ROADWORKS SUMMARY
Elemore Lane, HOUGHTON LE SPRING, DH5 0QB
Introduction
View current and future planned roadworks and road closures for Elemore Lane, DH5 0QB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Elemore Lane, HOUGHTON LE SPRING, DH5 0QB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Elemore Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Aug 2023 and 31 Jan 2025
Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 12:47.
21 Aug 2023 and 30 Jun 2025
Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2023 and could run through until 30 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 19 Dec 2024 at 14:59.
21 Aug 2023 and 31 Jan 2025
Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 12:45.
21 Aug 2023 and 30 Jun 2025
Durham County Council are proposing to carry out Highway improvement works on B1285 (From East Moor Road Junc To A19), Murton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2023 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 19 Dec 2024 at 14:59.
21 Aug 2023 and 31 Jan 2025
Durham County Council are proposing to carry out Highway improvement works on B1285 (From East Moor Road Junc To A19), Murton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 12:48.
6 Sep 2023 and 31 Jan 2025
Durham County Council are proposing to carry out Highway improvement works on Spring Road, Murton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Durham County Council on 23 Aug 2023 at 12:59.
31 Jan 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Moor Crescent, Ludworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 13:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 14:44.
31 Jan 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Church View, Ludworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 13:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 14:44.
31 Jan 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Road Through Belmont Industrial Estate, Belmont.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 19:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 7 Jan 2025 at 14:39.
28 Feb 2025
Northumbrian Water are carrying out Utility repair and maintenance works on Barnard Avenue, Ludworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:45 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 13 Dec 2024 at 14:37.
Wednesday
Northern Gas Networks are carrying out Utility repair and maintenance works on Thorpe Road, Easington Village.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 January 2025 at 15:00 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 13 Jan 2025 at 14:53.
Friday
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ascot Street (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 6 Jan 2025 at 08:12.
Friday
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Maria Street, Silksworth, Sunderland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 31 Dec 2024 at 06:03.
Friday
Sunderland City Council are proposing to carry out Highway repair and maintenance works on Grasmere Avenue, Easington Lane, Houghton-le-spring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sunderland City Council on 14 Jan 2025 at 06:02.
Friday
Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 28 Oct 2024 at 13:36.
Friday
Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 16 Dec 2024 at 11:20.
Friday
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Maria Street, Silksworth, Sunderland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 11:52.
Friday
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Ascot Street (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 29 Nov 2024 at 15:06.
Friday
National Highways are proposing to carry out Works for road purposes on A690 (From Gilesgate Roundabout To Junc 62 Carrville Interchange), Gilesgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Jan 2025 at 14:55.
Friday
Sunderland City Council are proposing to carry out Highway repair and maintenance works on Grasmere Avenue, Easington Lane, Houghton-le-spring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sunderland City Council on 10 Jan 2025 at 12:26.
27 and 31 Jan 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Ropery Walk (Side), Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 11:16.
14 Feb and 30 Jul 2025
National Highways are proposing to carry out Diversionary works on Lumley New Road, Castle Dene.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Dec 2024 at 15:32.
23 Feb and 2 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mill Hill Road, Silksworth, Sunderland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northumbrian Water on 14 Jan 2025 at 13:39.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on School Terrace, Fence Houses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:11.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Queensbury Road, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 10:16.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Portland Avenue, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 11:27.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Colling Avenue, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 11:12.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Office Street, Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 10:37.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Oak Street (Side), Fence Houses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 10:20.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Bede Street, Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 10:20.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Gill Crescent South (Side), Fence Houses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 08:53.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Corbett Street (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 10:22.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Cardiff Street (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 5 Nov 2024 at 15:10.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Charles Street (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 11:02.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Ascot Street (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 11:13.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Seaside Lane (Back), Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 08:52.
1 and 31 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Road Between Office Street And Cross Street, Easington Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 11:02.
4 and 7 Mar 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dene Crescent, Shotton Colliery.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 10 Dec 2024 at 11:42.
17 and 28 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Queen Street, Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:49.
17 and 28 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Clarke Terrace, Murton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:51.
17 and 28 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Toft Crescent, Murton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:51.
18 and 29 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Princess Road (Back), Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:50.
18 and 29 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Ash Terrace, Murton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:53.
19 and 30 Mar 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Queen Street (Back), Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 22 Oct 2024 at 12:50.
1 Apr and 30 Jun 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Swan Road, Peterlee.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 10:06.
1 Apr and 30 Jun 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Hunter Road, Peterlee.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 10:59.
1 Apr and 30 Jun 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Dunelm Road, Thornley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 8 Jan 2025 at 11:45.
14 and 25 Apr 2025
Durham County Council are proposing to carry out Highway repair and maintenance works on Ropery Walk (Side), Seaham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Durham County Council on 13 Jan 2025 at 08:50.
Roadworks Map near to Elemore Lane, HOUGHTON LE SPRING, DH5 0QB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Elemore Lane, HOUGHTON LE SPRING, DH5 0QB (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Jan 2025 - 30 Jan 2025)
(Scheduled: 6 Jan 2025 - 20 Jan 2025)
(Scheduled: 15 Jan 2025 - 21 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.