ROADWORKS SUMMARY
Milton Road, GRAVESEND, DA12 2RQ
Introduction
View current and future planned roadworks and road closures for Milton Road, DA12 2RQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Milton Road, GRAVESEND, DA12 2RQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Milton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Oct 2023 and 11 Feb 2025
Kent County Council are proposing to carry out roadworks on Ascot Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2023 and could run through until 11 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 6 Oct 2023 at 10:52.
13 Jan 2024 and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2024 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:33.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Queen Street, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:25.
15 Jul 2024 and 15 Jul 2025
Kent County Council are proposing to carry out roadworks on Crooked Lane, Gravesend.
These works are categorised as Major.
The works will start on or after 15 July 2024 and could run through until 15 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 16 Jul 2024 at 10:24.
29 Nov 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Knockhall Road, Greenhithe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2024 at 16:45 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:20.
9 Sep 2024 and 25 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on College Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 30 Jul 2024 at 14:48.
9 Sep 2024 and 25 Apr 2025
Kent County Council are proposing to carry out Highway improvement works on College Road, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 4 Sep 2024 at 08:17.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Singlewell Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 9 May 2024 at 08:10.
22 Sep and 30 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 21 Mar 2023 at 16:56.
27 Sep 2024 and 31 Mar 2026
Kent County Council are proposing to carry out Highway repair and maintenance works on Galley Hill Road, Swanscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 31 March 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 14:51.
31 Mar 2026
Kent County Council are carrying out Highway repair and maintenance works on Galley Hill Road, Swanscombe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 00:01 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 15:25.
14 Oct 2024 and 14 Feb 2025
Thurrock Council were proposing to carry out Highway improvement works on Marshfoot Road, Chadwell St Mary.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 29 Aug 2024 at 10:49.
14 Oct 2024 and 14 Feb 2025
Thurrock Council were proposing to carry out Highway improvement works on Marshfoot Road, Grays.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 29 Aug 2024 at 10:21.
14 Oct 2024 and 14 Feb 2025
Thurrock Council are proposing to carry out Highway improvement works on A1089 J A126 Leave S, Thurrock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 14 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thurrock Council on 3 Jul 2024 at 16:00.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Singlewell Road, Gravesend.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:42.
Today
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Darnley Road, Gravesend.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Sep 2024 at 16:35.
6 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Alkerden Lane, Swanscombe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:32.
6 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Gilbert Close, Swanscombe.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:29.
Wednesday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Ordnance Road, Gravesend.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 12:03 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 07:59.
Wednesday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Albion Terrace, Gravesend.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 09:37 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 07:59.
Wednesday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Canal Road, Gravesend.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 12:48 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 08:00.
1 Dec 2024
Kent County Council are carrying out Highway improvement works on Queens Farm Road, Shorne, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 November 2024 at 00:00 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 6 Nov 2024 at 10:22.
Wednesday
National Highways were proposing to carry out Remedial works on Bean Road, Bluewater, Greenhithe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 15:58.
11 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Newton Road, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 10:14.
11 Dec 2024
Cadent Gas are carrying out Utility asset works on Newton Road, Tilbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:41.
11 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Newton Road, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:22.
2 Dec 2024
Cadent Gas are carrying out Utility asset works on Foxton Road, South Stifford, Grays.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 08:22 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:40.
11 Nov 2024 and 14 Mar 2025
Thurrock Council are proposing to carry out Highway improvement works on Marshfoot Road, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 09:31.
14 Mar 2025
Thurrock Council are carrying out Highway improvement works on Marshfoot Road, Chadwell St Mary.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Nov 2024 at 08:38.
11 Nov 2024 and 14 Mar 2025
Thurrock Council are proposing to carry out Highway improvement works on Marshfoot Road, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 09:30.
14 Mar 2025
Thurrock Council are carrying out Highway improvement works on Marshfoot Road, Grays.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Nov 2024 at 08:37.
11 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on St Peters Road, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:54.
10 Dec 2024
Cadent Gas are carrying out Utility asset works on St Peters Road, Chadwell St Mary.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:26 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:05.
15 Dec 2024
Cadent Gas are carrying out Utility asset works on Courtney Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:43 and could run through until 15 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:03.
11 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Courtney Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jul 2024 at 10:50.
11 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Courtney Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 12:08.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:23.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:10.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:16.
11 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:20.
11 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:33.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:19.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:23.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:59.
Monday
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:38.
11 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:35.
11 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:33.
11 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Goddard Road, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:38.
30 Nov 2024
National Highways are carrying out Highway repair and maintenance works on Wainscott Northern Bypass, Higham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 20:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 11:44.
Today
Southern Water are proposing to carry out Utility repair and maintenance works on Cobham Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 15 Aug 2024 at 09:48.
Southern Water carried out Utility repair and maintenance works on Cobham Street, Gravesend.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 18 Nov 2024 and 22 Nov 2024 and were actually completed between 18 Nov 2024 (05:55) and 22 Nov 2024 (07:00). The works impacted the footway and carriageway.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 07:46.
18 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jul 2024 at 10:47.
18 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:40.
18 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:38.
18 Nov and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brentwood Road, Chadwell St Mary.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 08:58.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Chestnut Avenue, Grays.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 12:21 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:47.
27 Dec 2024
Cadent Gas are carrying out Utility asset works on Goddard Road, Stifford Clays, Grays.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 08:38 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:39.
Tuesday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Queen Mary Avenue, East Tilbury.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 15:04 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 13:52.
Kent County Council carried out Highway improvement works on Bean Road, Greenhithe.
The road was closed for some or all of the period.
The works were originally planned between 21 Nov 2024 and 22 Nov 2024 and were actually completed between 21 Nov 2024 (22:00) and 22 Nov 2024 (01:55). The works impacted the carriageway only.
This roadwork event was last updated by Kent County Council on 22 Nov 2024 at 11:17.
29 Nov 2024
Southern Water are carrying out Utility repair and maintenance works on The Shore, Northfleet, Gravesend.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 19:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 08:56.
BT carried out Utility asset works on Russel Road, Thurrock, Grays.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 22 Nov 2024 and 25 Nov 2024 and were actually completed on 22 Nov 2024 between 09:40 and 13:46. The works impacted the verge only.
This roadwork event was last updated by BT on 22 Nov 2024 at 14:11.
23 Nov and 1 Dec 2024
National Highways are proposing to carry out Highway improvement works on Watling Street, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Oct 2024 at 13:26.
25 and 29 Nov 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 21 Aug 2024 at 12:49.
25 and 29 Nov 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Hermitage Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Southern Water on 21 Oct 2024 at 10:35.
25 and 29 Nov 2024
BT were proposing to carry out Utility asset works on School Lane, Bean.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Sep 2024 at 16:00.
6 Dec 2024
Kent County Council are carrying out Highway improvement works on Hartshill Road, Northfleet, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 15 Nov 2024 at 08:30.
Tuesday
Kent County Council are carrying out Highway improvement works on Vale Road, Northfleet, Gravesend.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:30 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 08:16.
25 and 29 Nov 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Milton Street, Swanscombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 14:43.
25 Nov and 20 Dec 2024
Thurrock Council are proposing to carry out Highway improvement works on Burnley Road, West Thurrock.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 5 Nov 2024 at 15:31.
25 Nov and 20 Dec 2024
Thurrock Council are proposing to carry out Highway improvement works on Burnley Road, West Thurrock.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 19 Nov 2024 at 10:16.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on St Marys Road, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:57.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on St Marys Road, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 07:18.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on St Marys Road, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:40.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on The Griffins, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:21.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on The Griffins, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:36.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on The Griffins, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:52.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bodell Close, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:22.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bodell Close, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:35.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bodell Close, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:20.
25 and 30 Nov 2024
National Highways are proposing to carry out Highway repair and maintenance works on Stanford Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 11:18.
27 and 30 Nov 2024
National Highways are proposing to carry out Highway improvement works on Bean Road, Bluewater, Greenhithe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Nov 2024 at 10:59.
2 and 6 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Whitehill Lane, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 9 Aug 2024 at 15:47.
2 and 6 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Whitehill Lane, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 29 Oct 2024 at 09:04.
2 and 6 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Arnold Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 3 Sep 2024 at 09:16.
2 and 6 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Arnold Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 29 Oct 2024 at 08:59.
2 and 4 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Whitehill Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 12 Sep 2024 at 10:24.
2 and 4 Dec 2024
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Whitehill Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 Sep 2024 at 11:52.
2 and 6 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Milton Street, Swanscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Sep 2024 at 08:39.
3 and 5 Dec 2024
BT are proposing to carry out Utility asset works on Sandy Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Sep 2024 at 09:23.
3 and 5 Dec 2024
BT are proposing to carry out Utility asset works on Sandy Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Nov 2024 at 11:40.
3 and 5 Dec 2024
BT are proposing to carry out Utility asset works on Sandy Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Nov 2024 at 08:28.
4 and 6 Dec 2024
Essex And Suffolk Water were proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2024 at 13:44.
4 and 6 Dec 2024
Essex And Suffolk Water were proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2024 at 13:48.
4 and 6 Dec 2024
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 12 Sep 2024 at 13:24.
6 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Long Lane, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 08:57.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Pear Tree Lane, Shorne, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 09:54.
9 and 13 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Cycle Track From Wrotham Road To Wrotham Road, Gravesend.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and cycleway.
This roadwork event was last updated by Southern Water on 12 Sep 2024 at 11:37.
9 and 13 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Aintree Close, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 29 Oct 2024 at 09:31.
9 and 13 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Aintree Close, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 19 Nov 2024 at 14:22.
9 and 11 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Whitehill Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 13:38.
9 and 11 Dec 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Waltons Hall Road, Linford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Sep 2024 at 09:44.
9 and 11 Dec 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Waltons Hall Road, Linford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 14 Nov 2024 at 09:11.
10 and 12 Dec 2024
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on East Thurrock Road, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 15:54.
11 and 13 Dec 2024
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Prospect Place, Grays.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 2 Oct 2024 at 10:08.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Lynton Road South, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 12 Sep 2024 at 10:52.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Lynton Road South, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 15 Nov 2024 at 09:13.
16 and 20 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Wellington Street, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 5 Sep 2024 at 15:19.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 10 Sep 2024 at 08:57.
16 and 20 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Wellington Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 15 Nov 2024 at 09:15.
16 and 21 Dec 2024
BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Sep 2024 at 09:57.
16 and 21 Dec 2024
BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Sep 2024 at 09:19.
1 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 12:41.
2 and 6 Jan 2025
Southern Gas Networks are proposing to carry out Remedial works on Eynsford Road, Greenhithe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 07:40.
2 and 4 Jan 2025
Southern Gas Networks are proposing to carry out Remedial works on Eynsford Road, Greenhithe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:33.
6 and 10 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Telegraph Hill, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 7 Oct 2024 at 15:40.
6 and 10 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Aintree Close, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 28 Oct 2024 at 13:14.
6 and 17 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 16 Aug 2024 at 09:30.
6 Jan and 25 Apr 2025
Thurrock Council were proposing to carry out Highway improvement works on London Road, West Thurrock.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 20 Aug 2024 at 11:35.
6 Jan and 25 Apr 2025
Thurrock Council are proposing to carry out Highway improvement works on London Road, West Thurrock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 13 Feb 2024 at 10:27.
6 Jan and 28 Feb 2025
Thurrock Council are proposing to carry out Highway improvement works on London Road, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 13 Sep 2024 at 12:00.
6 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Felicia Way, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:18.
6 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Felicia Way, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:38.
6 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Felicia Way, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:20.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:31.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 07:40.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fieldway, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:20.
7 Jan and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chadwell Road, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jun 2023 at 07:31.
9 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springhead Road, Northfleet, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 08:05.
9 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Northfleet, Gravesend.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 08:06.
13 and 15 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Henley Street, Luddesdown, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 14 Oct 2024 at 11:30.
13 Jan and 9 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Station Road, Southfleet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 10 Oct 2024 at 16:28.
13 Jan and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 19 Aug 2024 at 15:28.
13 Jan and 10 Oct 2025
Thurrock Council were proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 11 Sep 2024 at 14:01.
13 Jan and 10 Oct 2025
Thurrock Council are proposing to carry out Highway improvement works on Civic Square, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 18 Sep 2024 at 09:14.
13 Jan and 10 Oct 2025
Thurrock Council are proposing to carry out Highway improvement works on Calcutta Road, Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 23 Oct 2024 at 10:25.
13 and 18 Jan 2025
BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Oct 2024 at 09:42.
13 and 18 Jan 2025
BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Oct 2024 at 11:20.
13 and 18 Jan 2025
BT are proposing to carry out Utility asset works on London Road, South Stifford, Grays.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Oct 2024 at 11:41.
13 and 18 Jan 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Stanford Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:15.
13 and 18 Jan 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Stanford Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 13:51.
15 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Northfleet Green, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 14:19.
15 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Northfleet Green, Northfleet, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Oct 2024 at 11:49.
18 Jan and 7 Mar 2025
Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 8 Oct 2024 at 14:58.
18 Jan and 7 Mar 2025
Thurrock Council were proposing to carry out Highway improvement works on London Road, Grays.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 14 Nov 2024 at 13:24.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Churchill Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 4 Nov 2024 at 11:34.
20 and 24 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Old Road West, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 30 Oct 2024 at 15:04.
20 Jan and 24 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Cutmore Street, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 23 Sep 2024 at 10:50.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Cutmore Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 23 Sep 2024 at 14:45.
20 Jan and 18 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Thorley Road, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:15.
20 Jan and 18 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Thorley Road, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:16.
27 Jan and 7 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Crutches Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 31 Oct 2024 at 14:22.
27 Jan and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Crutches Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 15:39.
27 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Gravesend Road, Higham, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 08:47.
27 Jan and 2 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Gravesend Road, Higham, Rochester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 10:46.
27 Jan and 2 Feb 2025
Southern Gas Networks were proposing to carry out New service connection on Gravesend Road, Higham, Rochester.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 2 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 11:50.
27 and 29 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Gore Green Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 6 Nov 2024 at 12:45.
27 and 31 Jan 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Waterton Avenue, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 11 Nov 2024 at 11:38.
28 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Milton Street, Swanscombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:28.
3 and 5 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Castle Hill, Kent, Hartley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Nov 2024 at 13:34.
3 and 7 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Smarts Road, Gravesend.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 7 Oct 2024 at 14:57.
3 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Smarts Road, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 8 Oct 2024 at 10:02.
3 and 7 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Queen Street, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 13 Nov 2024 at 10:05.
3 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Aluric Close, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:22.
3 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Aluric Close, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:39.
3 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Aluric Close, Chadwell St Mary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 08:13.
3 and 6 Feb 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Arterial Road, North Stifford, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:45.
3 and 6 Feb 2025
Thurrock Council are proposing to carry out Highway repair and maintenance works on Link From A1012 Roundabout To A1306 Interchange, North Stifford, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:35.
3 Feb and 10 Apr 2025
Thurrock Council are proposing to carry out Highway improvement works on Stifford Roundabout, North Stifford, Grays.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thurrock Council on 16 Oct 2024 at 09:46.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fairfield Avenue, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:00.
10 and 12 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:23.
10 and 14 Feb 2025
Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Trooli on 22 Oct 2024 at 09:56.
10 and 14 Feb 2025
Trooli are proposing to carry out Utility asset works on Shellbank Lane, Darenth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Trooli on 22 Oct 2024 at 10:43.
10 and 14 Feb 2025
Trooli are proposing to carry out Utility asset works on Shellbank Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Trooli on 22 Oct 2024 at 09:55.
10 and 14 Feb 2025
Trooli are proposing to carry out Utility asset works on Shellbank Lane, Bean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Trooli on 23 Oct 2024 at 09:13.
10 Feb and 11 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ashley Gardens, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:30.
10 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 11:03.
10 and 14 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Gourney Grove, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 11:16.
17 and 19 Feb 2025
South East Water are proposing to carry out New service connection on Castle Hill, Hartley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 4 Nov 2024 at 11:02.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on The Street, Cobham, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 18 Sep 2024 at 12:47.
17 and 26 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Station Road, Longfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 12:44.
17 and 22 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Station Road, Longfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 14:59.
17 and 21 Feb 2025
Kent County Council are proposing to carry out Highway improvement works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 21 Nov 2024 at 09:50.
17 and 21 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Park Corner Road, Southfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:11.
17 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Old Road West, Gravesend.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Water on 30 Oct 2024 at 16:09.
17 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Station Road, Thurrock, East Tilbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 13 Nov 2024 at 14:13.
17 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:30.
17 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:58.
17 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harty Close, Stifford Clays, Grays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 14:32.
17 Feb and 29 Mar 2025
Thurrock Council are proposing to carry out Highway improvement works on Brentwood Road, Chadwell St Mary.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 20 Nov 2024 at 09:18.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Forge Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
19 Feb and 21 Mar 2025
Southern Water were proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:38.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Villa Road, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
19 and 21 Feb 2025
Southern Water were proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 10:37.
19 and 21 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on School Lane, Higham, Rochester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 Nov 2024 at 11:14.
Roadworks Map near to Milton Road, GRAVESEND, DA12 2RQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Milton Road, GRAVESEND, DA12 2RQ (42 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 30 Nov 2024)
(Scheduled: 18 Nov 2024 - 25 Nov 2024)
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
(Scheduled: 8 Nov 2024 - 27 Nov 2024)
(Scheduled: 18 Nov 2024 - 30 Nov 2024)
(Scheduled: 8 Nov 2024 - 27 Nov 2024)
(Scheduled: 8 Nov 2024 - 27 Nov 2024)
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
(Scheduled: 18 Nov 2024 - 25 Nov 2024)