ROADWORKS SUMMARY
Greenwood Avenue, DURHAM, DH7 0AN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Greenwood Avenue, DH7 0AN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Greenwood Avenue, DURHAM, DH7 0AN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Greenwood Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northumbrian Water logo
LONG TERM
Between
11 Dec 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Railway Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 15:24.

Northumbrian Water logo
LONG TERM
Between
11 Dec 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Railway Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 15:21.

Durham County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bradley Workshops

Durham County Council are proposing to carry out Highway repair and maintenance works on Bradley Workshops, Leadgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 10 Dec 2024 at 14:34.

Durham County Council logo
Wednesday
Details
View Map
Share
Bradley Workshops

Durham County Council carried out Highway repair and maintenance works on Bradley Workshops, Leadgate.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 18 Dec 2024 and 8 Jan 2025 and were actually completed between 18 Dec 2024 (08:00) and 6 Jan 2025 (14:00). The works impacted the carriageway only.

This roadwork event was last updated by Durham County Council on 6 Jan 2025 at 14:51.

Northern Powergrid (Northeast) logo
Finishing
Friday
Details
View Map
Share
Follow
Pelton Lane

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Pelton Lane, Pelton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 December 2024 at 17:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jan 2025 at 15:30.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Stanley Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2024 at 15:32.

Northern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2024 at 13:46.

Northumbrian Water logo
Until
31 Jan 2025
Details
View Map
Share
Follow
Northgate

Northumbrian Water are carrying out Utility repair and maintenance works on Northgate, Annfield Plain.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 6 Jan 2025 at 08:23.

Northumbrian Water logo
Until
31 Jan 2025
Details
View Map
Share
Follow
Northgate (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Northgate (Back), Annfield Plain.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 6 Jan 2025 at 08:24.

Nexfibre Networks Limited logo
Finishing
Wednesday
Details
View Map
Share
Follow
Shafto Terrace

Nexfibre Networks Limited are proposing to carry out Permanent reinstatement on Shafto Terrace, Craghead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Oct 2024 at 08:41.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 13:14.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 12:14.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 13:13.

Durham County Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
North Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on North Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 12 Dec 2024 at 08:22.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
North Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Oct 2024 at 10:12.

Northumbrian Water logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Railway Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Railway Street (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Nov 2024 at 12:15.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Croft Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Croft Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:18.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Croft Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Croft Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:56.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Langley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Langley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 11:29.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Side), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:02.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Side), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Unity Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Unity Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Unity Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Unity Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 09:02.

Northumbrian Water logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Langley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Langley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 09:01.

Durham County Council logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Anthony Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Anthony Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 4 Dec 2024 at 15:53.

Durham County Council logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Anthony Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Anthony Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Nov 2024 at 10:38.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sabin Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sabin Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:45.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sabin Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sabin Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:39.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sycamore Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sycamore Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:07.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Sycamore Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sycamore Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:58.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Hawthorn Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hawthorn Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:58.

Northumbrian Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Hawthorn Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hawthorn Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:21.

Northern Gas Networks logo
LONG TERM
Between
29 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Road, Stanley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 14 March 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Dec 2024 at 13:55.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Prospect Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Prospect Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:42.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:08.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Catherine Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Catherine Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 08:22.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Coronation Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Coronation Terrace (Back), New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:57.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Catherine Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Catherine Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:59.

Northumbrian Water logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Prospect Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Prospect Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 14:59.

Durham County Council logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Oakridge Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Oakridge Road, Ushaw Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 26 Nov 2024 at 13:25.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Dudley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dudley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:40.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Dudley Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dudley Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 13:27.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Jubilee Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Jubilee Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 16 Dec 2024 at 08:24.

Northumbrian Water logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Jubilee Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Jubilee Terrace, New Kyo.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 15:40.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Durham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Durham Road, Annfield Plain.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:12.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Laverick Terrace (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Laverick Terrace (Back), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:10.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
New Durham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Durham Road, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:12.

Northumbrian Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
New Durham Road (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on New Durham Road (Side), Annfield Plain.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 11:13.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
William Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on William Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:50.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Welsh Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Welsh Terrace, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:51.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Mary Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mary Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:48.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Thomas Street (Side)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Thomas Street (Side), Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:49.

Northumbrian Water logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Elizabeth Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Elizabeth Street, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 12 Dec 2024 at 14:49.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Ash Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Ash Avenue, Ushaw Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:30.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Follow
Broom Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on Broom Crescent, Ushaw Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 15:42.

Durham County Council logo
Between
1 and 31 Mar 2025
Details
View Map
Share
Broom Crescent

Durham County Council were proposing to carry out Highway repair and maintenance works on Broom Crescent, Ushaw Moor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 10:29.

Durham County Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Oakwood

Durham County Council are proposing to carry out Highway repair and maintenance works on Oakwood, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:57.

Durham County Council logo
LONG TERM
Between
17 Mar and 30 Apr 2025
Details
View Map
Share
Follow
Castledene Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Castledene Road, Delves Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Dec 2024 at 09:39.

Durham County Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Fines Park

Durham County Council are proposing to carry out Highway repair and maintenance works on Fines Park, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 13:00.

Durham County Council logo
Between
18 and 29 Mar 2025
Details
View Map
Share
Follow
Oakwood Court

Durham County Council are proposing to carry out Highway repair and maintenance works on Oakwood Court, Annfield Plain.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:57.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Pringle Grove

Durham County Council are proposing to carry out Highway repair and maintenance works on Pringle Grove, New Brancepeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Dec 2024 at 08:30.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout)

Durham County Council are proposing to carry out Highway repair and maintenance works on A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout), Chester-le-street.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 11:17.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Greens Bank

Durham County Council are proposing to carry out Highway repair and maintenance works on Greens Bank, West Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 11:31.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Road Adjacent To Fire Station

Durham County Council are proposing to carry out Highway repair and maintenance works on Road Adjacent To Fire Station, High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 11:36.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
C4 (From A693 To County Boundary At Urpeth Forge)

Durham County Council are proposing to carry out Highway repair and maintenance works on C4 (From A693 To County Boundary At Urpeth Forge), High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Dec 2024 at 11:43.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Charles Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Charles Street, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Dec 2024 at 15:09.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Southfields

Durham County Council are proposing to carry out Highway repair and maintenance works on Southfields, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Dec 2024 at 15:15.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Durham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Durham Road, Lanchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Dec 2024 at 10:18.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Potterhouse Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Potterhouse Terrace, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 30 Dec 2024 at 13:56.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 30 Dec 2024 at 14:04.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Fair View

Durham County Council are proposing to carry out Highway repair and maintenance works on Fair View, Esh Winning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Dec 2024 at 14:38.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Durham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Durham Road, Esh Winning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Dec 2024 at 14:34.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Pringle Place

Durham County Council are proposing to carry out Highway repair and maintenance works on Pringle Place, New Brancepeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Dec 2024 at 08:26.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Doric Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Doric Road, New Brancepeth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Dec 2024 at 08:18.


Roadworks Map near to Greenwood Avenue, DURHAM, DH7 0AN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Jan 2025 23:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Greenwood Avenue, DURHAM, DH7 0AN (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Northeast) logo
URGENT
  
GREENWOOD AVENUE 
(0.1 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 5 Jan 2025 17:50
(Scheduled: 5 Jan 2025 - 10 Jan 2025)
0.1
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.