ROADWORKS SUMMARY
The Laurels, COVENTRY, CV7 8FA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Laurels, CV7 8FA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Laurels, COVENTRY, CV7 8FA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Laurels are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Coventry City Council logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Station Square

Coventry City Council are carrying out Section 50 on Station Square, Coventry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 09:00 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Coventry City Council on 3 May 2023 at 12:51.

Coventry City Council logo
LONG TERM
Between
2 Jan and 12 Dec 2024
Details
View Map
Share
Follow
Leicester Causeway

Coventry City Council are proposing to carry out Highway improvement works on Leicester Causeway, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Coventry City Council on 25 Nov 2023 at 10:06.

Coventry City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Jimmy Hill Way

Coventry City Council are carrying out Highway improvement works on Jimmy Hill Way, Coventry.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 00:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 8 Aug 2024 at 09:26.

Coventry City Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Foleshill Road

Coventry City Council are carrying out Highway improvement works on Foleshill Road, Coventry.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 00:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 8 Aug 2024 at 09:26.

Coventry City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Crampers Fields

Coventry City Council are carrying out Highway improvement works on Crampers Fields, Coventry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 00:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 26 Nov 2024 at 15:12.

Coventry City Council logo
LONG TERM
Between
27 Oct and 9 Dec 2024
Details
View Map
Share
Foleshill Road

Coventry City Council were proposing to carry out Highway improvement works on Foleshill Road, Coventry.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2024 and run through until 9 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 5 Nov 2024 at 11:56.

Coventry City Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
F P Greyfriars Green - Freemans Way To Starley Memorial Statue

Coventry City Council are carrying out Highway improvement works on F P Greyfriars Green - Freemans Way To Starley Memorial Statue, Coventry.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 4 November 2024 at 00:00 and could run through until 6 December 2024. The works will impact the cycleway and footpath.

This roadwork event was last updated by Coventry City Council on 26 Nov 2024 at 12:58.

Murphy Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Fivefield Road

Murphy Gas Networks are carrying out Utility asset works on Fivefield Road, Coventry.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Gas Networks on 25 Nov 2024 at 15:10.

Murphy Power Distribution logo
Finishing
Monday
Details
View Map
Share
Follow
Fivefield Road

Murphy Power Distribution are carrying out Utility asset works on Fivefield Road, Coventry.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 25 Nov 2024 at 15:08.

Coventry City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
New Union Street

Coventry City Council are proposing to carry out Section 50 on New Union Street, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 11 Nov 2024 at 10:24.

Coventry City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
New Union Street

Coventry City Council are carrying out Section 50 on New Union Street, Coventry.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 06:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 12 Nov 2024 at 09:40.

Coventry City Council logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Brownshill Green Road

Coventry City Council are proposing to carry out Highway improvement works on Brownshill Green Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 15 Oct 2024 at 09:32.

Coventry City Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Brownshill Green Road

Coventry City Council are proposing to carry out Highway improvement works on Brownshill Green Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 6 Nov 2024 at 09:45.

Coventry City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Brownshill Green Road

Coventry City Council are carrying out Highway improvement works on Brownshill Green Road, Coventry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 19 Nov 2024 at 13:57.

Murphy Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Fivefield Road

Murphy Gas Networks are proposing to carry out Utility asset works on Fivefield Road, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Gas Networks on 7 Nov 2024 at 08:41.

Murphy Power Distribution logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Fivefield Road

Murphy Power Distribution are proposing to carry out Utility asset works on Fivefield Road, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 7 Nov 2024 at 08:41.

Severn Trent Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Bennetts Road North

Severn Trent Water are carrying out Utility asset works on Bennetts Road North, Coventry.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 09:38.

Western Power Distribution (East Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Palmer Lane

Western Power Distribution (East Midlands) are carrying out Utility repair and maintenance works on Palmer Lane, Coventry.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 15:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 16:40.

LONG TERM
Between
22 Nov and 27 Dec 2024
Details
View Map
Share
Smorrall Lane

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Smorrall Lane, Corley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 27 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Sep 2024 at 12:03.

Coventry City Council logo
Finishing
Today
Details
View Map
Share
Follow
Pickford Green Lane

Coventry City Council are proposing to carry out Highway improvement works on Pickford Green Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 21 Oct 2024 at 14:43.

Coventry City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pickford Green Lane

Coventry City Council are proposing to carry out Highway improvement works on Pickford Green Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 5 Nov 2024 at 09:20.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Prior Deram Walk

Cadent Gas are proposing to carry out Utility asset works on Prior Deram Walk, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:11.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Queen Margarets Road

Cadent Gas are proposing to carry out Utility asset works on Queen Margarets Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:10.

Coventry City Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Old Church Road

Coventry City Council are proposing to carry out Highway improvement works on Old Church Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 15 Nov 2024 at 09:07.

Coventry City Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Old Church Road

Coventry City Council are proposing to carry out Highway improvement works on Old Church Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 15 Nov 2024 at 14:16.

Warwickshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Bedworth Bypass

Warwickshire County Council are proposing to carry out Highway improvement works on Bedworth Bypass, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 11 Sep 2024 at 11:53.

Cadent Gas logo
Between
4 and 24 Dec 2024
Details
View Map
Share
Follow
Prior Deram Walk

Cadent Gas are proposing to carry out Utility asset works on Prior Deram Walk, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 18:39.

Cadent Gas logo
Between
4 and 24 Dec 2024
Details
View Map
Share
Prior Deram Walk

Cadent Gas were proposing to carry out Utility asset works on Prior Deram Walk, Coventry.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:33.

Cadent Gas logo
Between
4 and 24 Dec 2024
Details
View Map
Share
Follow
Queen Margarets Road

Cadent Gas are proposing to carry out Utility asset works on Queen Margarets Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 18:40.

Cadent Gas logo
Between
4 and 24 Dec 2024
Details
View Map
Share
Queen Margarets Road

Cadent Gas were proposing to carry out Utility asset works on Queen Margarets Road, Coventry.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:36.

Coventry City Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Eaton Road

Coventry City Council are proposing to carry out Highway improvement works on Eaton Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 26 Nov 2024 at 16:13.

Coventry City Council logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Bennetts Road

Coventry City Council are proposing to carry out Highway improvement works on Bennetts Road, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 15 Nov 2024 at 08:51.

Severn Trent Water logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Bennetts Road North

Severn Trent Water are proposing to carry out Utility asset works on Bennetts Road North, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 13:15.

LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Smorrall Lane

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Smorrall Lane, Corley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Sep 2024 at 09:03.

Warwickshire County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Church Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Church Lane, Maxstoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 9 Sep 2024 at 11:09.

Warwickshire County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Church Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Church Lane, Maxstoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 12:03.

Coventry City Council logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Gayer Street

Coventry City Council were proposing to carry out Highway improvement works on Gayer Street, Coventry.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 30 Oct 2024 at 08:18.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Shawbury Lane

BT are proposing to carry out Utility asset works on Shawbury Lane, Shustoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 16 Sep 2024 at 13:25.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Shawbury Lane

BT are proposing to carry out Utility asset works on Shawbury Lane, Shustoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Oct 2024 at 11:22.

Coventry City Council logo
LONG TERM
Between
2 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Greyfriars Road

Coventry City Council are proposing to carry out Highway improvement works on Greyfriars Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 3 Oct 2024 at 15:20.

Coventry City Council logo
LONG TERM
Between
2 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Queen Victoria Road

Coventry City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 3 Oct 2024 at 15:21.

Coventry City Council logo
LONG TERM
Between
2 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Queen Victoria Road

Coventry City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 20 Sep 2024 at 16:58.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Holmes Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holmes Drive, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 14:37.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Holmes Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holmes Drive, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 11:05.

Severn Trent Water logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Browns Lane

Severn Trent Water are proposing to carry out Utility asset works on Browns Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:36.

Severn Trent Water logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Browns Lane

Severn Trent Water are proposing to carry out Utility asset works on Browns Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 10:21.

Severn Trent Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
St Helens Way

Severn Trent Water are proposing to carry out Utility asset works on St Helens Way, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 10:37.

Severn Trent Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
St Helens Way

Severn Trent Water are proposing to carry out Utility asset works on St Helens Way, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:39.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Kingsley Terrace

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kingsley Terrace, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 11:50.

Murphy Power Distribution logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Tamworth Road

Murphy Power Distribution are proposing to carry out Utility asset works on Tamworth Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 28 Oct 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Woodlands Road

Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Woodlands, Bedworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 09:22.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Woodlands Road

Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Woodlands, Bedworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:46.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Sutherland Drive

Cadent Gas are proposing to carry out Utility asset works on Sutherland Drive, Bedworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:25.

Severn Trent Water logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Ox Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ox Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 11:29.

Severn Trent Water logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Ox Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ox Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 08:38.

Coventry City Council logo
LONG TERM
Between
9 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Aldermans Green Road

Coventry City Council are proposing to carry out Section 50 on Aldermans Green Road, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Coventry City Council on 16 Oct 2024 at 13:59.

Severn Trent Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Birmingham Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 08:47.

Severn Trent Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Birmingham Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 11:52.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Prior Deram Walk

Cadent Gas are proposing to carry out Utility asset works on Prior Deram Walk, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:18.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Prior Deram Walk

Cadent Gas are proposing to carry out Utility asset works on Prior Deram Walk, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 17:00.

Severn Trent Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Coventry Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coventry Road, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 16:03.

Severn Trent Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Coventry Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Coventry Road, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 10:42.

Telefonica UK logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Dunchurch Highway

Telefonica UK are proposing to carry out Utility repair and maintenance works on Dunchurch Highway, Coventry.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Telefonica UK on 8 Nov 2024 at 13:25.

Severn Trent Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Bartons Meadow

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bartons Meadow, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 11:23.

Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Smorrall Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Smorrall Lane, Astley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:44.

Severn Trent Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Penny Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Penny Park Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 11:06.

Severn Trent Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Penny Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Penny Park Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 14:30.

Warwickshire County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rye Piece Ringway

Warwickshire County Council are proposing to carry out Highway improvement works on Rye Piece Ringway, Bedworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 1 Nov 2024 at 10:22.

Warwickshire County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Bedworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 24 Oct 2024 at 14:17.

Cadent Gas logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Prior Deram Walk

Cadent Gas are proposing to carry out Utility asset works on Prior Deram Walk, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 17:02.

Cadent Gas logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Queen Margarets Road

Cadent Gas are proposing to carry out Utility asset works on Queen Margarets Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 17:04.

Telefonica UK logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Dunchurch Highway

Telefonica UK are proposing to carry out Utility repair and maintenance works on Dunchurch Highway, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telefonica UK on 8 Nov 2024 at 13:27.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wappenbury Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wappenbury Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 12:05.

Severn Trent Water logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Fenton Road

Severn Trent Water are proposing to carry out Utility asset works on Fenton Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 10:39.

Severn Trent Water logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Fenton Road

Severn Trent Water are proposing to carry out Utility asset works on Fenton Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:40.

Severn Trent Water logo
Between
29 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Welsh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Welsh Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 07:56.

Cadent Gas logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Butts

Cadent Gas are proposing to carry out Utility asset works on Butts, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 11:52.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Butts

Cadent Gas are proposing to carry out Utility asset works on Butts, Coventry.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:20.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Harper Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Sep 2024 at 16:03.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Harper Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 10:07.

Severn Trent Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Birmingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:07.

Cadent Gas logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
The Raywoods

Cadent Gas are proposing to carry out Utility asset works on The Raywoods, Stockingford, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:56.

Warwickshire County Council logo
Between
5 and 26 Feb 2025
Details
View Map
Share
Follow
Church Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Church Lane, Little London, Fillongley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Nov 2024 at 11:39.

Warwickshire County Council logo
Between
5 and 26 Feb 2025
Details
View Map
Share
Follow
Coventry Road

Warwickshire County Council are proposing to carry out Highway improvement works on Coventry Road, Fillongley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Nov 2024 at 11:41.

Severn Trent Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Shawbury Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shawbury Lane, Fillongley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 09:48.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Sandy Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Fillongley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 12:13.

Cadent Gas logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Newdigate Road

Cadent Gas are proposing to carry out Utility asset works on Newdigate Road, Bedworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:26.

Coventry City Council logo
Between
11 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Parrotts Grove

Coventry City Council are proposing to carry out Section 50 on Parrotts Grove, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Oct 2024 at 13:59.

Warwickshire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Portland Drive

Warwickshire County Council are proposing to carry out Highway improvement works on Portland Drive, Whittleford, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 26 Nov 2024 at 15:44.

Warwickshire County Council logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Gipsy Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Gipsy Lane, Whitestone, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 22 Nov 2024 at 15:57.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Albany Road

Cadent Gas are proposing to carry out Utility asset works on Albany Road, Coventry.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 17:06.

Severn Trent Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Jackers Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Jackers Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 14:41.

Warwickshire County Council logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Mitchell Road

Warwickshire County Council are proposing to carry out Highway improvement works on Mitchell Road, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 21 Aug 2024 at 10:34.

Warwickshire County Council logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
High Street

Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Bedworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 14:54.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Shawbury Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shawbury Lane, Fillongley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 11:46.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Shawbury Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shawbury Lane, Fillongley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 15:33.

Severn Trent Water logo
LONG TERM
Between
18 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Unicorn Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Unicorn Lane, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 16:59.

Severn Trent Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Old Church Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Old Church Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 15:19.

Severn Trent Water logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Sunnyside Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sunnyside Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 12:51.

Severn Trent Water logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Sunnyside Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sunnyside Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 10:11.

Severn Trent Water logo
Between
24 Feb and 6 Mar 2025
Details
View Map
Share
Follow
King Edward Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on King Edward Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 09:08.

Severn Trent Water logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Avon Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Avon Street, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 10:08.

Western Power Distribution (East Midlands) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
The Rowans

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on The Rowans, Bedworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 22 Nov 2024 at 14:41.


Roadworks Map near to The Laurels, COVENTRY, CV7 8FA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 08:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Laurels, COVENTRY, CV7 8FA (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Warwickshire County Council logo
WOOD END LANE 
(0.9 miles)
Warwickshire County Council
Highway improvement works - Footway, Verge - Multi-way signals
In Progress
Since: 26 Nov 2024 09:39
(Scheduled: 25 Nov 2024 - 27 Nov 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.