ROADWORKS SUMMARY
Moor Lane, DERBY, DE73 8BB
Introduction
View current and future planned roadworks and road closures for Moor Lane, DE73 8BB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Moor Lane, DERBY, DE73 8BB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Moor Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Mar 2025
Leicestershire County Council are carrying out Highway improvement works on Footpath L13, Shepshed.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2023 at 09:19 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2024 at 16:56.
29 Mar 2025
Severn Trent Water are carrying out roadworks on Snarrows Road, Osgathorpe.
These works are categorised as Major.
The works started on 27 November 2023 at 08:00 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 07:56.
29 Mar 2025
Severn Trent Water are carrying out Utility asset works on Church Lane, Osgathorpe.
These works are categorised as Major.
The works started on 22 January 2024 at 08:00 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 07:56.
20 Sep 2025
Leicestershire County Council are carrying out Highway improvement works on Footpath L73, Lockington-hemington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 March 2024 at 10:00 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 9 Sep 2024 at 13:06.
1 Jul 2024 and 3 Jul 2027
Severn Trent Water are proposing to carry out New service connection on Main Street, Ingleby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 3 July 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 14:36.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 11:56.
1 Sep 2024 and 30 Sep 2026
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath K74, Hathern.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 30 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 30 May 2024 at 09:26.
2 Mar 2025
Severn Trent Water are carrying out Utility asset works on Layby Off B5324 Westbound Ashby Road, Belton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 09:30 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 09:57.
31 May 2025
National Highways are carrying out Works for road purposes on Ashby Road, Castle Donington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 20:00 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Jan 2025 at 12:16.
2 Dec 2024 and 30 May 2025
Severn Trent Water are proposing to carry out Utility asset works on From Main Street To Moor Lane, Breedon On The Hill.
These works are categorised as Major.
The works will start on or after 2 December 2024 and could run through until 30 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 11:56.
30 May 2025
Severn Trent Water are carrying out Utility asset works on From Main Street To Moor Lane, Breedon On The Hill.
These works are categorised as Major.
The works started on 9 December 2024 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 09:22.
Friday
Severn Trent Water are carrying out Utility asset works on From Gelscoe Lane To Mill Lane, Belton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 08:00 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 15:46.
6 Jan and 9 Feb 2025
Leicestershire County Council were proposing to carry out Highway improvement works on Ashby Road West, Shepshed.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Dec 2024 at 16:44.
6 Jan and 3 Mar 2025
Severn Trent Water were proposing to carry out Utility asset works on Robinsons Hill, Melbourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:50.
Friday
Severn Trent Water are carrying out Utility asset works on A453 From Walton Hill To Moor Lane, Isley Cum Langley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2025 at 08:00 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 14 Jan 2025 at 15:46.
6 Jan and 9 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 3 Dec 2024 at 12:56.
6 Jan and 9 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Ashby Road West, Shepshed.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 3 Dec 2024 at 14:48.
13 and 28 Jan 2025
BT are proposing to carry out Utility asset works on Nottingham Road, Ashby De La Zouch, Ashby-de-la-zouch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 14:22.
13 and 28 Jan 2025
BT were proposing to carry out Utility asset works on Nottingham Road, Lount, Staunton Harold.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 2 Jan 2025 at 13:00.
13 Jan and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Broadstone Lane, Ticknall, Derby.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Jan 2025 at 12:36.
13 and 28 Jan 2025
BT were proposing to carry out Utility asset works on Nottingham Road, Worthington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Jan 2025 at 13:01.
7 Feb 2025
Severn Trent Water are carrying out Utility asset works on Broadstone Lane, Ticknall, Derby.
These works are categorised as Major.
The works started on 13 January 2025 at 09:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 09:46.
Friday
Leicestershire County Council are carrying out Highway improvement works on Hathern Road, Hathern.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 10:35 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 11:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on Hathern Road, Long Whatton, Long Whatton And Diseworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 10:36 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 11:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on Turvey Lane, Long Whatton, Long Whatton And Diseworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 10:37 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 11:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on The Green, Long Whatton, Long Whatton And Diseworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 10:39 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 11:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on Main Street, Long Whatton, Long Whatton And Diseworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 10:37 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 11:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on Smithy Lane, Long Whatton, Long Whatton And Diseworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 11:03 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 11:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on West End, Long Whatton, Long Whatton And Diseworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 10:07 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 10:36.
Tomorrow
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Lane, Swannington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:56.
27 Jan and 7 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 2 Dec 2024 at 11:16.
29 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snarrows Road, Osgathorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 12:46.
29 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Snarrows Road, Osgathorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 13:16.
10 and 28 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bosworth Road, Castle Donington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.
10 and 28 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.
12 Feb and 13 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 February 2025 and run through until 13 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 10:50.
17 Feb and 29 Apr 2025
Severn Trent Water were proposing to carry out Utility asset works on Ashby Road, Melbourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.
17 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Derby Road, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 16:03.
17 and 21 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Park Lane, Castle Donington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.
17 and 21 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on The Green, Castle Donington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 14 Oct 2024 at 15:16.
17 and 20 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Lockington-hemington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 13:06.
17 and 20 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Lockington-hemington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 10:36.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 27 Nov 2024 at 11:27.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 27 Nov 2024 at 11:27.
17 and 21 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Belton Street, Shepshed.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 9 Dec 2024 at 16:46.
17 and 21 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Belton Street, Shepshed.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 10 Dec 2024 at 16:06.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Breedon Lane, Osgathorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Dec 2024 at 13:56.
24 and 27 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Moor Lane, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 07:56.
24 and 27 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Moor Lane, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 14:56.
24 Feb and 14 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Barroon, Castle Donington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Dec 2024 at 10:57.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Castle Street, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Jan 2025 at 14:24.
3 and 7 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Rycroft Road, Hemington, Lockington-hemington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 16 Jan 2025 at 16:35.
3 Mar and 25 Apr 2025
Severn Trent Water are proposing to carry out Utility asset works on Robinsons Hill, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 12:14.
3 Mar and 6 Apr 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Fairway Road, Shepshed.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Dec 2024 at 17:26.
7 and 9 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Holly Hayes Road, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Jan 2025 at 14:46.
9 and 11 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Oakley Drive, Long Whatton And Diseworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Jan 2025 at 14:46.
10 and 14 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Church Lane, Whitwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 16 Jan 2025 at 16:32.
10 and 12 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Anchor Lane, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 13:16.
10 and 12 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Anchor Lane, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 16:36.
10 and 21 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Loughborough Road, Shepshed.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 27 Dec 2024 at 15:36.
10 and 12 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Castle Street, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 12:21.
13 and 19 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Derby Road, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 09:45.
17 and 19 Mar 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Market Street, Castle Donington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 16:19.
24 Mar and 10 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Wide Lane, Hathern.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 09:36.
24 and 28 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Breedon Lane, Worthington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 16 Jan 2025 at 16:29.
24 and 26 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility asset works on Nottingham Road, Peggs Green, Coleorton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 16 Jan 2025 at 16:34.
24 and 28 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Ferrers Close, Castle Donington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 20 Jan 2025 at 13:06.
24 Mar and 10 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Derby Road, Hathern.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 17:26.
31 Mar and 16 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Alderslade Close, Aston-on-trent, Derby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 14:07.
31 Mar and 12 May 2025
Cadent Gas are proposing to carry out Utility asset works on Derby Road, Aston-on-trent, Derby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 14:06.
31 Mar and 29 Apr 2025
Severn Trent Water were proposing to carry out Utility asset works on Selina Street, Melbourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:51.
31 Mar and 16 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Penn Lane, Melbourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:53.
7 Apr and 17 May 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Whatton Road, Kegworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Jan 2025 at 15:29.
7 Apr and 17 May 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Broadhill Road, Kegworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Jan 2025 at 15:29.
7 Apr and 17 May 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Burley Rise, Kegworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 20 Jan 2025 at 15:29.
7 and 20 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Pack Horse Road, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 14:08.
10 Apr and 16 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Broad Rushes, Castle Donington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Electricity Network Company on 13 Jan 2025 at 15:16.
14 and 18 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Melbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Jan 2025 at 13:26.
15 and 17 Apr 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Market Street, Castle Donington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 09:45.
15 and 17 Apr 2025
Severn Trent Water were proposing to carry out roadworks on Apiary Gate, Castle Donington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 13:56.
Roadworks Map near to Moor Lane, DERBY, DE73 8BB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Moor Lane, DERBY, DE73 8BB (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 9 Dec 2024 - 30 May 2025)
(Scheduled: 6 Jan 2025 - 24 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.