.

Durham County Council logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
North Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on North Crescent, Aykley Heads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 13:18.

Durham County Council logo
Between
1 and 3 Mar 2025
Details
View Map
Share
Follow
North Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on North Crescent, Aykley Heads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 14:07.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Oak Street (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Oak Street (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 10:20.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Gill Crescent South (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Gill Crescent South (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 08:53.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
School Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on School Terrace, Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:11.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Sandgate

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandgate, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:13.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Eden Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Eden Terrace, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:13.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Palmer Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Palmer Street (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:11.

Northumbrian Water logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Stanley Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:12.

Durham County Council logo
Between
13 and 22 Mar 2025
Details
View Map
Share
Follow
Finchale Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Finchale Road, Framwellgate Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 7 Nov 2024 at 08:48.

Network Rail logo
Between
15 and 17 Mar 2025
Details
View Map
Share
Waldridge Road

Network Rail were proposing to carry out Works for Rail Purposes on Waldridge Road, Chester-le-street.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Dec 2024 at 12:11.

Northumbrian Water logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
King Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on King Terrace (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:10.

Northumbrian Water logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
Rose Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rose Avenue (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:11.

Durham County Council logo
Between
23 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Millburngate

Durham County Council are proposing to carry out Highway repair and maintenance works on Millburngate, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 Dec 2024 at 09:18.

Northumbrian Water logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Lees Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Lees Street (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:02.

Northumbrian Water logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
Mona Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mona Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:05.

Northumbrian Water logo
LONG TERM
Between
24 Mar and 16 May 2025
Details
View Map
Share
Follow
High Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on High Street, Stanley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:08.

Durham County Council logo
Between
30 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Crossgate

Durham County Council are proposing to carry out Highway repair and maintenance works on Crossgate, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 2 Jan 2025 at 13:50.

Durham County Council logo
Between
30 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Crossgate

Durham County Council are proposing to carry out Highway repair and maintenance works on Crossgate, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 10:00.

Durham County Council logo
Between
30 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Allergate

Durham County Council are proposing to carry out Highway repair and maintenance works on Allergate, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 09:59.

Durham County Council logo
Between
30 Mar and 6 Apr 2025
Details
View Map
Share
Follow
North Road

Durham County Council are proposing to carry out Highway repair and maintenance works on North Road, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 2 Jan 2025 at 13:51.

Durham County Council logo
Between
30 Mar and 13 Apr 2025
Details
View Map
Share
Follow
North Road

Durham County Council are proposing to carry out Highway repair and maintenance works on North Road, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 10:01.

Northumbrian Water logo
LONG TERM
Between
31 Mar and 23 May 2025
Details
View Map
Share
Follow
Beaconsfield Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Beaconsfield Street (Back), Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Jan 2025 at 11:00.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Pringle Grove

Durham County Council are proposing to carry out Highway repair and maintenance works on Pringle Grove, New Brancepeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 14 Jan 2025 at 09:13.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Doric Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Doric Road, New Brancepeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 15 Jan 2025 at 10:02.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Pringle Place

Durham County Council are proposing to carry out Highway repair and maintenance works on Pringle Place, New Brancepeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Jan 2025 at 09:06.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Durham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Durham Road, Esh Winning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:31.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Fair View

Durham County Council are proposing to carry out Highway repair and maintenance works on Fair View, Esh Winning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:51.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:16.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Potterhouse Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Potterhouse Terrace, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:21.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Abbey Road, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:09.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Abbey Road, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:12.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Durham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Durham Road, Lanchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 08:43.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct), Chester Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 7 Jan 2025 at 15:10.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Clarence Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Clarence Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:30.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Osborne Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Osborne Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:23.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Southfields

Durham County Council are proposing to carry out Highway repair and maintenance works on Southfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 11:03.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Charles Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Charles Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 11:10.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Road Adjacent To Fire Station

Durham County Council are proposing to carry out Highway repair and maintenance works on Road Adjacent To Fire Station, High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:19.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Greens Bank

Durham County Council are proposing to carry out Highway repair and maintenance works on Greens Bank, West Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:06.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout)

Durham County Council are proposing to carry out Highway repair and maintenance works on A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout), Chester-le-street.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:31.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
C4 (From A693 To County Boundary At Urpeth Forge)

Durham County Council are proposing to carry out Highway repair and maintenance works on C4 (From A693 To County Boundary At Urpeth Forge), High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 15:19.

Northumbrian Water logo
LONG TERM
Between
7 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Eastfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Eastfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northumbrian Water on 16 Jan 2025 at 13:34.

Northumbrian Water logo
LONG TERM
Between
7 Apr and 5 Jun 2025
Details
View Map
Share
Follow
Westfields

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Westfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northumbrian Water on 16 Jan 2025 at 14:55.

Northern Gas Networks logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Durham City Footpath 88

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham City Footpath 88, Durham City.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 31 Jan 2025 at 16:31.

Northern Gas Networks logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Durham City Footpath 88

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham City Footpath 88, Durham City.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 11:49.

Northern Gas Networks logo
LONG TERM
Between
14 Apr and 16 May 2025
Details
View Map
Share
Follow
Sherburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherburn Road, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Jan 2025 at 16:23.

Durham County Council logo
LONG TERM
Between
14 Apr and 31 May 2025
Details
View Map
Share
Dryburn Road

Durham County Council were proposing to carry out Highway repair and maintenance works on Dryburn Road, Framwellgate Moor.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 31 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 7 Jan 2025 at 09:25.

Durham County Council logo
LONG TERM
Between
14 Apr and 31 May 2025
Details
View Map
Share
Follow
Dryburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dryburn Road, Framwellgate Moor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 10 Jan 2025 at 09:20.

Durham County Council logo
LONG TERM
Between
14 Apr and 31 May 2025
Details
View Map
Share
Follow
Dryburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dryburn Road, Framwellgate Moor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 13 Jan 2025 at 15:06.

Northern Gas Networks logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
Edge Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edge Court, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 31 Jan 2025 at 16:24.

Northern Gas Networks logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
Edge Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edge Court, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 16:08.

Northumbrian Water logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Plantation View

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Plantation View, West Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jan 2025 at 07:49.


Roadworks Map near to Mount Pleasant, DURHAM, DH7 6AS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mount Pleasant, DURHAM, DH7 6AS (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
PLAWSWORTH ROAD 
(0.6 miles)
Durham County Council
Highway improvement works - Footway, Carriageway - Stop/go boards
Planned
Scheduled: 17 Feb 2025
0.6
Details
Share
Follow
2
Durham County Council logo
PLAWSWORTH ROAD 
(0.6 miles)
Durham County Council
Highway improvement works - Footway, Carriageway - Stop/go boards
Cancelled
(Scheduled: 17 Feb 2025)
0.6
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.