ROADWORKS SUMMARY
Cobhambury Road, GRAVESEND, DA12 3BG
Introduction

View current and future planned roadworks and road closures for Cobhambury Road, DA12 3BG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Cobhambury Road, GRAVESEND, DA12 3BG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cobhambury Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
14 Apr 2024 and 16 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on Chapmans Hill, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 16 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 3 Jan 2025 at 08:05.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Queen Street, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:25.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Crooked Lane, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:24.
Sunday
Kent County Council are proposing to carry out Highway improvement works on Station Road, Southfleet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 10 Oct 2024 at 16:28.
21 Mar 2025
Kent County Council are carrying out Highway improvement works on Station Road, Southfleet.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 08:00 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 21 Feb 2025 at 12:45.
Tomorrow
UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 09:53.
Tomorrow
UK Power Networks South Eastern are proposing to carry out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 12:49.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Shepherd Street, Northfleet, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 08:07.
17 Feb and 21 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Onslow Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:31.
17 Feb and 4 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on The Hill, Northfleet, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 7 Jan 2025 at 10:03.
19 Feb and 21 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:38.
24 Feb and 21 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highview, Vigo, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 15:49.
18 Mar 2025
UK Power Networks South Eastern are carrying out New service connection on Cuxton Road, Strood, Rochester.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:00 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Feb 2025 at 09:04.
Friday
Southern Water were proposing to carry out Utility repair and maintenance works on Havelock Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 17 Oct 2024 at 10:51.
11 Apr 2025
Kent County Council are carrying out Highway improvement works on The Hill, Northfleet, Gravesend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 09:12 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 24 Feb 2025 at 09:16.
26 Feb and 28 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Woodhill, Meopham, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 March 2025. The works were due to impact the verge only.
This roadwork event was last updated by Southern Water on 20 Nov 2024 at 10:33.
Today
Kent County Council are carrying out Highway improvement works on Steep Hill, Fawkham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2025 at 11:48 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 26 Feb 2025 at 12:42.
12 Mar 2025
Southern Water are carrying out Utility repair and maintenance works on East Terrace, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 12:22 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 4 Mar 2025 at 09:02.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 08:59.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 12:06.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 10:39.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:43.
3 and 11 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Sun Lane, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 09:51.
Sunday
Southern Water are proposing to carry out Utility repair and maintenance works on Sun Lane, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:31.
Sunday
Southern Water are carrying out Utility repair and maintenance works on Sun Lane, Gravesend.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 05:45 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 3 Mar 2025 at 08:38.
3 Mar and 12 Apr 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Darnley Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 12 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 30 Oct 2024 at 13:56.
3 and 12 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Darnley Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 12 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 10:24.
3 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on East Milton Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Jan 2025 at 11:07.
Friday
UK Power Networks South Eastern are proposing to carry out Utility asset works on Castle Hill, Hartley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Feb 2025 at 11:00.
Monday
Southern Water are carrying out Utility repair and maintenance works on The Street, Cobham, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2025 at 01:28 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Mar 2025 at 10:45.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Red Street, Southfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Jan 2025 at 11:26.
10 and 17 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Petersfield Drive, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 08:41.
10 and 17 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Petersfield Drive, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 12:56.
10 and 14 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 20 Nov 2024 at 10:25.
10 and 14 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 19 Feb 2025 at 10:48.
10 and 19 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Dec 2024 at 14:48.
10 and 14 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Delce Road, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Nov 2024 at 13:14.
10 and 19 Mar 2025
Medway Council are proposing to carry out Highway improvement works on Seagull Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Medway Council on 10 Feb 2025 at 19:15.
10 and 28 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Hever Court Road, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 10 Feb 2025 at 13:02.
10 and 28 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Hever Court Road, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 14 Feb 2025 at 17:10.
10 and 12 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Feb 2025 at 15:08.
10 and 12 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Feb 2025 at 15:07.
10 and 12 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Feb 2025 at 15:09.
10 and 14 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Essex Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 08:46.
10 and 14 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Essex Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 18 Feb 2025 at 16:07.
12 and 14 Mar 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Whitehill Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 17 Dec 2024 at 10:12.
14 Mar 2025
Kent County Council are carrying out Highway improvement works on Church Road, New Ash Green.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2025 at 09:30 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 12 Feb 2025 at 12:09.
16 and 30 Mar 2025
Medway Council are proposing to carry out Highway improvement works on Corporation Street, Rochester.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 6 Feb 2025 at 14:28.
17 and 21 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Road, Upper Halling, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 25 Feb 2025 at 09:57.
17 and 21 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Road, Upper Halling, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 28 Feb 2025 at 09:08.
17 and 21 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Road, Upper Halling, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 3 Mar 2025 at 12:06.
17 and 21 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Parrock Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Dec 2024 at 14:22.
17 and 28 Mar 2025
Southern Water are proposing to carry out Highway repair and maintenance works on High Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Feb 2025 at 13:18.
18 and 24 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Hever Court Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 13 Jan 2025 at 14:38.
18 and 24 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Hever Court Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 14 Jan 2025 at 11:48.
18 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Grange Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Dec 2024 at 14:18.
18 and 21 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Grange Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Feb 2025 at 16:07.
19 and 25 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Dec 2024 at 13:39.
19 and 25 Mar 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 20 Feb 2025 at 13:14.
24 and 28 Mar 2025
Southern Water are proposing to carry out New service connection on Roach Street, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 5 Feb 2025 at 09:07.
24 and 28 Mar 2025
Southern Water are proposing to carry out New service connection on Roach Street, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 Feb 2025 at 13:40.
25 and 27 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Castle Hill, Hartley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2025 at 06:36.
25 and 27 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Castle Hill, Hartley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2025 at 12:14.
27 and 31 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Wouldham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 08:51.
27 and 29 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Wouldham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 23 Dec 2024 at 12:13.
31 Mar and 4 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Henley Street, Luddesdown, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 9 Jan 2025 at 10:51.
31 Mar and 4 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Henley Street, Luddesdown, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 14 Jan 2025 at 09:54.
31 Mar and 4 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Henley Street, Luddesdown, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 21 Feb 2025 at 13:15.
31 Mar and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nash Bank, Northfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 11:58.
31 Mar and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrotham Road, Istead Rise, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 10:51.
31 Mar and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrotham Road, Istead Rise, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 10:56.
31 Mar and 4 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bill Street Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 30 Dec 2024 at 12:31.
31 Mar and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Marina Drive, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 20 Dec 2024 at 10:08.
31 Mar and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Marina Drive, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 21 Feb 2025 at 13:10.
1 Apr and 8 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Onslow Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 15:04.
1 Apr and 8 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Onslow Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 10:42.
5 and 21 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springhead Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jan 2025 at 14:52.
5 and 21 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springhead Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 09:20.
5 and 20 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Jan 2025 at 12:49.
5 and 20 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:59.
7 and 9 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Wouldham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 17 Jan 2025 at 10:39.
7 and 11 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Jan 2025 at 13:38.
7 and 11 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jan 2025 at 11:22.
7 and 11 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Upper Bush Road, Cuxton, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Feb 2025 at 13:25.
7 and 16 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 13 Dec 2024 at 10:34.
7 and 16 Apr 2025
Southern Water were proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Feb 2025 at 10:22.
7 and 16 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on John Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Feb 2025 at 13:38.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Union Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 8 Jan 2025 at 16:03.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Union Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 25 Feb 2025 at 16:30.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Union Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 26 Feb 2025 at 14:55.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bill Street Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 13 Jan 2025 at 14:16.
7 and 11 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Bill Street Road, Strood, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 25 Feb 2025 at 14:02.
7 and 11 Apr 2025
Thames Water are proposing to carry out Remedial works on Dale Road, Southfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 08:28.
7 and 11 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Parrock Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Jan 2025 at 13:21.
7 and 11 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Parrock Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 12:18.
8 Apr and 4 Jul 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Longfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 13:39.
8 Apr and 4 Jul 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on New Barn Road, Southfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Jan 2025 at 13:39.
9 and 24 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Rochester Road, Burham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 15 Jan 2025 at 15:25.
12 and 19 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Rochester Road, Burham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2025 and could run through until 19 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 12 Feb 2025 at 13:18.
14 Apr and 5 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchside, Vigo, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 15:57.
14 and 29 Apr 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Rochester Road, Burham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 16 Jan 2025 at 11:33.
14 and 16 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on Chapmans Hill, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 7 Jan 2025 at 12:43.
14 and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Manor Lane, Hartley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Jan 2025 at 13:43.
14 Apr and 2 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nash Bank, Northfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 10:57.
14 Apr and 2 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrotham Road, Istead Rise, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Jan 2025 at 09:28.
14 Apr and 11 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Coldharbour Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 11 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Jan 2025 at 10:51.
14 Apr and 11 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Coldharbour Road, Northfleet, Gravesend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 11 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Jan 2025 at 11:00.
14 Apr and 11 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on New House Lane, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Jan 2025 at 10:53.
14 Apr and 11 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on New House Lane, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Jan 2025 at 10:56.
14 and 22 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on Wrotham Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 12:22.
16 and 25 Apr 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Snodland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 08:28.
16 and 25 Apr 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on High Street, Snodland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 10:36.
16 and 18 Apr 2025
Trooli are proposing to carry out Utility asset works on Lower Rochester Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Trooli on 20 Jan 2025 at 09:18.
17 Apr and 21 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Coldharbour Road, Northfleet, Gravesend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Feb 2025 at 14:45.
17 Apr and 21 May 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on New House Lane, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Feb 2025 at 12:49.
21 Apr and 18 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Road East, Gravesend.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 08:28.
28 Apr and 2 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Cazeneuve Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 30 Jan 2025 at 17:17.
28 Apr and 2 May 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Northfleet Green, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Jan 2025 at 09:32.
28 Apr and 2 May 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Northfleet Green, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Feb 2025 at 14:41.
28 Apr and 2 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Windmill Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Feb 2025 at 15:23.
1 and 3 May 2025
Medway Council are proposing to carry out Utility asset works on Star Hill, Rochester.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 3 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Medway Council on 26 Feb 2025 at 09:35.
5 and 17 May 2025
National Highways are proposing to carry out Highway improvement works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:48.
6 and 9 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Newlands Lane, Culverstone, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 20 Feb 2025 at 10:59.
9 and 12 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Lord Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 16 Dec 2024 at 10:27.
12 and 21 May 2025
Southern Gas Networks are proposing to carry out New service connection on Oak Farm Lane, Fairseat.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 21 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 06:33.
12 and 16 May 2025
Southern Gas Networks are proposing to carry out New service connection on Oak Farm Lane, Fairseat.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 14:05.
12 and 16 May 2025
Southern Gas Networks are proposing to carry out New service connection on Oak Farm Lane, Fairseat.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 12:41.
12 and 16 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 3 Mar 2025 at 12:08.
13 and 16 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Warden Road, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Jan 2025 at 12:27.
19 and 21 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Pilgrims Road, Upper Halling, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Feb 2025 at 13:22.
19 and 21 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Pilgrims Road, Upper Halling, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Feb 2025 at 12:17.
19 and 21 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Pilgrims Road, Upper Halling, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Feb 2025 at 09:24.
19 and 23 May 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Longfield Avenue, Longfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Feb 2025 at 09:15.
19 May and 5 Jun 2025
National Highways are proposing to carry out Highway improvement works on Three Crutches Slip Eastbound, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 11:06.
19 May and 6 Jun 2025
National Highways are proposing to carry out Highway improvement works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:53.
19 May and 5 Jun 2025
National Highways are proposing to carry out Highway improvement works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 13 Feb 2025 at 14:21.
19 May and 6 Jun 2025
National Highways are proposing to carry out Highway improvement works on Hall Road, Southfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 10:36.
19 and 23 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Feb 2025 at 11:34.
19 and 21 May 2025
Southern Water are proposing to carry out New service connection on Cobham Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 24 Feb 2025 at 13:22.
21 and 23 May 2025
Trooli were proposing to carry out Utility asset works on Whitepost Lane, Culverstone, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Trooli on 3 Mar 2025 at 10:47.
21 and 23 May 2025
Kent County Council are proposing to carry out Highway repair and maintenance works on Darnley Lodge Lane, Cobham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 19 Feb 2025 at 09:15.
22 May and 23 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on East Milton Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Feb 2025 at 15:00.
22 May and 23 Jun 2025
Network Rail are proposing to carry out roadworks on Harmer Street, Gravesend.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 26 Feb 2025 at 15:45.
26 May and 6 Jun 2025
Kent County Council are proposing to carry out Highway improvement works on Harvel Road, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 25 Oct 2024 at 11:10.
26 May and 6 Jun 2025
Kent County Council are proposing to carry out Highway improvement works on White Horse Road, Harvel, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 5 Nov 2024 at 11:56.
26 May and 6 Jun 2025
Kent County Council are proposing to carry out Highway improvement works on Harvel Lane, Meopham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 19 Nov 2024 at 11:51.
27 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Cazeneuve Street, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Feb 2025 at 09:14.
27 and 30 May 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Kitchener Avenue, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 27 Feb 2025 at 14:09.
29 May and 5 Jun 2025
Kent County Council are proposing to carry out Highway improvement works on White Horse Road, Harvel, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 25 Feb 2025 at 08:48.
Roadworks Map near to Cobhambury Road, GRAVESEND, DA12 3BG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Cobhambury Road, GRAVESEND, DA12 3BG (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Mar 2025 - 10 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.