ROADWORKS SUMMARY
Back Of Ecton, ASHBOURNE, DE6 2AJ
Introduction
View current and future planned roadworks and road closures for Back Of Ecton, DE6 2AJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Back Of Ecton, ASHBOURNE, DE6 2AJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Back Of Ecton are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Knowsley Hill, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Ball Bank Lane, Barrow Moor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 16:01.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Fawfieldhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Fawfield Head, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 16:01.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Shawfield Road, Newtown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Moneyash Road, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Side, Thorncliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 13:06.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Morridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 12:44.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Lodge Lane, Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:38.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:06.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Bradnop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:24.
17 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Morridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:06.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Side, Thorncliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:36.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Bradnop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:36.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the verge only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:15.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Buxton Road, Wetton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ashbourne Road, Wetton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Long Lane, Alstonefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wallditch Lane, Wetton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Larkstone Lane, Grindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Warslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:02.
6 Jan and 1 Mar 2025
Derbyshire County Council are proposing to carry out Works for road purposes on Via Gellia Road, Bonsall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 19:12.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Elkstones, Butterton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:36.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Blakemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:05.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pown Street, Sheen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:49.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Newtown Road, Shawfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:49.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Lane, Reapsmoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:49.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knowsley Hill, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 15:49.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wetton Road, Wettonmill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:19.
6 and 22 Jan 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Edge Top Road, Hollinsclough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the verge only.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 4 Dec 2024 at 14:57.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:30.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Parsons Lane, Grindon Moor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:49.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Titterton Lane, Onecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:49.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Furlong Lane, Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:05.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lodge Lane, Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:36.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Morridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 08:12.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodisse Lane, Grindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:05.
8 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the verge only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:10.
9 and 29 Jan 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Ball Ridge Lane, Sheen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 12 Dec 2024 at 09:14.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Millmoor Head, Blakemere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:14.
13 and 15 Jan 2025
Severn Trent Water were proposing to carry out New service connection on Redway, Hulme End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:23.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rocester Lane, Waterfall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 14:00.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Bromley Edge Lane, Waterfall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:12.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Bromley Edge Lane, Waterfall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:18.
20 and 22 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wetton Road, Wettonmill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:40.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cross Lane, Waterfall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:42.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 10:24.
29 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Warslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 14:06.
29 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pown Street, Sheen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:01.
29 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 10:47.
29 and 31 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Newtown Road, Shawfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 16:18.
29 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Shawfield Road, Shawfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:02.
29 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Lane, Reapsmoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:01.
31 Jan and 18 Feb 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Edge Top Road, Hollinsclough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 18 February 2025. The works will impact the verge only.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 25 Nov 2024 at 15:46.
3 and 5 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Martinslow Lane, Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 15:03.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Long Lane, Alstonefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 09:46.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pethills Lane, Pethillshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 10:51.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Knowsley Hill, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 09:16.
3 and 5 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dairy House Lane, Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 13:57.
3 and 5 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dairy House Lane, Ford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 07:26.
3 and 5 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ford Lane, Grindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 10:53.
3 and 5 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wallditch Lane, Wetton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:19.
10 and 12 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Furlong Lane, Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 11:42.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Redway, Hulme End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 09:28.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Redway, Hulme End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 15:03.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heathcote, Hartington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 20:20.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heathcote, Hartington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:19.
13 and 27 Feb 2025
Connect Fibre (Fibre Assets) were proposing to carry out Utility repair and maintenance works on Millmoor, Fawfieldhead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 27 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 5 Dec 2024 at 19:28.
15 Feb and 14 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Edge Top Road, Hollinsclough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 15 Nov 2024 at 13:09.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 10:56.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Warslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 13:03.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rocester Lane, Waterfall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 11:25.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rocester Lane, Waterfall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 08:11.
4 and 6 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Douse Lane, Bradnop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 12:47.
5 and 21 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Ball Bank Lane, Barrow Moor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 5 Dec 2024 at 15:06.
10 and 25 Mar 2025
Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Coalpit Lane, Longnor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 10 Dec 2024 at 16:50.
Roadworks Map near to Back Of Ecton, ASHBOURNE, DE6 2AJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Back Of Ecton, ASHBOURNE, DE6 2AJ (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 5 Dec 2024 - 26 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.