View current and future planned roadworks and road closures for Pitfield Drive, DA13 0AY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pitfield Drive, GRAVESEND, DA13 0AY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pitfield Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Between
30 Oct 2023 and 11 Feb 2025
Details
View Map
Share
Follow
Ascot Road

Kent County Council are proposing to carry out roadworks on Ascot Road, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2023 and could run through until 11 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 6 Oct 2023 at 10:52.

Southern Gas Networks logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Redhill Wood

Southern Gas Networks are carrying out Utility repair and maintenance works on Redhill Wood, New Ash Green.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 31 July 2024 at 09:47 and could run through until 27 December 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 15:02.

South East Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
London Road

South East Water are carrying out Utility repair and maintenance works on London Road, West Kingsdown.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:40 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 10 Dec 2024 at 12:08.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Aintree Close

Southern Water are proposing to carry out Utility repair and maintenance works on Aintree Close, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 29 Oct 2024 at 09:31.

South East Water logo
Finishing
Today
Details
View Map
Share
Old Terrys Lodge Road

South East Water were proposing to carry out New service connection on Old Terrys Lodge Road, Wrotham, Sevenoaks.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South East Water on 5 Dec 2024 at 10:27.

South East Water logo
Finishing
Today
Details
View Map
Share
Follow
Old Terrys Lodge Road

South East Water are proposing to carry out New service connection on Old Terrys Lodge Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 16 Sep 2024 at 15:08.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pear Tree Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Pear Tree Lane, Shorne, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 09:54.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Cycle Track From Wrotham Road To Wrotham Road

Southern Water were proposing to carry out Utility repair and maintenance works on Cycle Track From Wrotham Road To Wrotham Road, Gravesend.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Southern Water on 12 Sep 2024 at 11:37.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Aintree Close

Southern Water are carrying out Utility repair and maintenance works on Aintree Close, Gravesend.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 9 Dec 2024 at 09:19.

UK Power Networks South Eastern logo
Tomorrow
Details
View Map
Share
Pear Tree Lane

UK Power Networks South Eastern carried out New service connection on Pear Tree Lane, Shorne, Gravesend.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 9 Dec 2024 and 13 Dec 2024 and were actually completed between 9 Dec 2024 (08:00) and 12 Dec 2024 (14:20). The works impacted the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Dec 2024 at 15:06.

Southern Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Lynton Road South

Southern Water are carrying out Utility repair and maintenance works on Lynton Road South, Gravesend.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 09:03 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Dec 2024 at 14:17.

Southern Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lynton Road South

Southern Water are proposing to carry out Utility repair and maintenance works on Lynton Road South, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 15 Nov 2024 at 09:13.

Southern Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lynton Road South

Southern Water are proposing to carry out Utility repair and maintenance works on Lynton Road South, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 12 Sep 2024 at 10:52.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Highview

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highview, Vigo, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 09:33.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out New service connection on London Road, Wrotham, Sevenoaks.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 08:30.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 25 Apr 2025
Details
View Map
Share
Follow
London Road

UK Power Networks South Eastern are proposing to carry out New service connection on London Road, Wrotham, Sevenoaks.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 14:05.

UK Power Networks South Eastern logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wrotham Heath Roundabout

UK Power Networks South Eastern are proposing to carry out Utility asset works on Wrotham Heath Roundabout, Wrotham, Sevenoaks.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 06:51.

Southern Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Aintree Close

Southern Water are proposing to carry out Utility repair and maintenance works on Aintree Close, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 28 Oct 2024 at 13:14.

Southern Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Henley Street

Southern Water were proposing to carry out Utility repair and maintenance works on Henley Street, Luddesdown, Gravesend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Nov 2024 at 10:26.

Kent County Council logo
LONG TERM
Between
13 Jan and 9 Mar 2025
Details
View Map
Share
Follow
Station Road

Kent County Council are proposing to carry out Highway improvement works on Station Road, Southfleet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Oct 2024 at 16:28.

Southern Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Upper Bush Road

Southern Water are proposing to carry out Utility repair and maintenance works on Upper Bush Road, Cuxton, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Sep 2024 at 08:33.

Southern Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Taylors Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Taylors Lane, Trottiscliffe, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Oct 2024 at 10:07.

Southern Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Taylors Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Taylors Lane, Trottiscliffe, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Nov 2024 at 13:05.

UK Power Networks South Eastern logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Northfleet Green

UK Power Networks South Eastern are proposing to carry out New service connection on Northfleet Green, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Oct 2024 at 11:49.

UK Power Networks South Eastern logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Northfleet Green

UK Power Networks South Eastern are proposing to carry out New service connection on Northfleet Green, Northfleet, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:19.

Kent County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Knatts Lane

Kent County Council are proposing to carry out Highway repair and maintenance works on Knatts Lane, Knatts Valley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 13 Nov 2024 at 11:07.

Southern Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Old Road West

Southern Water were proposing to carry out Utility repair and maintenance works on Old Road West, Gravesend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 30 Oct 2024 at 15:04.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Malling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malling Road, Larkfield, Aylesford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:12.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Castle Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Leybourne, West Malling.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 12:15.

Southern Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Churchill Road

Southern Water are proposing to carry out Utility repair and maintenance works on Churchill Road, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 4 Nov 2024 at 11:34.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lunsford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:32.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lunsford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 07:05.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lunsford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Follow
Highview

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highview, Vigo, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 15:13.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Castle Hill

BT were proposing to carry out Utility repair and maintenance works on Castle Hill, Kent, Hartley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 13:34.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Smarts Road

Southern Water are proposing to carry out Utility repair and maintenance works on Smarts Road, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 8 Oct 2024 at 10:02.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Smarts Road

Southern Water were proposing to carry out Utility repair and maintenance works on Smarts Road, Gravesend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 7 Oct 2024 at 14:57.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Castle Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Leybourne, West Malling.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:55.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 22 Oct 2024 at 09:56.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 3 Dec 2024 at 08:06.

Trooli logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Shellbank Lane

Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 25 Nov 2024 at 07:54.

Southern Water logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Formby Road

Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 14 Oct 2024 at 08:46.

Southern Water logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Formby Road

Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Oct 2024 at 14:20.

Southern Water logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Formby Road

Southern Water are proposing to carry out Utility repair and maintenance works on Formby Road, Halling, Rochester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Oct 2024 at 12:11.

South East Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Old Terrys Lodge Road

South East Water are proposing to carry out New service connection on Old Terrys Lodge Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 5 Dec 2024 at 14:07.

South East Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Offham, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Nov 2024 at 11:05.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Malling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Malling Road, Larkfield, Aylesford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:55.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lunsford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lunsford Lane, Larkfield, Aylesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 11:56.

Southern Gas Networks logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out New service connection on Station Road, Longfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 14:59.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Old Road West

Southern Water are proposing to carry out Utility repair and maintenance works on Old Road West, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 30 Oct 2024 at 16:09.

South East Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Ryarsh Road

South East Water are proposing to carry out New service connection on Ryarsh Road, Birling, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 16 Sep 2024 at 11:11.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Park Corner Road

Thames Water were proposing to carry out Utility repair and maintenance works on Park Corner Road, Southfleet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:11.

Southern Gas Networks logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out New service connection on Station Road, Longfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 12:44.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Street

Southern Water are proposing to carry out Utility repair and maintenance works on The Street, Cobham, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 18 Sep 2024 at 12:47.

South East Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Ryarsh Road

South East Water are proposing to carry out New service connection on Ryarsh Road, Birling, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 8 Nov 2024 at 09:22.

South East Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Castle Hill

South East Water are proposing to carry out New service connection on Castle Hill, Hartley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 4 Nov 2024 at 11:02.

National Highways logo
Between
21 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Henhurst Road

National Highways are proposing to carry out Highway repair and maintenance works on Henhurst Road, Cobham, Gravesend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 13:51.

National Highways logo
Between
21 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Marling Cross Overbridge

National Highways are proposing to carry out Highway repair and maintenance works on Marling Cross Overbridge, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 13:34.

National Highways logo
Between
21 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Hever Court Road

National Highways are proposing to carry out Highway repair and maintenance works on Hever Court Road, Gravesend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 14:07.

UK Power Networks South Eastern logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Pepingstraw Close

UK Power Networks South Eastern are proposing to carry out New service connection on Pepingstraw Close, Offham, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Nov 2024 at 12:13.

Southern Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
The Street

Southern Water were proposing to carry out Utility repair and maintenance works on The Street, Cobham, Gravesend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 16 Sep 2024 at 14:15.

UK Power Networks South Eastern logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Pepingstraw Close

UK Power Networks South Eastern are proposing to carry out New service connection on Pepingstraw Close, Offham, West Malling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Nov 2024 at 10:29.

South East Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hatham Green Lane

South East Water are proposing to carry out New service connection on Hatham Green Lane, Stansted, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 3 Dec 2024 at 07:24.

Kent County Council logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hatham Green Lane

Kent County Council are proposing to carry out Section 50 on Hatham Green Lane, Stansted, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Nov 2024 at 14:45.

Southern Gas Networks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
School Lane

Southern Gas Networks are proposing to carry out New service connection on School Lane, West Kingsdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 06:36.

National Highways logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Marling Cross Overbridge

National Highways are proposing to carry out Highway repair and maintenance works on Marling Cross Overbridge, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 12:37.

Southern Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Woodhill

Southern Water are proposing to carry out Utility repair and maintenance works on Woodhill, Meopham, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 11:00.

Southern Water logo
Between
26 Feb and 28 Mar 2025
Details
View Map
Share
Woodhill

Southern Water were proposing to carry out Utility repair and maintenance works on Woodhill, Meopham, Gravesend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 10:33.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Upper Bush Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 12:06.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Upper Bush Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 08:59.

Southern Water logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Sun Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Sun Lane, Gravesend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 21 Nov 2024 at 09:51.

Southern Water logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Sun Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Sun Lane, Gravesend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:31.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Upper Bush Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 10:39.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Upper Bush Road

UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:43.

South East Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Old Terrys Lodge Road

South East Water are proposing to carry out New service connection on Old Terrys Lodge Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 5 Dec 2024 at 12:12.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Maplescombe Lane

BT are proposing to carry out Utility asset works on Maplescombe Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 10:49.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Maplescombe Lane

BT are proposing to carry out Utility asset works on Maplescombe Lane, Farningham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 08:11.

Southern Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Bush Road

Southern Water are proposing to carry out Utility repair and maintenance works on Bush Road, Cuxton, Rochester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 10:25.

Southern Gas Networks logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Churchside

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchside, Vigo, Gravesend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 10:29.


Roadworks Map near to Pitfield Drive, GRAVESEND, DA13 0AY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 12 Dec 2024 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pitfield Drive, GRAVESEND, DA13 0AY (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Kent County Council logo
WROTHAM ROAD, MEOPHAM 
(0.7 miles)
Kent County Council
Highway improvement works - Carriageway - Two-way signals
In Progress
Since:
(Scheduled: 12 Dec 2024 - 14 Dec 2024)
0.7
Details
Share
Follow
2
Kent County Council logo
EMERGENCY
  
WROTHAM ROAD, MEOPHAM 
(0.7 miles)
Kent County Council
Highway improvement works - Carriageway - Two-way signals
In Progress
Since: 12 Dec 2024 15:15
(Scheduled: 12 Dec 2024 - 14 Dec 2024)
0.7
Details
Share
Follow