ROADWORKS SUMMARY
Southworth Road, DERBY, DE73 8LU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Southworth Road, DE73 8LU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Southworth Road, DERBY, DE73 8LU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Southworth Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leicestershire County Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Footpath L13

Leicestershire County Council are carrying out Highway improvement works on Footpath L13, Shepshed.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2023 at 09:19 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 13 Mar 2024 at 16:56.

Severn Trent Water logo
LONG TERM
Until
29 Dec 2024
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are carrying out roadworks on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The works started on 27 November 2023 at 08:00 and could run through until 29 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Aug 2024 at 12:46.

Severn Trent Water logo
LONG TERM
Until
29 Dec 2024
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are carrying out Utility asset works on Church Lane, Osgathorpe.

These works are categorised as Major.

The works started on 22 January 2024 at 08:00 and could run through until 29 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Aug 2024 at 12:46.

Severn Trent Water logo
LONG TERM
Between
1 Jul 2024 and 3 Jul 2027
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out New service connection on Main Street, Ingleby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 3 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 14:36.

Leicestershire County Council logo
LONG TERM
Between
31 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.

Severn Trent Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Layby Off B5324 Westbound Ashby Road

Severn Trent Water are carrying out Utility asset works on Layby Off B5324 Westbound Ashby Road, Belton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 09:57.

National Highways logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Ashby Road

National Highways are carrying out Works for road purposes on Ashby Road, Castle Donington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 20:00 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Dec 2024 at 10:16.

Severn Trent Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Moor Lane

Severn Trent Water are carrying out Utility asset works on Moor Lane, Tonge, Breedon On The Hill.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:00 and could run through until 10 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 09:42.

Severn Trent Water logo
LONG TERM
Between
2 Dec 2024 and 30 May 2025
Details
View Map
Share
Follow
From Main Street To Moor Lane

Severn Trent Water are proposing to carry out Utility asset works on From Main Street To Moor Lane, Breedon On The Hill.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 11:56.

Connect Fibre (Fibre Assets) logo
Between
4 and 20 Dec 2024
Details
View Map
Share
The Green

Connect Fibre (Fibre Assets) were proposing to carry out Utility asset works on The Green, Diseworth, Long Whatton And Diseworth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 27 Nov 2024 at 16:55.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
West End

Leicestershire County Council are proposing to carry out Highway improvement works on West End, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Smithy Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Smithy Lane, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Aug 2024 at 17:26.

Leicestershire County Council logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Dec 2024 at 12:56.

Leicestershire County Council logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Ashby Road West

Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 3 Dec 2024 at 14:48.

Severn Trent Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Robinsons Hill

Severn Trent Water were proposing to carry out Utility asset works on Robinsons Hill, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:50.

Severn Trent Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Stoney Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stoney Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 12:56.

Severn Trent Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Stoney Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stoney Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 12:46.

Leicestershire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Breedon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Breedon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 11 Nov 2024 at 13:06.

Leicestershire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Breedon Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Breedon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 7 Nov 2024 at 15:16.

BT logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Worthington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 14:30.

Network Rail logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Kings Mill Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kings Mill Lane, Weston-on-trent, Derby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 15:15.

BT logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 14:25.

BT logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Nottingham Road

BT are proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 14:22.

Network Rail logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Kings Mill Lane

Network Rail are proposing to carry out Works for Rail Purposes on Kings Mill Lane, Weston-on-trent, Derby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 12:23.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Main Street

Leicestershire County Council are proposing to carry out Highway improvement works on Main Street, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Smithy Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Smithy Lane, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 20 Aug 2024 at 14:46.

Leicestershire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
West End

Leicestershire County Council are proposing to carry out Highway improvement works on West End, Long Whatton, Long Whatton And Diseworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 28 Nov 2024 at 15:36.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Lane, Swannington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:56.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Church Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Lane, Swannington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:56.

Leicestershire County Council logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Park Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 2 Dec 2024 at 11:16.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
From A511 Ashby Road To The Moorlands

Severn Trent Water are proposing to carry out Utility repair and maintenance works on From A511 Ashby Road To The Moorlands, Ravenstone With Snibston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:06.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 12:46.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Snarrows Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snarrows Road, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:16.

Leicestershire County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Leicestershire County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Bosworth Road

Leicestershire County Council are proposing to carry out Highway improvement works on Bosworth Road, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Severn Trent Water logo
LONG TERM
Between
12 Feb and 13 May 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 13 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 10:50.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Lockington-hemington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 13:06.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Green

Leicestershire County Council are proposing to carry out Highway improvement works on The Green, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Park Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 29 Apr 2025
Details
View Map
Share
Ashby Road

Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.

Leicestershire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Belton Street

Leicestershire County Council are proposing to carry out Highway improvement works on Belton Street, Shepshed.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 15 Nov 2024 at 14:56.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 27 Nov 2024 at 11:27.

Leicestershire County Council logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Holly Hayes Road

Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.

BT logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Breedon Lane

BT are proposing to carry out Utility asset works on Breedon Lane, Osgathorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 25 Nov 2024 at 12:19.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Barroon

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Barroon, Castle Donington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Nov 2024 at 14:43.

Severn Trent Water logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Severn Trent Water are proposing to carry out New service connection on Moor Lane, Coleorton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 14:56.


Roadworks Map near to Southworth Road, DERBY, DE73 8LU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Southworth Road, DERBY, DE73 8LU (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)