ROADWORKS SUMMARY
Back Of Ecton, ASHBOURNE, DE6 2AJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Back Of Ecton, DE6 2AJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Back Of Ecton, ASHBOURNE, DE6 2AJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Back Of Ecton are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Knowsley Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Knowsley Hill, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ball Bank Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ball Bank Lane, Barrow Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 16:01.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Fawfieldhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fawfield Head

Staffordshire County Council are proposing to carry out Highway improvement works on Fawfield Head, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 16:01.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Shawfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Shawfield Road, Newtown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Moneyash Road

Staffordshire County Council are proposing to carry out Highway improvement works on Moneyash Road, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Morridge Side

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Side, Thorncliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 13:06.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Morridge Top Road

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Morridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 12:44.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lodge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lodge Lane, Hope.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:38.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Back Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:06.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Morridge Top Road

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Bradnop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:24.

Staffordshire County Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Morridge Top Road

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Morridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:06.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Morridge Side

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Side, Thorncliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:36.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Morridge Top Road

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Bradnop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:36.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Back Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the verge only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:15.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Buxton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Buxton Road, Wetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Ashbourne Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ashbourne Road, Wetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Long Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Long Lane, Alstonefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Wallditch Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wallditch Lane, Wetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Larkstone Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Larkstone Lane, Grindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Warslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:02.

Derbyshire County Council logo
LONG TERM
Between
6 Jan and 1 Mar 2025
Details
View Map
Share
Follow
Via Gellia Road

Derbyshire County Council are proposing to carry out Works for road purposes on Via Gellia Road, Bonsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 6 Nov 2024 at 19:12.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elkstones

Staffordshire County Council are proposing to carry out Highway improvement works on Elkstones, Butterton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:36.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Blakemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:05.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Pown Street

Staffordshire County Council are proposing to carry out Highway improvement works on Pown Street, Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:49.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Newtown Road

Staffordshire County Council are proposing to carry out Highway improvement works on Newtown Road, Shawfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:49.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on School Lane, Reapsmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:49.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Knowsley Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knowsley Hill, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 15:49.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Wetton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wetton Road, Wettonmill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:19.

Connect Fibre (Fibre Assets) logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Edge Top Road

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Edge Top Road, Hollinsclough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 4 Dec 2024 at 14:57.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Ford Wetley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 11:30.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Parsons Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Parsons Lane, Grindon Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:49.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Titterton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Titterton Lane, Onecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:49.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Furlong Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Furlong Lane, Hope.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:05.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Lodge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lodge Lane, Hope.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Oct 2024 at 10:36.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Morridge Top Road

Staffordshire County Council are proposing to carry out Highway improvement works on Morridge Top Road, Morridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 08:12.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Woodisse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodisse Lane, Grindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:05.

Staffordshire County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Back Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:10.

Connect Fibre (Fibre Assets) logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Ball Ridge Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Ball Ridge Lane, Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 12 Dec 2024 at 09:14.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Millmoor Head

Staffordshire County Council are proposing to carry out Highway improvement works on Millmoor Head, Blakemere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 16:14.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Redway

Severn Trent Water were proposing to carry out New service connection on Redway, Hulme End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:23.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rocester Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Rocester Lane, Waterfall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 14:00.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Bromley Edge Lane

Severn Trent Water are proposing to carry out New service connection on Bromley Edge Lane, Waterfall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:12.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Bromley Edge Lane

Severn Trent Water are proposing to carry out New service connection on Bromley Edge Lane, Waterfall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:18.

Staffordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Wetton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wetton Road, Wettonmill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:40.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cross Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cross Lane, Waterfall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:42.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Back Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Back Lane, Thorncliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 10:24.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Warslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 14:06.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Pown Street

Staffordshire County Council are proposing to carry out Highway improvement works on Pown Street, Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:01.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Ford Wetley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 10:47.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Newtown Road

Staffordshire County Council were proposing to carry out Highway improvement works on Newtown Road, Shawfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 16:18.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Shawfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Shawfield Road, Shawfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:02.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on School Lane, Reapsmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:01.

Connect Fibre (Fibre Assets) logo
Between
31 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Edge Top Road

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Edge Top Road, Hollinsclough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 18 February 2025. The works will impact the verge only.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 25 Nov 2024 at 15:46.

Staffordshire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Martinslow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Martinslow Lane, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 15:03.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Long Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Long Lane, Alstonefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 09:46.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Pethills Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pethills Lane, Pethillshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 10:51.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Knowsley Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Knowsley Hill, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 09:16.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Dairy House Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dairy House Lane, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 13:57.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Dairy House Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dairy House Lane, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 07:26.

Staffordshire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Ford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Lane, Grindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 10:53.

Staffordshire County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Wallditch Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wallditch Lane, Wetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:19.

Staffordshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Furlong Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Furlong Lane, Hope.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 11:42.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Redway

Severn Trent Water are proposing to carry out New service connection on Redway, Hulme End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 09:28.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Redway

Severn Trent Water are proposing to carry out New service connection on Redway, Hulme End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 15:03.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Heathcote

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heathcote, Hartington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 20:20.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Heathcote

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heathcote, Hartington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:19.

Connect Fibre (Fibre Assets) logo
Between
13 and 27 Feb 2025
Details
View Map
Share
Millmoor

Connect Fibre (Fibre Assets) were proposing to carry out Utility repair and maintenance works on Millmoor, Fawfieldhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 27 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 5 Dec 2024 at 19:28.

Connect Fibre (Fibre Assets) logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Edge Top Road

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Edge Top Road, Hollinsclough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 15 Nov 2024 at 13:09.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 10:56.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Warslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 13:03.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Rocester Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Rocester Lane, Waterfall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 11:25.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Rocester Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Rocester Lane, Waterfall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 08:11.

Severn Trent Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Douse Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Douse Lane, Bradnop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 12:47.

Connect Fibre (Fibre Assets) logo
Between
5 and 21 Mar 2025
Details
View Map
Share
Follow
Ball Bank Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Ball Bank Lane, Barrow Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 5 Dec 2024 at 15:06.

Connect Fibre (Fibre Assets) logo
Between
10 and 25 Mar 2025
Details
View Map
Share
Follow
Coalpit Lane

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on Coalpit Lane, Longnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 10 Dec 2024 at 16:50.


Roadworks Map near to Back Of Ecton, ASHBOURNE, DE6 2AJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 12 Dec 2024 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Back Of Ecton, ASHBOURNE, DE6 2AJ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Staffordshire County Council logo
EMERGENCY
  
MANIFOLD VALLEY ROAD 
(0.8 miles)
Staffordshire County Council
Highway improvement works - Footpath - Road closure
In Progress
Since: 5 Dec 2024 15:48
(Scheduled: 5 Dec 2024 - 26 Dec 2024)
0.8
Details
Share
Follow