ROADWORKS SUMMARY
Tantallon Court, HOUGHTON LE SPRING, DH4 6TJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tantallon Court, DH4 6TJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tantallon Court, HOUGHTON LE SPRING, DH4 6TJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tantallon Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Between
14 Feb and 30 Jul 2025
Details
View Map
Share
Lumley New Road

National Highways were proposing to carry out Diversionary works on Lumley New Road, Castle Dene.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Feb 2025 at 12:57.

LONG TERM
Between
17 Feb and 4 Jul 2025
Details
View Map
Share
Follow
The Quay

Sunderland City Council are proposing to carry out Highway improvement works on The Quay, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 6 Feb 2025 at 09:58.

LONG TERM
Until
5 Sep 2025
Details
View Map
Share
Follow
The Quay

Sunderland City Council are carrying out Highway improvement works on The Quay, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Mar 2025 at 12:53.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:16.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Potterhouse Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Potterhouse Terrace, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:21.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Abbey Road, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:09.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Abbey Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Abbey Road, Pity Me.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 12:12.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct), Chester Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 7 Jan 2025 at 15:10.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Clarence Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Clarence Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:30.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Osborne Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Osborne Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2025 at 09:23.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout)

Durham County Council are proposing to carry out Highway repair and maintenance works on A693 (From C128 No Place Roundabout To A183/a6127/b6290 Northlands Roundabout), Chester-le-street.

These works are categorised as Major.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 13:31.

Durham County Council logo
LONG TERM
Between
1 Apr and 30 Jun 2025
Details
View Map
Share
Follow
C4 (From A693 To County Boundary At Urpeth Forge)

Durham County Council are proposing to carry out Highway repair and maintenance works on C4 (From A693 To County Boundary At Urpeth Forge), High Handenhold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jan 2025 at 15:19.

LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Wear Street

Sunderland City Council are carrying out Highway improvement works on Wear Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 29 Apr 2025 at 09:39.

LONG TERM
Between
28 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Wear Street

Sunderland City Council are proposing to carry out Highway improvement works on Wear Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 16 Apr 2025 at 13:57.

LONG TERM
Between
9 May and 29 Jul 2025
Details
View Map
Share
Follow
Springwell Terrace North Back

Sunderland City Council are proposing to carry out Highway improvement works on Springwell Terrace North Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 30 Apr 2025 at 14:24.

LONG TERM
Until
29 Jul 2025
Details
View Map
Share
Follow
Springwell Terrace North Back

Sunderland City Council are carrying out Highway improvement works on Springwell Terrace North Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 16 May 2025 at 12:26.

Northern Gas Networks logo
LONG TERM
Until
16 Sep 2025
Details
View Map
Share
Follow
C8b (From A183 Chester Road Junc To A1052 Junc)

Northern Gas Networks are carrying out Utility repair and maintenance works on C8b (From A183 Chester Road Junc To A1052 Junc), Bournmoor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 14:00 and could run through until 16 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 May 2025 at 14:10.

LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Burdon Lane

Sunderland City Council are proposing to carry out Highway improvement works on Burdon Lane, Burdon, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 16 May 2025 at 09:05.

LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Burdon Lane

Sunderland City Council were proposing to carry out Highway improvement works on Burdon Lane, Burdon, Sunderland.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 28 May 2025 at 07:21.

Northern Gas Networks logo
Between
28 May and 18 Jun 2025
Details
View Map
Share
Follow
Dorset Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorset Street, Easington Lane, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 09:11.

Northern Gas Networks logo
Between
28 May and 18 Jun 2025
Details
View Map
Share
Follow
Dorset Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorset Street, Easington Lane, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Mar 2025 at 07:58.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rydal Road

Northumbrian Water are carrying out Highway repair and maintenance works on Rydal Road, Chester-le-street.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:05 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 May 2025 at 09:16.

Northumbrian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mitchell Street Nos 2 - 70 Back From Durham Road To Ravensworth Road

Northumbrian Water are carrying out Utility repair and maintenance works on Mitchell Street Nos 2 - 70 Back From Durham Road To Ravensworth Road, Birtley Central, Birtley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 13:54 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 07:57.

Durham County Council logo
LONG TERM
Between
1 Jun and 31 Aug 2025
Details
View Map
Share
Follow
Durham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Durham Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 18 Feb 2025 at 09:00.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Washington Highway

Sunderland City Council are proposing to carry out Highway improvement works on Washington Highway, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Apr 2025 at 14:43.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Washington Highway

Sunderland City Council are proposing to carry out Highway improvement works on Washington Highway, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 30 May 2025 at 07:43.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Bonemill Lane

Sunderland City Council are proposing to carry out Highway improvement works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Apr 2025 at 14:44.

LONG TERM
Between
1 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Bonemill Lane

Sunderland City Council are proposing to carry out Highway improvement works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

The works will start on or after 1 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 30 May 2025 at 07:43.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
B1283 (From A181 Junc To Kidd Avenue Junc)

Durham County Council were proposing to carry out Highway repair and maintenance works on B1283 (From A181 Junc To Kidd Avenue Junc), Sherburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 09:21.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Chillingham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 14:34.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Dilston Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dilston Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 14:33.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Barrasford Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Barrasford Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 14:36.

Northern Powergrid (Northeast) logo
LONG TERM
Between
2 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Aged Miners Homes

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Aged Miners Homes, Easington Lane, Houghton-le-spring.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Apr 2025 at 10:18.

Durham County Council logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Cocken Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Cocken Road, Leamside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 13:12.

Durham County Council logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Pit House Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Pit House Lane, Leamside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 6 Nov 2024 at 13:43.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Black Boy Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Black Boy Road, Great Lumley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 14:28.

Durham County Council logo
Finishing
Monday
Details
View Map
Share
Follow
A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct)

Durham County Council are carrying out Highway repair and maintenance works on A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct), Chester Moor.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 2 Jun 2025 at 08:31.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 29 Sep 2025
Details
View Map
Share
Follow
C8b (From A183 Chester Road Junc To A1052 Junc)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on C8b (From A183 Chester Road Junc To A1052 Junc), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 08:59.

Northern Gas Networks logo
LONG TERM
Between
2 Jun and 29 Sep 2025
Details
View Map
Share
Follow
C8b (From A183 Chester Road Junc To A1052 Junc)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on C8b (From A183 Chester Road Junc To A1052 Junc), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 12:43.

Durham County Council logo
LONG TERM
Between
2 Jun and 30 Aug 2025
Details
View Map
Share
Chester Road

Durham County Council were proposing to carry out Highway repair and maintenance works on Chester Road, Bournmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Durham County Council on 1 Apr 2025 at 09:20.

Durham County Council logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Pelton Fell Banks

Durham County Council are proposing to carry out New service connection on Pelton Fell Banks, Pelton Fell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 09:27.

Northumbrian Water logo
Finishing
Saturday
Details
View Map
Share
Follow
The Avenue (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on The Avenue (Back), Pelton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:50 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 09:11.

Northumbrian Water logo
Finishing
Sunday
Details
View Map
Share
The Avenue (Back)

Northumbrian Water were proposing to carry out Utility repair and maintenance works on The Avenue (Back), Pelton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Jun 2025 at 08:53.

Northern Powergrid (Northeast) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Allendale Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Allendale Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Apr 2025 at 10:20.

Between
9 and 25 Jun 2025
Details
View Map
Share
Weymouth Road

GTC Pipelines were proposing to carry out Utility asset works on Weymouth Road, Sunderland.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 4 Apr 2025 at 13:56.

Between
9 and 25 Jun 2025
Details
View Map
Share
Follow
Weymouth Road

GTC Pipelines are proposing to carry out Utility asset works on Weymouth Road, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 11 Apr 2025 at 14:15.

Between
9 and 25 Jun 2025
Details
View Map
Share
Follow
Weymouth Road

GTC Pipelines are proposing to carry out Utility asset works on Weymouth Road, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 13 May 2025 at 09:28.

Northumbrian Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
The Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Avenue (Back), Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Mar 2025 at 10:13.

Northumbrian Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
The Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Avenue (Back), Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 15 May 2025 at 07:48.

Northern Gas Networks logo
LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
The Generals Wood

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 May 2025 at 12:55.

Northern Gas Networks logo
LONG TERM
Between
9 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:48.

Northern Gas Networks logo
LONG TERM
Between
9 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 13:00.

Durham County Council logo
Between
9 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Ouston Lane

Durham County Council are proposing to carry out New service connection on Ouston Lane, Ouston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 10:06.

Durham County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Black Boy Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Black Boy Road, Great Lumley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 22 May 2025 at 13:16.

Northern Gas Networks logo
Between
11 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Mar 2025 at 08:35.

Northern Gas Networks logo
Between
11 Jun and 10 Jul 2025
Details
View Map
Share
Follow
The Generals Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Generals Wood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:37.

Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Weymouth Road

GTC Pipelines were proposing to carry out Utility asset works on Weymouth Road, Sunderland.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 4 Apr 2025 at 13:47.

Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Weymouth Road

GTC Pipelines are proposing to carry out Utility asset works on Weymouth Road, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 11 Apr 2025 at 14:13.

Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Weymouth Road

GTC Pipelines are proposing to carry out Utility asset works on Weymouth Road, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 13 May 2025 at 09:29.

Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
A19 J A1231 Join N

Sunderland City Council are proposing to carry out Highway repair and maintenance works on A19 J A1231 Join N, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northern Gas Networks logo
LONG TERM
Between
25 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Sherburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherburn Road, Gilesgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Apr 2025 at 15:58.

Northern Gas Networks logo
LONG TERM
Between
25 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Dragon Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dragon Lane, Gilesgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Apr 2025 at 15:57.

Durham County Council logo
LONG TERM
Between
25 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Chillingham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 May 2025 at 09:55.

Durham County Council logo
LONG TERM
Between
25 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Dilston Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dilston Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 May 2025 at 09:53.

Durham County Council logo
LONG TERM
Between
25 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Barrasford Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Barrasford Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 May 2025 at 09:53.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Birtley Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birtley Lane, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:01.

Gateshead Metropolitan Borough Council logo
Between
26 and 28 Jun 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Northside, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 May 2025 at 13:07.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:15.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Mar 2025 at 08:33.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:52.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:41.

Northern Gas Networks logo
Between
27 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Bonemill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bonemill Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 12:57.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:14.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Mar 2025 at 08:34.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:44.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Alderwood

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 24 July 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 07:52.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:51.

Northern Gas Networks logo
Between
27 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Alderwood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Alderwood, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 24 July 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 12:58.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Sherburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherburn Road, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 13:39.

Northern Gas Networks logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Dragon Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dragon Lane, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 13:39.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Sherburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Sherburn Road, Gilesgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Aug 2024 at 09:00.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Dragon Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Dragon Lane, Gilesgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Aug 2024 at 09:04.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Dragon Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Dragon Lane, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Aug 2024 at 08:57.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Unc 27.6 (From Peel Avenue To C13 Junc)

Durham County Council are proposing to carry out Highway repair and maintenance works on Unc 27.6 (From Peel Avenue To C13 Junc), Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Aug 2024 at 09:02.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Brackendale Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Brackendale Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 27 Feb 2025 at 15:37.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
The Links

Durham County Council are proposing to carry out Highway repair and maintenance works on The Links, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 27 Feb 2025 at 15:23.

Durham County Council logo
Between
1 and 31 Jul 2025
Details
View Map
Share
Follow
Canterbury Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Canterbury Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 12:30.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Castle Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Castle Close, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:03.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Eighth Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Eighth Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:28.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Murray Place

Durham County Council are proposing to carry out Highway repair and maintenance works on Murray Place, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:10.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Twelfth Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Twelfth Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:14.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Jacques Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Jacques Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 11:20.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:05.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:52.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 13:37.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 09:09.

Northern Gas Networks logo
Between
4 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 12:49.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shunner Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:28.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shunner Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:36.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shunner Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:14.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shieldclose

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shieldclose, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 14:07.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shieldclose

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shieldclose, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:35.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Shieldclose

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shieldclose, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:25.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:22.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:44.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
Knoulberry Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:22.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
High Heath

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Heath, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2025 at 13:15.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
High Heath

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Heath, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 09:39.

Northern Gas Networks logo
Between
4 and 25 Jul 2025
Details
View Map
Share
Follow
High Heath

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Heath, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 11:20.

Durham County Council logo
LONG TERM
Between
7 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Canterbury Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Canterbury Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 27 May 2025 at 10:51.

Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Station Road West Back

Sunderland City Council are proposing to carry out Highway improvement works on Station Road West Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 30 Apr 2025 at 14:25.

Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Station Road West Back

Sunderland City Council are proposing to carry out Diversionary works on Station Road West Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 May 2025 at 11:13.

Gateshead Metropolitan Borough Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Birtley Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birtley Lane, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2025 at 13:16.

Gateshead Metropolitan Borough Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mount Pleasant Road, Northside, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2025 at 13:17.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 Through J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 Through J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 2 Apr 2025 at 11:00.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 J A690/b1286 Leave S

Sunderland City Council are proposing to carry out Highway improvement works on A19 J A690/b1286 Leave S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 From J A183 To J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 From J A183 To J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
A19 J A183 Join S

Sunderland City Council are proposing to carry out Highway improvement works on A19 J A183 Join S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 14:01.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 09:19.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:24.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Mar 2025 at 09:41.

Northern Gas Networks logo
LONG TERM
Between
18 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 21 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 11:04.

Durham County Council logo
LONG TERM
Between
19 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Dryburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dryburn Road, Framwellgate Moor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 19 Mar 2025 at 11:47.

Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
A19 Through J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 Through J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 23 May 2025 at 16:30.

Northumbrian Water logo
LONG TERM
Between
21 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Pelton Lane

Northumbrian Water are proposing to carry out Utility asset works on Pelton Lane, Pelton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 2 Jun 2025 at 11:54.

Northern Gas Networks logo
LONG TERM
Between
25 Jul and 5 Dec 2025
Details
View Map
Share
Follow
Raby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 08:49.

Northern Gas Networks logo
LONG TERM
Between
25 Jul and 22 Dec 2025
Details
View Map
Share
Follow
Raby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 09:11.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
A1052 (From Chester Road To Woodstone Village)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1052 (From Chester Road To Woodstone Village), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 09:00.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
A1052 (From Chester Road To Woodstone Village)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1052 (From Chester Road To Woodstone Village), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Feb 2025 at 11:18.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 2 Sep 2025
Details
View Map
Share
Follow
A1052 (From Chester Road To Woodstone Village)

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on A1052 (From Chester Road To Woodstone Village), Bournmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Feb 2025 at 11:50.

Durham County Council logo
LONG TERM
Between
1 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Bullion Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Bullion Lane, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 8 Apr 2025 at 10:10.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Follow
Harraton Footpath 28

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 August 2025 and could run through until 21 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 07:21.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Follow
Harraton Footpath 28

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 August 2025 and could run through until 21 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 14:35.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Follow
Harraton Footpath 28

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 August 2025 and could run through until 21 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2025 at 10:20.

Northern Gas Networks logo
Between
1 and 21 Aug 2025
Details
View Map
Share
Harraton Footpath 28

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harraton Footpath 28, Washington.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 21 August 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 08:09.

Durham County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Bent House Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Bent House Lane, Gilesgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 22 May 2025 at 14:22.

Durham County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Cuthbert Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Cuthbert Avenue, Gilesgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 22 May 2025 at 14:21.

Durham County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Sherburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Sherburn Road, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 27 May 2025 at 09:47.

Durham County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Dragon Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Dragon Lane, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 27 May 2025 at 08:55.

Durham County Council logo
LONG TERM
Between
11 Aug and 10 Nov 2025
Details
View Map
Share
Follow
A181 (From Sherburn Road To Silent Bank)

Durham County Council are proposing to carry out Highway improvement works on A181 (From Sherburn Road To Silent Bank), Sherburn House.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 14:29.

Durham County Council logo
LONG TERM
Between
11 Aug and 10 Nov 2025
Details
View Map
Share
Follow
B1283 (From A181 Junc To Kidd Avenue Junc)

Durham County Council are proposing to carry out Highway improvement works on B1283 (From A181 Junc To Kidd Avenue Junc), Sherburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 14:31.

Durham County Council logo
LONG TERM
Between
18 Aug and 10 Nov 2025
Details
View Map
Share
Follow
Sherburn Road

Durham County Council are proposing to carry out Highway improvement works on Sherburn Road, Gilesgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 12 May 2025 at 14:30.

Northern Gas Networks logo
LONG TERM
Between
22 Aug and 22 Dec 2025
Details
View Map
Share
Follow
Raby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Apr 2025 at 11:23.

Northern Gas Networks logo
LONG TERM
Between
22 Aug and 22 Dec 2025
Details
View Map
Share
Raby Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Raby Road, Oxclose, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 22 December 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 29 May 2025 at 10:43.


Roadworks Map near to Tantallon Court, HOUGHTON LE SPRING, DH4 6TJ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 22:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tantallon Court, HOUGHTON LE SPRING, DH4 6TJ (13 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
MAJOR
  
C8B (FROM A183 CHESTER ROAD JUNC TO A1052 JUNC) 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 2 Jun 2025 - 29 Sep 2025
0.4
Details
Share
Follow
2
Northern Gas Networks logo
MAJOR
  
C8B (FROM A183 CHESTER ROAD JUNC TO A1052 JUNC) 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 19 May 2025 14:00
(Scheduled: 19 May 2025 - 16 Sep 2025)
0.4
Details
Share
Follow
3
Northern Gas Networks logo
MAJOR
  
BEAUMARIS 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 27 May 2025 10:00
(Scheduled: 22 May 2025 - 1 Jul 2025)
0.6
Details
Share
Follow
4
Northern Gas Networks logo
MAJOR
  
ELLESMERE 
(0.6 miles)
Northern Gas Networks
Permanent reinstatement - Footway, Carriageway - Give and take
In Progress
Since: 27 May 2025 10:00
(Scheduled: 22 May 2025 - 1 Jul 2025)
0.6
Details
Share
Follow
5
Northern Gas Networks logo
EMERGENCY
  
STATION AVENUE NORTH, FENCE HOUSES 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
22 May 2025 21:12 - 27 May 2025 09:42
0.6
Details
Share
6
Northumbrian Water logo
URGENT
  
VIOLET TERRACE 
(0.6 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 29 May 2025 - 4 Jun 2025)
0.6
Details
Share
7
Northumbrian Water logo
EMERGENCY
  
VIOLET TERRACE 
(0.6 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 29 May 2025 21:16
(Scheduled: 29 May 2025 - 5 Jun 2025)
0.6
Details
Share
Follow
8
Northern Gas Networks logo
MAJOR
  
ST BARNABAS 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
5 May 2025 17:00 - 3 Jun 2025 11:30
0.7
Details
Share
9
Northern Gas Networks logo
MAJOR
  
ST BARNABAS 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 12 May 2025 - 23 Jun 2025
0.7
Details
Share
Follow
10
Northern Gas Networks logo
MAJOR
  
C8B (FROM A183 CHESTER ROAD JUNC TO A1052 JUNC) 
(0.7 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 2 Jun 2025 - 29 Sep 2025
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.