ROADWORKS SUMMARY
Brunel Way, DARTFORD, DA1 5GA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brunel Way, DA1 5GA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brunel Way, DARTFORD, DA1 5GA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brunel Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

Kent County Council logo
LONG TERM
Between
9 Sep 2024 and 25 Apr 2025
Details
View Map
Share
Follow
College Road

Kent County Council are proposing to carry out Highway improvement works on College Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 30 Jul 2024 at 14:48.

Kent County Council logo
LONG TERM
Between
9 Sep 2024 and 25 Apr 2025
Details
View Map
Share
Follow
College Road

Kent County Council are proposing to carry out Highway improvement works on College Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 4 Sep 2024 at 08:17.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

Kent County Council logo
LONG TERM
Between
27 Sep 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Galley Hill Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Galley Hill Road, Swanscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 31 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 14:51.

Kent County Council logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Galley Hill Road

Kent County Council are carrying out Highway repair and maintenance works on Galley Hill Road, Swanscombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 00:01 and could run through until 31 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 15:25.

London Borough Of Bexley logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 14:39.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 21 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:04.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:25.

Thames Water logo
LONG TERM
Between
2 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:10.

Thames Water logo
LONG TERM
Between
2 Jan and 12 May 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, West Thurrock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Aug 2024 at 11:35.

Thurrock Council logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, West Thurrock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thurrock Council on 13 Feb 2024 at 10:27.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:15.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:50.

Thames Water logo
LONG TERM
Between
22 Jan and 9 May 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:44.

LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Bob Dunn Way

Riverside Energy Park are carrying out Utility asset works on Bob Dunn Way, Dartford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 25 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 15 Apr 2025 at 12:26.

Thames Water logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Halt Robin Road

Thames Water are carrying out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2025 at 08:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 08:39.

Thames Water logo
LONG TERM
Between
27 Jan and 29 May 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 13:28.

Thames Water logo
LONG TERM
Between
1 Feb and 8 May 2025
Details
View Map
Share
Ashburnham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:36.

LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Joyce Green Lane

Riverside Energy Park are carrying out Utility asset works on Joyce Green Lane, Dartford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 08:00 and could run through until 25 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 15 Apr 2025 at 12:23.

Thames Water logo
LONG TERM
Between
10 Feb and 31 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 12:12.

Thames Water logo
LONG TERM
Between
10 Feb and 31 Aug 2025
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jan 2025 at 11:53.

Thames Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are carrying out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 14:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 14:11.

Thames Water logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:44.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
South Road

Cadent Gas are proposing to carry out Utility asset works on South Road, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:45.

Thames Water logo
LONG TERM
Between
18 Feb and 28 Apr 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:39.

Thames Water logo
LONG TERM
Between
20 Feb and 20 Jun 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 12:11.

Kent County Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
The Hill

Kent County Council are carrying out Highway improvement works on The Hill, Northfleet, Gravesend.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 09:12 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 2 Apr 2025 at 18:01.

Transport for London (TfL) logo
LONG TERM
Between
24 Feb and 11 May 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 16:31.

LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Fastrack The Bridge

Riverside Energy Park are carrying out Utility asset works on Fastrack The Bridge, Dartford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Riverside Energy Park on 15 Apr 2025 at 12:33.

Thames Water logo
LONG TERM
Between
24 Feb and 30 May 2025
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 16:05.

Thames Water logo
LONG TERM
Between
24 Feb and 12 Jun 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.

LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are carrying out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 25 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 25 Mar 2025 at 13:34.

Thames Water logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.

Thames Water logo
LONG TERM
Between
4 Mar and 26 May 2025
Details
View Map
Share
Lyndon Road

Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:00.

Thames Water logo
LONG TERM
Between
6 Mar and 4 Jun 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:41.

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Picardy Manorway

Riverside Energy Park are carrying out Utility asset works on Picardy Manorway, Belvedere.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 08:00 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 3 Apr 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 12:10.

London Borough Of Bexley logo
LONG TERM
Between
14 Mar and 2 May 2025
Details
View Map
Share
Follow
Crabtree Manorway North

London Borough Of Bexley are proposing to carry out Section 50 on Crabtree Manorway North, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 25 Mar 2025 at 10:41.

London Borough Of Bexley logo
LONG TERM
Between
14 Mar and 2 May 2025
Details
View Map
Share
Follow
Crabtree Manorway North

London Borough Of Bexley are proposing to carry out Section 50 on Crabtree Manorway North, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 25 Mar 2025 at 11:01.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thurrock Council on 4 Dec 2024 at 10:25.

Thurrock Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are carrying out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 March 2025 at 17:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 7 Apr 2025 at 08:25.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 09:49.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 15:53.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 29 Nov 2024 at 14:29.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
London Road

Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 2 Dec 2024 at 08:15.

Thurrock Council logo
LONG TERM
Between
15 Mar and 2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are proposing to carry out Highway improvement works on London Road, South Stifford, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thurrock Council on 4 Dec 2024 at 10:25.

Thurrock Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
London Road

Thurrock Council are carrying out Highway improvement works on London Road, South Stifford, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 March 2025 at 17:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 7 Apr 2025 at 08:25.

Southern Gas Networks logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Elmwood Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Elmwood Drive, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 17:30 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:13.

Thames Water logo
LONG TERM
Between
23 Mar and 8 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.

Southern Gas Networks logo
LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
Haslemere Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Haslemere Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 09:45 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:16.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 11:57.

Cadent Gas logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Harty Close

Cadent Gas are carrying out Utility asset works on Harty Close, Stifford Clays, Grays.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 14:48 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 17:22.

Southern Gas Networks logo
Between
31 Mar and 24 Apr 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 15:40.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
York Road

Southern Gas Networks are carrying out Utility repair and maintenance works on York Road, Northfleet, Gravesend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2025 at 09:12 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 12:32.

Southern Gas Networks logo
Until
24 Apr 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2025 at 08:00 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 16:38.

Southern Gas Networks logo
Between
3 and 24 Apr 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2025 at 14:28.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Springhead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springhead Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jan 2025 at 14:52.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Springhead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Springhead Road, Northfleet, Gravesend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 10:35 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 10:36.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
York Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Jan 2025 at 12:49.

Finishing
Today
Details
View Map
Share
Follow
Danson Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Danson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 31 Mar 2025 at 11:24.

Finishing
Monday
Details
View Map
Share
Follow
Danson Road

Harlaxton Energy Networks are carrying out Utility asset works on Danson Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 08:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 17 Apr 2025 at 11:42.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:44.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Cloudesley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Cloudesley Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:58.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 13:36.

Transport for London (TfL) logo
LONG TERM
Between
6 Apr and 4 Jul 2025
Details
View Map
Share
East Rochester Way

Transport for London (TfL) were proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 April 2025 and run through until 4 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 13:57.

Electricity Network Company logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
High Street

Electricity Network Company are proposing to carry out Utility asset works on High Street, Northfleet, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 7 Mar 2025 at 11:12.

Electricity Network Company logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Hive Lane

Electricity Network Company are proposing to carry out Utility asset works on Hive Lane, Northfleet, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Mar 2025 at 11:14.

Kent County Council logo
LONG TERM
Between
7 Apr and 31 May 2025
Details
View Map
Share
Follow
Priory Road South

Kent County Council are proposing to carry out Highway repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Feb 2025 at 13:09.

Southern Gas Networks logo
Between
7 Apr and 3 May 2025
Details
View Map
Share
Follow
Sun Court

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sun Court, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 10:47.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 19 May 2025
Details
View Map
Share
Follow
Lincoln Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lincoln Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 10:47.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Colyers Lane

Southern Gas Networks are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 11:26.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Colyers Lane

Southern Gas Networks were proposing to carry out Utility asset works on Colyers Lane, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:58.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Myrtle Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Myrtle Close, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:28.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Myrtle Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Myrtle Close, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 11:26.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Myrtle Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Myrtle Close, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:58.

Thurrock Council logo
Between
7 and 26 Apr 2025
Details
View Map
Share
Follow
Link Road From Lakeside Interchange Off A13 To West Thurrock Way

Thurrock Council are proposing to carry out Highway repair and maintenance works on Link Road From Lakeside Interchange Off A13 To West Thurrock Way, West Thurrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 24 Mar 2025 at 15:30.

Thurrock Council logo
Until
26 Apr 2025
Details
View Map
Share
Follow
Link Road From Lakeside Interchange Off A13 To West Thurrock Way

Thurrock Council are carrying out Highway repair and maintenance works on Link Road From Lakeside Interchange Off A13 To West Thurrock Way, West Thurrock.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 22:00 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 11 Apr 2025 at 10:26.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Pembroke Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Pembroke Road, Erith.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 17:00 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 13:07.

Murphy Gas Networks logo
Between
7 and 30 Apr 2025
Details
View Map
Share
Follow
Arisdale Avenue

Murphy Gas Networks are proposing to carry out New service connection on Arisdale Avenue, South Ockendon.

These works are categorised as Major.

The works will start on or after 7 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 13 Mar 2025 at 08:23.

Murphy Gas Networks logo
Between
7 and 30 Apr 2025
Details
View Map
Share
Follow
Arisdale Avenue

Murphy Gas Networks are proposing to carry out New service connection on Arisdale Avenue, South Ockendon.

These works are categorised as Major.

The works will start on or after 7 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 20 Mar 2025 at 15:23.

Murphy Gas Networks logo
LONG TERM
Until
20 May 2025
Details
View Map
Share
Follow
Arisdale Avenue

Murphy Gas Networks are carrying out New service connection on Arisdale Avenue, South Ockendon.

These works are categorised as Major.

The works started on 7 April 2025 at 08:00 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 17 Apr 2025 at 09:34.

Thames Water logo
LONG TERM
Between
8 Apr and 6 Sep 2025
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:02.

Finishing
Sunday
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 31 Mar 2025 at 11:26.

Finishing
Monday
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are carrying out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 07:30 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 17 Apr 2025 at 11:42.

Finishing
Sunday
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 12 Mar 2025 at 16:26.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Craylands Lane

Network Rail are carrying out Works for Rail Purposes on Craylands Lane, Swanscombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2025 at 06:00 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Apr 2025 at 08:02.

Thames Water logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 16:15.

Cadent Gas logo
Between
14 Apr and 5 May 2025
Details
View Map
Share
Follow
Silverlocke Road

Cadent Gas are proposing to carry out Utility asset works on Silverlocke Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 09:53.

Cadent Gas logo
Between
14 Apr and 5 May 2025
Details
View Map
Share
Follow
Silverlocke Road

Cadent Gas are proposing to carry out Utility asset works on Silverlocke Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:45.

Cadent Gas logo
Between
14 Apr and 5 May 2025
Details
View Map
Share
Follow
Silverlocke Road

Cadent Gas are proposing to carry out Utility asset works on Silverlocke Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 15:29.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
West Street

Thames Water were proposing to carry out Utility repair and maintenance works on West Street, Erith.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 22 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 11:33.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Stanmore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanmore Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 15:57.

Thames Water logo
Between
14 and 29 Apr 2025
Details
View Map
Share
Follow
Gladeswood Road

Thames Water are proposing to carry out Utility asset works on Gladeswood Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 10:35.

Thames Water logo
Until
30 Apr 2025
Details
View Map
Share
Follow
Gladeswood Road

Thames Water are carrying out Utility asset works on Gladeswood Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 12:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:56.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gordon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gordon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 15:57.

UK Power Networks South Eastern logo
Until
28 Apr 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks South Eastern are carrying out roadworks on Wood Street, Swanley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 19:30 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Apr 2025 at 07:18.

Thames Water logo
LONG TERM
Between
16 Apr and 30 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Apr 2025 at 18:37.

Thames Water logo
Between
16 and 24 Apr 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 15:57.

Cadent Gas logo
Until
28 Apr 2025
Details
View Map
Share
Follow
Purfleet Road

Cadent Gas are carrying out Utility repair and maintenance works on Purfleet Road, Aveley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 09:04 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:19.

Thames Water logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 16:35.

Thames Water logo
Between
17 Apr and 2 May 2025
Details
View Map
Share
Longmead Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:50.

Southern Gas Networks logo
LONG TERM
Between
17 Apr and 20 May 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 09:27.

Cadent Gas logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Clarkbourne Drive

Cadent Gas are proposing to carry out Utility asset works on Clarkbourne Drive, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:39.

Cadent Gas logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Dock Road

Cadent Gas are proposing to carry out Utility asset works on Dock Road, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 13:00.

Cadent Gas logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Dock Road

Cadent Gas are proposing to carry out Utility asset works on Dock Road, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:37.

Southern Gas Networks logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Victoria Hill Road

Southern Gas Networks are proposing to carry out New service connection on Victoria Hill Road, Hextable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 08:03.

Southern Gas Networks logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Victoria Hill Road

Southern Gas Networks are proposing to carry out New service connection on Victoria Hill Road, Hextable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 09:37.

Network Rail logo
Between
22 and 26 Apr 2025
Details
View Map
Share
Follow
Craylands Lane

Network Rail are proposing to carry out Works for Rail Purposes on Craylands Lane, Swanscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Feb 2025 at 09:06.

Cadent Gas logo
Between
22 Apr and 12 May 2025
Details
View Map
Share
Follow
Clarkbourne Drive

Cadent Gas are proposing to carry out Utility asset works on Clarkbourne Drive, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 15:39.

Thames Water logo
LONG TERM
Between
22 Apr and 30 Aug 2025
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:23.

Thurrock Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Purfleet Bypass

Thurrock Council are proposing to carry out Highway repair and maintenance works on Purfleet Bypass, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 19 Feb 2025 at 09:28.

Thurrock Council logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Purfleet Bypass

Thurrock Council are proposing to carry out Highway repair and maintenance works on Purfleet Bypass, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 8 Apr 2025 at 09:50.

Thames Water logo
LONG TERM
Between
22 Apr and 11 Jul 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:17.

Thames Water logo
LONG TERM
Between
22 Apr and 20 Jun 2025
Details
View Map
Share
Gladeswood Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:29.

Thames Water logo
LONG TERM
Between
22 Apr and 23 Jun 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:55.

Kent County Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Spring Vale

Kent County Council are proposing to carry out Remedial works on Spring Vale, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 4 Feb 2025 at 10:43.

Kent County Council logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Follow
Spring Vale

Kent County Council are proposing to carry out Remedial works on Spring Vale, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 11 Feb 2025 at 11:35.

Thames Water logo
Between
23 Apr and 7 May 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out roadworks on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 12:05.

Thurrock Council logo
Between
24 and 25 Apr 2025
Details
View Map
Share
Follow
Stonehouse Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stonehouse Lane, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 26 Feb 2025 at 09:33.

Thurrock Council logo
Between
24 and 25 Apr 2025
Details
View Map
Share
Follow
Stonehouse Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Stonehouse Lane, Purfleet-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 10 Apr 2025 at 09:58.

Thames Water logo
Between
25 and 29 Apr 2025
Details
View Map
Share
Follow
Stanmore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanmore Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 11:16.

Southern Gas Networks logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Follow
Tile Kiln Lane

Southern Gas Networks are proposing to carry out New service connection on Tile Kiln Lane, Bexley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:12.

Southern Gas Networks logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Follow
Tile Kiln Lane

Southern Gas Networks are proposing to carry out New service connection on Tile Kiln Lane, Bexley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 09:48.

Southern Gas Networks logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Follow
Tile Kiln Lane

Southern Gas Networks are proposing to carry out New service connection on Tile Kiln Lane, Bexley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 12:33.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Great Queen Street

BT are proposing to carry out Utility asset works on Great Queen Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Feb 2025 at 12:07.

BT logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Great Queen Street

BT are proposing to carry out Utility asset works on Great Queen Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Mar 2025 at 12:23.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Hamerton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Hamerton Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 5 Feb 2025 at 15:03.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Hamerton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Hamerton Road, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 Mar 2025 at 13:41.

LONG TERM
Between
28 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Thames Road

Riverside Energy Park are proposing to carry out Utility asset works on Thames Road, Crayford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Apr 2025 at 13:34.

Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crayford Way

Aurora Utilities Limited are proposing to carry out Utility asset works on Crayford Way, Crayford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 13 Mar 2025 at 12:27.

Between
28 Apr and 25 May 2025
Details
View Map
Share
Follow
South Road

Riverside Energy Park are proposing to carry out Utility asset works on South Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 27 Mar 2025 at 10:50.

Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
East Thurrock Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 5 Feb 2025 at 15:12.

Between
28 Apr and 25 May 2025
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 25 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 27 Mar 2025 at 10:49.

Thames Water logo
LONG TERM
Between
1 May and 5 Aug 2025
Details
View Map
Share
Follow
Poplar Mount

Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:12.

Thames Water logo
LONG TERM
Between
1 May and 1 Jul 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:07.

Transport for London (TfL) logo
Between
5 and 16 May 2025
Details
View Map
Share
Southwold Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Southwold Road, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 16 May 2025. The works were due to impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 14:15.

Between
5 May and 1 Jun 2025
Details
View Map
Share
Follow
Northend Road

Riverside Energy Park are proposing to carry out Utility asset works on Northend Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 17 Apr 2025 at 11:42.

Kent County Council logo
On
6 May 2025
Details
View Map
Share
Follow
School Lane

Kent County Council are proposing to carry out Highway improvement works on School Lane, Bean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 6 May 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Apr 2025 at 11:48.

Kent County Council logo
On
6 May 2025
Details
View Map
Share
Follow
School Lane

Kent County Council are proposing to carry out Highway improvement works on School Lane, Bean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 6 May 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Apr 2025 at 13:59.

Southern Gas Networks logo
LONG TERM
Between
6 May and 6 Jun 2025
Details
View Map
Share
Follow
Birling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:47.

Thames Water logo
LONG TERM
Between
6 May and 31 Oct 2025
Details
View Map
Share
Follow
Frinsted Road

Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 15:51.

Thames Water logo
Between
6 and 17 May 2025
Details
View Map
Share
Thanet Road

Thames Water were proposing to carry out roadworks on Thanet Road, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 17 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:38.

Thames Water logo
LONG TERM
Between
8 May and 18 Jul 2025
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:06.

Cadent Gas logo
Between
12 May and 4 Jun 2025
Details
View Map
Share
Follow
Clarkbourne Drive

Cadent Gas are proposing to carry out Utility asset works on Clarkbourne Drive, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 08:15.

Cadent Gas logo
Between
12 May and 2 Jun 2025
Details
View Map
Share
Follow
Dock Road

Cadent Gas are proposing to carry out Utility asset works on Dock Road, Grays.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 16:54.

Southern Gas Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are proposing to carry out New service connection on Woolwich Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 15:03.

Southern Gas Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are proposing to carry out New service connection on Woolwich Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 13:50.

Southern Gas Networks logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are proposing to carry out New service connection on Woolwich Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 11:07.

Thames Water logo
Between
14 and 16 May 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:04.

Thames Water logo
Between
14 and 16 May 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 14:31.

Thames Water logo
LONG TERM
Between
14 May and 28 Jul 2025
Details
View Map
Share
Follow
Battle Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Battle Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 13:37.

Between
16 and 25 May 2025
Details
View Map
Share
Thames Road

Aurora Utilities Limited were proposing to carry out Utility asset works on Thames Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 May 2025 and run through until 25 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 28 Mar 2025 at 09:23.

National Highways logo
Between
19 May and 6 Jun 2025
Details
View Map
Share
Follow
Hall Road

National Highways are proposing to carry out Highway improvement works on Hall Road, Southfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:36.

Thames Water logo
Between
19 May and 8 Jun 2025
Details
View Map
Share
Follow
Parkhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Parkhill Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 07:45.

Kent County Council logo
LONG TERM
Between
19 May 2025 and 19 May 2026
Details
View Map
Share
Follow
Hythe Street

Kent County Council are proposing to carry out Highway improvement works on Hythe Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Feb 2025 at 13:48.

Kent County Council logo
LONG TERM
Between
19 May 2025 and 19 May 2026
Details
View Map
Share
Follow
Spital Street

Kent County Council are proposing to carry out Highway improvement works on Spital Street, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Feb 2025 at 13:49.

Electricity Network Company logo
Between
19 May and 6 Jun 2025
Details
View Map
Share
Follow
High Street

Electricity Network Company are proposing to carry out Utility asset works on High Street, Northfleet, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Mar 2025 at 09:18.

Electricity Network Company logo
Between
19 May and 6 Jun 2025
Details
View Map
Share
Follow
Hive Lane

Electricity Network Company are proposing to carry out Utility asset works on Hive Lane, Northfleet, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 28 Mar 2025 at 09:19.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Follow
Ightham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ightham Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 14:35.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Follow
Hythe Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hythe Avenue, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Feb 2025 at 10:37.

Southern Gas Networks logo
LONG TERM
Between
23 May and 27 Jun 2025
Details
View Map
Share
Follow
Bedonwell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 16:43.

Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 12 Mar 2025 at 16:29.

Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 16 Apr 2025 at 13:30.

Between
24 May and 1 Jun 2025
Details
View Map
Share
Crook Log

Harlaxton Energy Networks were proposing to carry out Utility asset works on Crook Log, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 8 Apr 2025 at 15:55.

Between
24 May and 1 Jun 2025
Details
View Map
Share
Follow
Crook Log

Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 12 Mar 2025 at 16:29.

Kent County Council logo
Between
26 May and 8 Jun 2025
Details
View Map
Share
Follow
Jacobs Lane

Kent County Council are proposing to carry out Highway improvement works on Jacobs Lane, Horton Kirby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 Mar 2025 at 10:46.

Kent County Council logo
Between
26 May and 8 Jun 2025
Details
View Map
Share
Follow
Jacobs Lane

Kent County Council are proposing to carry out Highway improvement works on Jacobs Lane, Horton Kirby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 Mar 2025 at 11:51.

Thames Water logo
Between
26 and 28 May 2025
Details
View Map
Share
Ship Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Ship Lane, Sutton At Hone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 28 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 11:05.

Thames Water logo
Between
26 and 28 May 2025
Details
View Map
Share
Follow
Wilmot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wilmot Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 13:04.

Southern Gas Networks logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Mayplace Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayplace Avenue, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 11:28.

Southern Gas Networks logo
Between
26 May and 16 Jun 2025
Details
View Map
Share
Follow
Medway Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Medway Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 08:29.

Thames Water logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Dale Road

Thames Water are proposing to carry out Remedial works on Dale Road, Southfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 14:16.

Kent County Council logo
Until
6 Jun 2025
Details
View Map
Share
Follow
Hook Green Lane

Kent County Council are carrying out Highway improvement works on Hook Green Lane, Wilmington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 10:00.

Between
27 May and 16 Jun 2025
Details
View Map
Share
Crayford Creek Road

Aurora Utilities Limited were proposing to carry out Utility asset works on Crayford Creek Road, Crayford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 28 Mar 2025 at 09:23.

Southern Gas Networks logo
Between
27 May and 23 Jun 2025
Details
View Map
Share
Follow
Danson Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 08:54.

Southern Gas Networks logo
Between
27 May and 24 Jun 2025
Details
View Map
Share
Follow
Roseacre Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Roseacre Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:43.

London Borough Of Bexley logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
Bexley Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Bexley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:34.

Thurrock Council logo
Between
27 May and 2 Jun 2025
Details
View Map
Share
Follow
Stifford Road

Thurrock Council are proposing to carry out Highway improvement works on Stifford Road, Aveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thurrock Council on 2 Apr 2025 at 09:47.

Thames Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Ship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Ship Lane, Sutton At Hone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 10:49.

Thames Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Ship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Ship Lane, Sutton At Hone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 10:16.

Thames Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Brook Street

Thames Water were proposing to carry out Utility repair and maintenance works on Brook Street, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 09:21.

Thames Water logo
Between
28 and 30 May 2025
Details
View Map
Share
Follow
Brook Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brook Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:10.

Thames Water logo
Between
28 May and 10 Jun 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out roadworks on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 15:55.

UK Power Networks South Eastern logo
Between
31 May and 2 Jun 2025
Details
View Map
Share
Follow
Hawley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hawley Road, Wilmington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Mar 2025 at 10:27.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Longmead Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 15:04.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Priory Road South

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Road South, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 11:08.

Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
St Clements Road

GTC Pipelines are proposing to carry out Utility asset works on St Clements Road, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 17 Mar 2025 at 07:54.

Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
St Clements Road

GTC Pipelines are proposing to carry out Utility asset works on St Clements Road, Greenhithe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by GTC Pipelines on 17 Mar 2025 at 14:32.

Southern Gas Networks logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Chieveley Road

Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 12:14.

Southern Gas Networks logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Chieveley Road

Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 09:21.

London Borough Of Bexley logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Bunkers Hill

London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:37.

London Borough Of Bexley logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:32.

London Borough Of Bexley logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Halt Robin Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Mar 2025 at 12:13.

London Borough Of Bexley logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Gideon Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.

London Borough Of Bexley logo
Between
2 and 5 Jun 2025
Details
View Map
Share
Follow
Brigstock Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.

Thames Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Bullbanks Road

Thames Water are proposing to carry out Utility asset works on Bullbanks Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:21.

Southern Gas Networks logo
Between
3 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.

Kent County Council logo
Between
8 and 9 Jun 2025
Details
View Map
Share
Follow
School Lane

Kent County Council are proposing to carry out Highway improvement works on School Lane, Bean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Feb 2025 at 08:11.

Kent County Council logo
Between
8 and 9 Jun 2025
Details
View Map
Share
Follow
School Lane

Kent County Council are proposing to carry out Highway improvement works on School Lane, Bean.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Feb 2025 at 09:35.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 10:40.

Southern Gas Networks logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Dallin Road

Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:09.

Southern Gas Networks logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Sheridan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.

Southern Gas Networks logo
LONG TERM
Between
9 Jun and 14 Jul 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 15:58.

London Borough Of Bexley logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Picardy Road

London Borough Of Bexley are proposing to carry out Section 50 on Picardy Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2025 at 11:36.

Thames Water logo
LONG TERM
Between
9 Jun and 7 Aug 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:57.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Green Street Green Road

Kent County Council are proposing to carry out Highway improvement works on Green Street Green Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:54.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Princes Road

Kent County Council are proposing to carry out Highway improvement works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:54.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Oakwood Close

Kent County Council are proposing to carry out Highway improvement works on Oakwood Close, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:54.

Kent County Council logo
Between
16 and 26 Jun 2025
Details
View Map
Share
Follow
Park Road

Kent County Council are proposing to carry out Highway improvement works on Park Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 12:55.

Southern Gas Networks logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Bynon Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:47.

Thames Water logo
LONG TERM
Between
16 Jun and 5 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:16.

Kent County Council logo
Between
17 and 21 Jun 2025
Details
View Map
Share
Follow
Princes Road

Kent County Council are proposing to carry out Highway improvement works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 26 Feb 2025 at 08:04.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Wood Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Wood Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Mar 2025 at 12:39.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meadow Way

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Meadow Way, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Mar 2025 at 08:10.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Meadow Way

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Meadow Way, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Mar 2025 at 11:13.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Colyers Lane

Thames Water were proposing to carry out Utility asset works on Colyers Lane, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 17:03.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Colyers Lane

Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:13.

Thames Water logo
LONG TERM
Between
23 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Colyers Lane

Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:32.

Thames Water logo
LONG TERM
Between
23 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Methuen Road

Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:18.

Thames Water logo
LONG TERM
Between
24 Jun and 1 Sep 2025
Details
View Map
Share
Monarch Road

Thames Water were proposing to carry out Utility asset works on Monarch Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 1 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:12.

Thurrock Council logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Sandy Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Aveley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 28 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 12 Mar 2025 at 09:33.

Between
26 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Crayford Creek Road

Aurora Utilities Limited are proposing to carry out New service connection on Crayford Creek Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 26 Mar 2025 at 11:30.

Thames Water logo
LONG TERM
Between
27 Jun and 29 Sep 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.

National Highways logo
Between
28 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Watling Street

National Highways are proposing to carry out Works for road purposes on Watling Street, Stone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 Jan 2025 at 11:31.

National Highways logo
Between
28 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Watling Street

National Highways are proposing to carry out Works for road purposes on Watling Street, Stone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Jan 2025 at 15:24.

Southern Gas Networks logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 11:53.

Southern Gas Networks logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 10:38.

London Borough Of Bexley logo
LONG TERM
Between
30 Jun and 31 Dec 2025
Details
View Map
Share
Follow
Bronze Age Way

London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.

Southern Gas Networks logo
Between
1 and 21 Jul 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 11:35.

Cadent Gas logo
LONG TERM
Between
1 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Arisdale Avenue

Cadent Gas are proposing to carry out Utility asset works on Arisdale Avenue, South Ockendon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 10:19.

UK Power Networks South Eastern logo
Between
2 and 8 Jul 2025
Details
View Map
Share
Childs Crescent

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Childs Crescent, Swanscombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 July 2025 and run through until 8 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Apr 2025 at 15:33.

UK Power Networks South Eastern logo
Between
2 and 8 Jul 2025
Details
View Map
Share
Follow
Childs Crescent

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Childs Crescent, Swanscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Apr 2025 at 13:16.

Thurrock Council logo
Between
2 and 5 Jul 2025
Details
View Map
Share
Follow
Sandy Lane

Thurrock Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Aveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 2 Apr 2025 at 09:24.

Thurrock Council logo
Between
3 and 6 Jul 2025
Details
View Map
Share
Sandy Lane

Thurrock Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Aveley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 July 2025 and run through until 6 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thurrock Council on 12 Mar 2025 at 14:18.

Cornerstone Telecommunications Infrastructure logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Darenth Wood Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Darenth Wood Road, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 10 Apr 2025 at 06:16.

Cornerstone Telecommunications Infrastructure logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Princes Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Princes Road, Dartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 15 Apr 2025 at 08:02.

London Borough Of Bexley logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2025 at 14:45.

Between
11 and 20 Jul 2025
Details
View Map
Share
Follow
Thames Road

Aurora Utilities Limited are proposing to carry out New service connection on Thames Road, Crayford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Aurora Utilities Limited on 26 Mar 2025 at 12:07.

Thames Water logo
LONG TERM
Between
14 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Beltwood Road

Thames Water are proposing to carry out Utility asset works on Beltwood Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Jun 2024 at 14:17.


Roadworks Map near to Brunel Way, DARTFORD, DA1 5GA (6 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Apr 2025 12:40
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brunel Way, DARTFORD, DA1 5GA (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
JOYCE GREEN LANE 
(0.5 miles)
Riverside Energy Park
Utility asset works - Footway, Carriageway, Verge - Two-way signals
In Progress
Since: 10 Feb 2025 08:00
(Scheduled: 10 Feb 2025 - 25 May 2025)
0.5
Details
Share
Follow
2
MAJOR
  
FASTRACK THE BRIDGE 
(0.5 miles)
Riverside Energy Park
Utility asset works - Footway, Carriageway - Two-way signals
In Progress
Since: 24 Feb 2025 08:00
(Scheduled: 24 Feb 2025 - 25 May 2025)
0.5
Details
Share
Follow
3
Thames Water logo
URGENT
  
CROSSWAYS BOULEVARD 
(0.8 miles)
Thames Water
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
In Progress
Since: 8 Apr 2025 02:49
(Scheduled: 8 Apr 2025 - 23 Apr 2025)
0.8
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
RIVERSIDE WAY 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 14 Apr 2025 - 23 May 2025
0.8
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
RIVERSIDE WAY 
(0.8 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 14 Apr 2025 - 23 May 2025)
0.8
Details
Share
6
MAJOR
  
BOB DUNN WAY 
(1.0 miles)
Riverside Energy Park
Utility asset works - Footway, Carriageway, Verge - Lane closure
In Progress
Since: 27 Jan 2025 08:00
(Scheduled: 27 Jan 2025 - 25 May 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.