ROADWORKS SUMMARY
Smith Street, ATHERSTONE, CV9 2QP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Smith Street, CV9 2QP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Smith Street, ATHERSTONE, CV9 2QP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Smith Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (East Midlands) logo
LONG TERM
Between
2 Sep 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Link Footway From Moor Lane Strteching 780m

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Link Footway From Moor Lane Strteching 780m, Tamworth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 September 2024 and could run through until 17 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Apr 2024 at 09:01.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fossdale Road

Staffordshire County Council are carrying out Highway improvement works on Fossdale Road, Tamworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:31 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:38.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Reindeer Road

Staffordshire County Council are proposing to carry out Highway improvement works on Reindeer Road, Fazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:57.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Sambar Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sambar Road, Fazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:57.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brookside Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brookside Road, Fazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:58.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Deer Park Road

Staffordshire County Council are proposing to carry out Highway improvement works on Deer Park Road, Fazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 11:11.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
French Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on French Avenue, Mile Oak.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 11:11.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Felspar Road

Staffordshire County Council are proposing to carry out Highway improvement works on Felspar Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Neville Street

Staffordshire County Council are proposing to carry out Highway improvement works on Neville Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 15:14.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Georges Way

Staffordshire County Council are proposing to carry out Highway improvement works on St Georges Way, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 16:04.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bridgewater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgewater Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Apollo

Staffordshire County Council are proposing to carry out Highway improvement works on Apollo, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 14:38.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Apollo

Staffordshire County Council are carrying out Highway improvement works on Apollo, Tamworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:53 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:09.

Staffordshire County Council logo
Between
3 and 13 Dec 2024
Details
View Map
Share
Follow
Upper Gungate

Staffordshire County Council are proposing to carry out Highway improvement works on Upper Gungate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:54.

Severn Trent Water logo
Finishing
Monday
Details
View Map
Share
Follow
The Shortwoods

Severn Trent Water are carrying out Utility repair and maintenance works on The Shortwoods, Dordon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 09:27 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 09:27.

Western Power Distribution (West Midlands) logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Follow
Kingsbury Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Kingsbury Road, Curdworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Sep 2024 at 10:41.

Warwickshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bodymoor Heath Lane

Warwickshire County Council are proposing to carry out roadworks on Bodymoor Heath Lane, Kingsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 12:10.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Rush Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Rush Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Rush Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Rush Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sefton Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:29.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sefton Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Gorsy Bank Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gorsy Bank Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:16.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Gorsy Bank Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gorsy Bank Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cadogan Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cadogan Road, Dosthill, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:29.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cadogan Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cadogan Road, Dosthill, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Cadogan Road

Staffordshire County Council were proposing to carry out Highway improvement works on Cadogan Road, Dosthill, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 17:20.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hockley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Hockley Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:04.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hockley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Hockley Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hedging Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hedging Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hedging Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hedging Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Goldcrest

Staffordshire County Council are proposing to carry out Highway improvement works on Goldcrest, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Goldcrest

Staffordshire County Council were proposing to carry out Highway improvement works on Goldcrest, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Nov 2024 at 15:14.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Manta Road

Staffordshire County Council are proposing to carry out Highway improvement works on Manta Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Manta Road

Staffordshire County Council are proposing to carry out Highway improvement works on Manta Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Brent

Staffordshire County Council are proposing to carry out Highway improvement works on Brent, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:29.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Brent

Staffordshire County Council are proposing to carry out Highway improvement works on Brent, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Belgrave, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 14:51.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fossdale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fossdale Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Glascote Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 16:17.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay

Staffordshire County Council are proposing to carry out Highway improvement works on Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:16.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay

Staffordshire County Council are proposing to carry out Highway improvement works on Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Willowbank

Staffordshire County Council were proposing to carry out Highway improvement works on Willowbank, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 16:54.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Collett

Staffordshire County Council were proposing to carry out Highway improvement works on Collett, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 18:56.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Felspar Road

Staffordshire County Council are proposing to carry out Highway improvement works on Felspar Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
St Georges Way

Staffordshire County Council are proposing to carry out Highway improvement works on St Georges Way, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Market Street

Staffordshire County Council are proposing to carry out Highway improvement works on Market Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the verge only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:58.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Church Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:53.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bridgewater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgewater Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:01.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Cadent Gas logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Hoggrills End Lane

Cadent Gas are proposing to carry out New service connection on Hoggrills End Lane, Nether Whitacre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 17:42.

Cadent Gas logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Hoggrills End Lane

Cadent Gas are proposing to carry out New service connection on Hoggrills End Lane, Nether Whitacre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:12.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Hipsley Lane

Severn Trent Water were proposing to carry out New service connection on Hipsley Lane, Kingsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2024 at 15:19.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Tamworth Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tamworth Road, Dosthill, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Sep 2024 at 14:42.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Tamworth Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tamworth Road, Dosthill, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 09:03.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Dosthill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Dosthill Road, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Sep 2024 at 14:42.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Dosthill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Dosthill Road, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 09:03.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Belsize

Staffordshire County Council are proposing to carry out Highway improvement works on Belsize, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Belsize

Staffordshire County Council are proposing to carry out Highway improvement works on Belsize, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dumolos Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dumolos Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dumolos Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dumolos Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Kettlebrook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kettlebrook Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Kettlebrook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kettlebrook Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Orton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 23 Sep 2024 at 17:26.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
John Street

Staffordshire County Council are proposing to carry out Highway improvement works on John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
John Street

Staffordshire County Council are proposing to carry out Highway improvement works on John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Street

Staffordshire County Council are proposing to carry out Highway improvement works on Church Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Street

Staffordshire County Council are proposing to carry out Highway improvement works on Church Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wardle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Wardle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wardle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Wardle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Halford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Halford Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Halford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Halford Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Spinning School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Spinning School Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Spinning School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Spinning School Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 08:23.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Masefield Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Masefield Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Masefield Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Masefield Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Thackeray Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Thackeray Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 10:40.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Borough Road

Staffordshire County Council are proposing to carry out Highway improvement works on Borough Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:54.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Borough Road

Staffordshire County Council are proposing to carry out Highway improvement works on Borough Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Chestnut Avenue, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:54.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Chestnut Avenue, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Cadent Gas logo
Between
17 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Cadogan Road

Cadent Gas are proposing to carry out Utility asset works on Cadogan Road, Dosthill, Tamworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:55.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Shawbury Lane

BT are proposing to carry out Utility asset works on Shawbury Lane, Shustoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 16 Sep 2024 at 13:25.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Shawbury Lane

BT are proposing to carry out Utility asset works on Shawbury Lane, Shustoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Oct 2024 at 11:22.

Severn Trent Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Hipsley Lane

Severn Trent Water are proposing to carry out New service connection on Hipsley Lane, Kingsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 18:02.

Severn Trent Water logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Foul End Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Foul End Lane, Kingsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 10:00.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Leyland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leyland Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:40.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Portleys Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Portleys Lane, Drayton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 13:20.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Forties

Staffordshire County Council are proposing to carry out Highway improvement works on Forties, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 10:01.

South Staffordshire Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Oct 2024 at 09:22.

South Staffordshire Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 22 Oct 2024 at 12:01.

Warwickshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
The Green

Warwickshire County Council are proposing to carry out Highway improvement works on The Green, Shustoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Oct 2024 at 08:58.

Warwickshire County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
The Green

Warwickshire County Council are proposing to carry out Highway improvement works on The Green, Shustoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 1 Nov 2024 at 13:05.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Belgrave, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 14:50.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brook End

Staffordshire County Council are proposing to carry out Highway improvement works on Brook End, Fazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:35.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Stonydelph, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 15:59.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Neville Street

Staffordshire County Council are proposing to carry out Highway improvement works on Neville Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 16:25.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Argyle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Argyle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:41.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rene Road

Staffordshire County Council are proposing to carry out Highway improvement works on Rene Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:41.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Florendine Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florendine Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:28.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:49.

Warwickshire County Council logo
LONG TERM
Between
20 Jan 2025 and 22 Jan 2026
Details
View Map
Share
Glenville Avenue

Warwickshire County Council were proposing to carry out Highway improvement works on Glenville Avenue, Wood End, Kingsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 14 Oct 2024 at 13:30.

Warwickshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Glenville Avenue

Warwickshire County Council are proposing to carry out Highway improvement works on Glenville Avenue, Wood End, Kingsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Oct 2024 at 09:05.

Warwickshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Glenville Avenue

Warwickshire County Council are proposing to carry out Highway improvement works on Glenville Avenue, Wood End, Kingsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Nov 2024 at 11:02.

Staffordshire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Lichfield Street

Staffordshire County Council are proposing to carry out Highway improvement works on Lichfield Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 16:10.

Staffordshire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Lichfield Street

Staffordshire County Council are proposing to carry out Highway improvement works on Lichfield Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 10:56.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Orton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 16:35.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Orton Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 10:27.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
New Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on New Street, Baddesley Ensor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:52.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Dordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Oct 2024 at 09:03.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Dordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 3 Dec 2024 at 16:30.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Oct 2024 at 09:01.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 1 Nov 2024 at 13:07.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mariner

Staffordshire County Council are proposing to carry out Highway improvement works on Mariner, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

BT logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Watery Lane

BT were proposing to carry out Utility asset works on Watery Lane, Shustoke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 21 Nov 2024 at 14:43.

Virgin Media logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Orton Road

Virgin Media are proposing to carry out Remedial works on Orton Road, Warton, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Virgin Media on 30 Oct 2024 at 14:33.

Western Power Distribution (East Midlands) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Riley

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Riley, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 10:47.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Glascote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 15:13.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Dordon Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Dordon Road, Dordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 08:44.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Church Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:57.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
St John Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on St John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:59.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Corporation Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Corporation Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:17.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Orchard Street

Staffordshire County Council are proposing to carry out Highway improvement works on Orchard Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 12:48.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Lower Gungate

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Lower Gungate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:01.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Hospital Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Hospital Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:05.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Albert Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Albert Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:50.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Upper Gungate

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Gungate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:12.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Aldergate

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Aldergate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:47.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Offa Drive

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Offa Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:06.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Salters Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:08.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Croft Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Croft Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 12:10.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Drayton Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Drayton Lane, Drayton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:30.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Potters Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Potters Lane, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Nov 2024 at 11:59.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Glascote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:52.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Orchard Street

Staffordshire County Council were proposing to carry out Highway improvement works on Orchard Street, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 15:38.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mariner

Staffordshire County Council are proposing to carry out Highway improvement works on Mariner, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:48.

Leicestershire County Council logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Pinwall Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Pinwall Lane, Sheepy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 11:37.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Dordon Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Dordon Road, Dordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 11:17.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Florendine Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florendine Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Orchard Street

Staffordshire County Council are proposing to carry out Highway improvement works on Orchard Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 10:55.

Severn Trent Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
The Gullet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Gullet, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 18:36.

Staffordshire County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Amington, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 16:59.

Staffordshire County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Amington, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 16:59.

Severn Trent Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Coleshill Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coleshill Road, Atherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 13:12.

Western Power Distribution (East Midlands) logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tamworth Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tamworth Road, Dosthill, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 15:55.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Forties

Staffordshire County Council are proposing to carry out Highway improvement works on Forties, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 08:35.

Western Power Distribution (East Midlands) logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Dosthill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Dosthill Road, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 15:55.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Orton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:45.


Roadworks Map near to Smith Street, ATHERSTONE, CV9 2QP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Smith Street, ATHERSTONE, CV9 2QP (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
WOOD STREET, WOOD END 
(0.1 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Dec 2024
0.1
Details
Share
Follow
2
Severn Trent Water logo
BIRCHFIELD CLOSE, WOOD END 
(0.1 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Dec 2024
0.1
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.