ROADWORKS SUMMARY
Clifden Grove, KENILWORTH, CV8 2XQ
Introduction

View current and future planned roadworks and road closures for Clifden Grove, CV8 2XQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Clifden Grove, KENILWORTH, CV8 2XQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Clifden Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
Monday
Warwickshire County Council are carrying out Highway improvement works on Birmingham Road, Stoneleigh.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2020 at 09:00 and could run through until 8 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2024 at 13:34.
Monday
Warwickshire County Council are carrying out Highway improvement works on Dalehouse Lane, Kenilworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2020 at 09:00 and could run through until 8 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 Dec 2024 at 14:19.
Monday
Warwickshire County Council are carrying out Highway improvement works on Stoneleigh Road, Stoneleigh.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2020 at 09:00 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2024 at 13:34.
21 Oct 2024 and 17 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on London Road, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 17 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 12 Sep 2024 at 16:13.
27 Nov 2024 and 17 Oct 2025
Coventry City Council were proposing to carry out Highway improvement works on London Road, Coventry.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 4 Sep 2024 at 16:10.
14 Sep 2025
Coventry City Council are carrying out Highway improvement works on Greyfriars Road, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:00 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 28 Aug 2025 at 12:43.
14 Sep 2025
Coventry City Council are carrying out Highway improvement works on Queen Victoria Road, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 00:00 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 26 Jun 2025 at 10:26.
25 Nov 2025
Warwickshire County Council are carrying out roadworks on Glasshouse Lane, Kenilworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 07:30 and could run through until 25 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Aug 2025 at 12:46.
24 May and 10 Sep 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Tachbrook Road, Leamington Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 May 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 12:39.
24 May and 10 Sep 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Wise Street, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 May 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 12:39.
24 May and 10 Sep 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on High Street, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 May 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 12:40.
9 Jun and 26 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Fletchamstead Highway, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 16 Apr 2025 at 12:58.
9 Jun and 26 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Tutbury Avenue, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 16 Apr 2025 at 13:00.
23 Jun and 23 Oct 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Myton Road, Warwick.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 23 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Jul 2025 at 13:07.
Monday
Cadent Gas are proposing to carry out Utility asset works on Station Road, Balsall Common, Solihull.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 09:49.
21 Jul 2025 and 3 Apr 2026
Coventry City Council are proposing to carry out Highway improvement works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 3 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 21 May 2025 at 15:12.
21 Jul 2025 and 3 Apr 2026
Coventry City Council are proposing to carry out Highway improvement works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 3 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 28 May 2025 at 12:54.
21 Jul 2025 and 3 Apr 2026
Coventry City Council are proposing to carry out Highway improvement works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 3 April 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 28 May 2025 at 10:52.
Monday
Cadent Gas were proposing to carry out Utility asset works on Warwick New Road, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 11:42.
Monday
Cadent Gas are proposing to carry out Utility asset works on Kenpas Highway, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:25.
Monday
Cadent Gas were proposing to carry out Utility asset works on Kenpas Highway, Coventry.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 10:35.
Monday
Cadent Gas are carrying out Utility asset works on Kenpas Highway, Coventry.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:34 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 08:45.
Monday
Cadent Gas are proposing to carry out Utility asset works on Kenpas Highway, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 08:12.
Monday
Cadent Gas are proposing to carry out Utility asset works on Kenpas Highway, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 16:53.
Monday
Cadent Gas were proposing to carry out Utility asset works on Kenpas Highway, Coventry.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 10:06.
Sunday
Coventry City Council are carrying out Section 50 on Burnsall Road, Coventry.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 08:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 29 Aug 2025 at 15:44.
30 Jul and 12 Sep 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Harlaxton Energy Networks on 22 May 2025 at 11:23.
Friday
Western Power Distribution (East Midlands) are carrying out Utility asset works on High Street, Leamington Spa.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 July 2025 at 08:37 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 11:06.
4 Aug and 10 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Broad Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 10 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 9 Jun 2025 at 15:57.
4 Aug and 12 Sep 2025
Coventry City Council were proposing to carry out Highway improvement works on Broad Lane, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 27 Jun 2025 at 09:02.
12 Sep 2025
Coventry City Council are carrying out Highway improvement works on Broad Lane, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 09:54 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 4 Aug 2025 at 09:57.
19 Sep 2025
Coventry City Council are carrying out Highway improvement works on Newington Close, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 00:00 and could run through until 19 September 2025. The works will impact the verge only.
This roadwork event was last updated by Coventry City Council on 2 Sep 2025 at 10:18.
16 Sep 2025
Coventry City Council are carrying out Highway improvement works on Leamington Road, Coventry.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 August 2025 at 10:51 and could run through until 16 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 27 Aug 2025 at 09:25.
16 Sep 2025
Coventry City Council are carrying out Highway improvement works on Mantilla Drive, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2025 at 10:48 and could run through until 16 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 27 Aug 2025 at 09:26.
8 Aug and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Broad Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 09:19.
16 Sep 2025
Cadent Gas are carrying out Utility asset works on Northumberland Road, Coventry.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 09:34 and could run through until 16 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 10:07.
Today
Severn Trent Water are carrying out Utility repair and maintenance works on Upper Well Street, Coventry.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 August 2025 at 13:33 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 Aug 2025 at 15:08.
17 Aug and 10 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Bury Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Mar 2025 at 16:25.
10 Oct 2025
Western Power Distribution (East Midlands) are carrying out Utility asset works on Bury Road, Leamington Spa.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2025 at 08:35 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Aug 2025 at 09:41.
Sunday
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tachbrook Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 May 2025 at 11:35.
Sunday
Western Power Distribution (East Midlands) are carrying out Utility asset works on Tachbrook Road, Leamington Spa.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 18:30 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Aug 2025 at 09:16.
Monday
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 13 Aug 2025 at 13:12.
Monday
Western Power Distribution (Telecoms) are carrying out Utility asset works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 08:00 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 18 Aug 2025 at 09:16.
18 Aug and 27 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on West Orchards Access Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 1 Sep 2025 at 16:56.
18 Aug and 27 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on West Orchards Access Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 2 Sep 2025 at 08:25.
18 Aug and 29 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Barkers Butts Lane, Coventry.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 10:40.
Tomorrow
Warwickshire County Council were proposing to carry out Highway improvement works on Adelaide Road, Leamington Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 August 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 15 Jul 2025 at 12:42.
Tomorrow
Warwickshire County Council are proposing to carry out Highway improvement works on Clarendon Avenue, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 11 Jun 2025 at 14:18.
21 Aug and 18 Sep 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 9 Jun 2025 at 15:40.
Tuesday
Cadent Gas are carrying out Utility asset works on Waveley Road, Coventry.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:53 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:00.
Monday
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Leyes Lane, Kenilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 09:51.
26 Aug and 12 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Radford Road, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 10:59.
26 Aug and 12 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Radford Road, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 10:15.
26 Aug and 6 Oct 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Wheler Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 13 Aug 2025 at 17:17.
26 Aug and 6 Oct 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Wheler Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 26 Aug 2025 at 11:27.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on Waveley Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 16:19.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on Waveley Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 11:37.
Tuesday
Cadent Gas were proposing to carry out Utility asset works on Waveley Road, Coventry.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 9 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:17.
27 Aug and 10 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Gulson Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 18 Aug 2025 at 10:00.
27 Aug and 17 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Broad Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 30 May 2025 at 11:07.
10 Oct 2025
Western Power Distribution (Telecoms) are carrying out Utility asset works on Wheler Road, Coventry.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 12:55 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 1 Sep 2025 at 13:30.
1 Sep and 20 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Warwick Place, Leamington Spa.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 11:52.
Tomorrow
Telefonica UK were proposing to carry out Utility asset works on Scar Bank, Warwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 4 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 20 Jun 2025 at 10:21.
Friday
Telefonica UK are proposing to carry out Utility asset works on Scar Bank, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 26 Jun 2025 at 14:48.
Friday
Telefonica UK are carrying out Utility asset works on Scar Bank, Warwick.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 18:00 and could run through until 5 September 2025. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 2 Sep 2025 at 07:09.
1 and 26 Sep 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 2 Jul 2025 at 15:15.
1 and 26 Sep 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 11 Jul 2025 at 16:54.
1 and 26 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Leamington Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 2 Jun 2025 at 12:20.
1 and 26 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Leamington Road, Coventry.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 11:52.
1 and 12 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Wainbody Avenue North, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:09.
12 Sep 2025
Cadent Gas are carrying out Utility asset works on Wainbody Avenue North, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:12 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 10:10.
1 and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Dockers Close, Balsall Common, Solihull.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 16:18.
1 and 19 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Dockers Close, Balsall Common, Solihull.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 08:43.
6 Oct 2025
Western Power Distribution (Telecoms) are carrying out Utility asset works on Quinn Close, Coventry.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:20 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 1 Sep 2025 at 09:39.
1 and 27 Sep 2025
Coventry City Council are proposing to carry out Section 50 on Paradise Street, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 24 Jul 2025 at 12:25.
1 and 29 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on F P Thirlmere Close From No 9 To Rear Of No 29, Coventry.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 16:42.
1 and 20 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Poole Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 26 Aug 2025 at 14:15.
Friday
Coventry City Council were proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 14 Jul 2025 at 14:06.
Friday
Coventry City Council are carrying out Highway improvement works on Ringway St Johns, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 19:06 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 2 Sep 2025 at 19:15.
Friday
Coventry City Council are carrying out Highway improvement works on Ringway Whitefriars, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 19:04 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 2 Sep 2025 at 19:15.
Friday
Coventry City Council are carrying out Highway improvement works on Ringway Swanswell, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 19:02 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 2 Sep 2025 at 19:04.
Friday
Severn Trent Water are proposing to carry out New service connection on Nelson Lane, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Jun 2025 at 14:50.
Friday
Severn Trent Water are carrying out New service connection on Nelson Lane, Warwick.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 09:51 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 09:55.
8 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Hill, Finham, Baginton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:01.
8 Sep and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Hill, Finham, Baginton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jun 2025 at 13:55.
8 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Beanfield Avenue, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:11.
8 and 26 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Beanfield Avenue, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 10:01.
8 Sep and 10 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Kemps Green Road, Balsall Common, Solihull.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 10:40.
8 Sep and 13 Oct 2025
Western Power Distribution (Telecoms) are proposing to carry out Utility asset works on Quinn Close, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (Telecoms) on 13 Aug 2025 at 17:18.
8 and 11 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Shaftesbury Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 22 Aug 2025 at 12:44.
8 Sep and 3 Oct 2025
Coventry City Council are proposing to carry out Section 50 on Paradise Street, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 3 Sep 2025 at 08:45.
9 and 12 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Claremont Walk, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 20 Mar 2025 at 14:21.
9 and 12 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Claremont Walk, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 Aug 2025 at 11:12.
10 and 15 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Flaunden Close, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 18 Mar 2025 at 12:30.
10 and 15 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Flaunden Close, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 15 Aug 2025 at 15:15.
15 and 18 Sep 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Butts, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 14:42.
15 and 19 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Clarendon Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 14 May 2025 at 15:20.
15 and 19 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Clarendon Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 12 Aug 2025 at 16:54.
15 and 18 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Red Lane, Kenilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 2 Sep 2025 at 14:55.
15 and 19 Sep 2025
Coventry City Council are proposing to carry out Section 50 on Leaf Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 27 Aug 2025 at 09:01.
18 Sep and 17 Oct 2025
Coventry City Council are proposing to carry out Section 50 on Alma Street, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 25 Jul 2025 at 10:44.
22 and 25 Sep 2025
Telefonica UK were proposing to carry out Utility asset works on Scar Bank, Warwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Telefonica UK on 20 Jun 2025 at 10:27.
22 and 26 Sep 2025
Telefonica UK are proposing to carry out Utility asset works on Scar Bank, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 26 Jun 2025 at 14:52.
22 and 26 Sep 2025
Telefonica UK are proposing to carry out Utility asset works on Scar Bank, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 12 Aug 2025 at 10:02.
22 and 30 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 12:27.
22 and 30 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 12 Aug 2025 at 16:52.
22 Sep and 5 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Stoneleigh Road, Stoneleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 Jun 2025 at 15:57.
22 and 29 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 22 Aug 2025 at 12:46.
22 and 28 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 11 Jun 2025 at 16:27.
22 and 28 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 11 Jun 2025 at 16:28.
22 and 28 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Westwood Heath Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 11 Jun 2025 at 16:29.
22 and 28 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Westwood Heath Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 11 Jun 2025 at 16:30.
22 and 28 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Harnall Lane East, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 11 Jun 2025 at 11:04.
22 and 28 Sep 2025
Coventry City Council are proposing to carry out Highway improvement works on Harnall Lane East, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 11 Jun 2025 at 10:57.
24 and 30 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Main Street, Bubbenhall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 25 Jun 2025 at 16:10.
24 and 30 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Main Street, Bubbenhall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 13 Aug 2025 at 10:52.
25 Sep and 23 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Balsall Common, Solihull.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 17:54.
26 Sep and 31 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Broad Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 26 Jun 2025 at 11:22.
29 Sep and 7 Oct 2025
Cadent Gas are proposing to carry out New service connection on Wise Terrace, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 13:51.
29 Sep and 7 Oct 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wise Terrace, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 12:48.
29 Sep and 7 Oct 2025
Cadent Gas are proposing to carry out New service connection on Wise Terrace, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 10:35.
29 Sep and 7 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bubbenhall Road, Baginton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 1 Jul 2025 at 15:19.
29 Sep and 7 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bubbenhall Road, Baginton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 18 Aug 2025 at 08:48.
29 Sep and 1 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dial House Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 11:14.
29 Sep and 2 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Poole Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Jun 2025 at 08:39.
29 Sep and 2 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Poole Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 08:57.
30 Sep and 2 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Aug 2025 at 10:45.
2 and 16 Oct 2025
Coventry City Council were proposing to carry out Highway improvement works on Aldermoor Lane, Coventry.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 May 2025 at 13:13.
2 and 16 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Aldermoor Lane, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 9 May 2025 at 13:07.
2 and 16 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Siddeley Avenue, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 18 Mar 2025 at 12:31.
5 and 12 Oct 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Daventry Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2025 and could run through until 12 October 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 22 Jul 2025 at 16:38.
6 Oct 2025 and 30 Jan 2026
Warwickshire County Council are proposing to carry out Highway improvement works on St Johns, Coten End, Warwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 17 Jul 2025 at 15:25.
6 and 8 Oct 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Butts, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 11:52.
6 and 20 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Guys Cliffe Road, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 11:58.
6 Oct 2025 and 24 Apr 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Oakley Road, Kenilworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 April 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 15:30.
6 Oct 2025 and 24 Apr 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Stansfield Grove, Kenilworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 April 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 15:29.
6 Oct 2025 and 24 Apr 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Glasshouse Lane, Kenilworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 April 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 15:24.
6 Oct and 10 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Kenilworth Road, Coventry.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 11:49.
6 Oct and 10 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Kenilworth Road, Coventry.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 November 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:52.
6 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Kenilworth Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 16:29.
6 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Kenilworth Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 11:10.
6 Oct and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Kenpas Highway, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jul 2025 at 10:02.
6 Oct 2025 and 30 Apr 2026
Coventry City Council are proposing to carry out Highway improvement works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 22 Aug 2025 at 12:39.
6 Oct 2025 and 30 Apr 2026
Coventry City Council are proposing to carry out Highway improvement works on Humber Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 22 Aug 2025 at 12:36.
7 and 9 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holly Walk, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 27 Jun 2025 at 15:56.
7 and 9 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holly Walk, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Jul 2025 at 12:26.
13 Oct 2025 and 27 Feb 2026
Warwickshire County Council are proposing to carry out Highway improvement works on St Johns, Coten End, Warwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 12 Aug 2025 at 11:30.
13 and 15 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Sandy Lane, Blackdown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Jul 2025 at 14:48.
13 and 15 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Sandy Lane, Blackdown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Aug 2025 at 11:33.
13 Oct and 7 Nov 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Wolfe Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Jul 2025 at 16:47.
13 Oct and 7 Nov 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Wolfe Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Aug 2025 at 13:30.
14 and 17 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Terrace, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 10:21.
14 and 17 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 22 Jul 2025 at 17:00.
14 and 17 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 22 Jul 2025 at 16:54.
14 and 17 Oct 2025
Coventry City Council were proposing to carry out Highway improvement works on Green Lane, Finham, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 14 Jul 2025 at 13:44.
20 Oct and 24 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Rugby Road, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 17:01.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cubbington Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 14:28.
20 and 22 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cubbington Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Jul 2025 at 10:52.
20 and 24 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Stoneleigh Road, Stoneleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 2 May 2025 at 11:21.
20 and 23 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Shaftesbury Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 10 Jul 2025 at 10:07.
20 and 23 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Shaftesbury Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 10 Jul 2025 at 10:07.
20 and 27 Oct 2025
Coventry City Council are proposing to carry out Section 50 on Raglan Street, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 25 Jul 2025 at 10:32.
21 and 24 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Top, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 13:34.
25 Oct and 21 Nov 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Myton Road, Warwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Apr 2025 at 10:28.
27 and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 09:53.
27 Oct and 10 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Fairlawn Close, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 17:06.
27 Oct and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Stoneleigh Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 17:05.
27 Oct and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Stoneleigh Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 10:13.
27 and 31 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Cromwell Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 29 Aug 2025 at 10:52.
28 and 30 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bowers Croft, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 7 May 2025 at 12:03.
28 and 30 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bowers Croft, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 12 May 2025 at 11:21.
28 and 30 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Whitemoor Road, Kenilworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 30 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 28 Jul 2025 at 14:11.
28 and 30 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Elmdene Road, Kenilworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 30 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 28 Jul 2025 at 13:48.
31 Oct and 5 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Coventry Road, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 22 May 2025 at 14:16.
3 and 17 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Cornwall Place, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 May 2025 at 17:11.
3 and 7 Nov 2025
Coventry City Council are proposing to carry out Highway improvement works on Eastlands Grove, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 29 Jul 2025 at 13:35.
10 and 14 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Ashow Road, Chesford, Kenilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:04.
10 and 14 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Blackdown.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:04.
10 and 14 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Ashow Road, Ashow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:05.
10 and 14 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Chesford, Kenilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:02.
10 and 14 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 15:28.
11 and 13 Nov 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Merynton Avenue, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Aug 2025 at 09:06.
11 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Hawthorn Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 08:50.
11 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Hawthorn Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:10.
11 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Frisby Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 08:58.
11 and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Frisby Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 10:10.
15 and 19 Nov 2025
Coventry City Council were proposing to carry out Highway improvement works on Ringway St Johns, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 22 Aug 2025 at 13:03.
15 and 19 Nov 2025
Coventry City Council are proposing to carry out Highway improvement works on Ringway Whitefriars, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 Aug 2025 at 13:43.
15 and 19 Nov 2025
Coventry City Council are proposing to carry out Highway improvement works on Ringway Swanswell, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 Aug 2025 at 13:43.
15 and 19 Nov 2025
Coventry City Council were proposing to carry out Highway improvement works on Ringway Swanswell, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 Aug 2025 at 12:50.
17 and 19 Nov 2025
Severn Trent Water are proposing to carry out New service connection on New Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 29 Aug 2025 at 14:09.
17 and 19 Nov 2025
Severn Trent Water are proposing to carry out New service connection on New Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 29 Aug 2025 at 14:18.
17 and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Kenilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 11:59.
17 and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Kenilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:00.
18 and 20 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pomeroy Close, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 10:58.
19 and 21 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Nicholas Street, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Aug 2025 at 13:03.
24 Nov 2025 and 15 Oct 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Kenilworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 October 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Warwickshire County Council on 24 Jun 2025 at 10:29.
25 and 28 Nov 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Eaton Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 24 Jul 2025 at 15:33.
25 and 28 Nov 2025
Coventry City Council are proposing to carry out Highway improvement works on Ringway St Johns, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 27 Aug 2025 at 17:03.
1 Dec 2025 and 12 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Gibbet Hill Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 12 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 16:59.
1 and 30 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Gibbet Hill Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 30 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 10:00.
Roadworks Map near to Clifden Grove, KENILWORTH, CV8 2XQ (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Clifden Grove, KENILWORTH, CV8 2XQ (13 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Sep 2020 - 8 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.