ROADWORKS SUMMARY
Breach Oak Lane, COVENTRY, CV7 8AU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Breach Oak Lane, CV7 8AU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Breach Oak Lane, COVENTRY, CV7 8AU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Breach Oak Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Coventry City Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Pickford Green Lane

Coventry City Council are carrying out Section 50 on Pickford Green Lane, Coventry.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 January 2023 at 08:30 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 23 Nov 2023 at 08:01.

Warwickshire County Council logo
LONG TERM
Between
17 Jan 2023 and 30 Jun 2024
Details
View Map
Share
Follow
Edinburgh Road

Warwickshire County Council are proposing to carry out roadworks on Edinburgh Road, Camp Hill, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2023 and could run through until 30 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warwickshire County Council on 17 Jan 2023 at 10:10.

Warwickshire County Council logo
LONG TERM
Between
17 Jan 2023 and 30 Jun 2024
Details
View Map
Share
Follow
Hillcrest Road

Warwickshire County Council are proposing to carry out roadworks on Hillcrest Road, Camp Hill, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2023 and could run through until 30 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warwickshire County Council on 17 Jan 2023 at 10:11.

Coventry City Council logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Masser Road

Coventry City Council are carrying out Highway improvement works on Masser Road, Coventry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2023 at 00:00 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 2 Nov 2023 at 09:44.

Warwickshire County Council logo
LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Follow
Vale View

Warwickshire County Council are carrying out roadworks on Vale View, Stockingford, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 November 2023 at 08:00 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 5 Feb 2024 at 16:36.

Coventry City Council logo
LONG TERM
Between
30 Dec 2023 and 3 Nov 2024
Details
View Map
Share
Follow
Birmingham Road

Coventry City Council are proposing to carry out Highway improvement works on Birmingham Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2023 and could run through until 3 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Coventry City Council on 26 Aug 2023 at 09:50.

Coventry City Council logo
LONG TERM
Between
2 Jan and 12 Dec 2024
Details
View Map
Share
Follow
Leicester Causeway

Coventry City Council are proposing to carry out Highway improvement works on Leicester Causeway, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Coventry City Council on 25 Nov 2023 at 10:06.

Coventry City Council logo
LONG TERM
Between
2 Jan and 10 May 2024
Details
View Map
Share
Follow
Foleshill Road

Coventry City Council are proposing to carry out Highway improvement works on Foleshill Road, Coventry.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Coventry City Council on 27 Sep 2023 at 08:14.

Cadent Gas logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Greenmoor Road

Cadent Gas are carrying out Utility asset works on Greenmoor Road, Nuneaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 11:20 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 11:31.

Cadent Gas logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Beverley Avenue

Cadent Gas are proposing to carry out Utility asset works on Beverley Avenue, Whittleford, Nuneaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Oct 2023 at 13:40.

Coventry City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Jenkins Avenue

Coventry City Council are carrying out Highway improvement works on Jenkins Avenue, Coventry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 14:26 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 8 Apr 2024 at 13:01.

Warwickshire County Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Smarts Road

Warwickshire County Council are carrying out Section 50 on Smarts Road, Bedworth Heath, Bedworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 9 Apr 2024 at 15:00.

Warwickshire County Council logo
LONG TERM
Between
8 Apr and 17 May 2024
Details
View Map
Share
Follow
Roxburgh Road

Warwickshire County Council are proposing to carry out Highway improvement works on Roxburgh Road, Attleborough, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 13 Mar 2024 at 07:49.

Warwickshire County Council logo
LONG TERM
Between
13 Apr and 26 May 2024
Details
View Map
Share
Follow
Bermuda Road

Warwickshire County Council are proposing to carry out Highway improvement works on Bermuda Road, Bermuda, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 10 Apr 2024 at 05:42.

Coventry City Council logo
LONG TERM
Between
15 Apr and 31 May 2024
Details
View Map
Share
Follow
Crampers Fields

Coventry City Council are proposing to carry out Highway improvement works on Crampers Fields, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 4 Apr 2024 at 10:22.

Warwickshire County Council logo
LONG TERM
Between
15 Apr and 28 Jun 2024
Details
View Map
Share
Follow
Grove Lane

Warwickshire County Council are proposing to carry out roadworks on Grove Lane, Keresley End.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 31 Jan 2024 at 10:35.

Coventry City Council logo
LONG TERM
Between
15 Apr and 28 Jun 2024
Details
View Map
Share
Follow
Bennetts Road North

Coventry City Council are proposing to carry out Section 50 on Bennetts Road North, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Coventry City Council on 15 Feb 2024 at 10:56.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Marriott Road

Cadent Gas are proposing to carry out Utility asset works on Marriott Road, Market End, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 13:21.

Warwickshire County Council logo
Until
13 May 2024
Details
View Map
Share
Follow
Hazell Way

Warwickshire County Council are carrying out Highway repair and maintenance works on Hazell Way, Bermuda, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Apr 2024 at 15:50.

Warwickshire County Council logo
Until
13 May 2024
Details
View Map
Share
Follow
Bermuda Village

Warwickshire County Council are carrying out Highway improvement works on Bermuda Village, Bermuda, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Apr 2024 at 15:51.

Warwickshire County Council logo
Until
13 May 2024
Details
View Map
Share
Follow
The Bridleway

Warwickshire County Council are carrying out Highway improvement works on The Bridleway, Bermuda, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Apr 2024 at 15:50.

Warwickshire County Council logo
Until
13 May 2024
Details
View Map
Share
Follow
Bermuda Road

Warwickshire County Council are carrying out Highway improvement works on Bermuda Road, Bermuda, Nuneaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 15 Apr 2024 at 15:50.

Coventry City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Tiber Close

Coventry City Council are carrying out Highway improvement works on Tiber Close, Coventry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 23:00 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 24 Apr 2024 at 15:35.

Coventry City Council logo
Between
21 Apr and 17 May 2024
Details
View Map
Share
Follow
Rosslyn Avenue

Coventry City Council are proposing to carry out Highway improvement works on Rosslyn Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Apr 2024 at 14:46.

Coventry City Council logo
Between
21 Apr and 17 May 2024
Details
View Map
Share
Follow
Sadler Road

Coventry City Council are proposing to carry out Highway improvement works on Sadler Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Apr 2024 at 14:52.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Back Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Back Lane, Solihull.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:45 and could run through until 29 April 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 25 Apr 2024 at 14:49.

Cadent Gas logo
Until
14 May 2024
Details
View Map
Share
Follow
Croft Road

Cadent Gas are carrying out Utility asset works on Croft Road, Nuneaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 08:10 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 08:12.

Cadent Gas logo
Between
29 Apr and 20 May 2024
Details
View Map
Share
Follow
Wildey Road

Cadent Gas are proposing to carry out Utility asset works on Wildey Road, Market End, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 13:20.

Network Rail logo
Between
29 Apr and 24 May 2024
Details
View Map
Share
Follow
Stonehouse Lane

Network Rail are proposing to carry out Works for Rail Purposes on Stonehouse Lane, Arley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Apr 2024 at 10:45.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
29 Apr and 30 May 2024
Details
View Map
Share
Follow
Bucks Hill

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Bucks Hill, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Apr 2024 at 11:05.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Byford Street

Severn Trent Water are proposing to carry out New service connection on Byford Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Jan 2024 at 10:39.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
The Woodlands

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Woodlands, Hartshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Mar 2024 at 12:15.

Severn Trent Water logo
Between
1 and 8 May 2024
Details
View Map
Share
Follow
Oak Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 1 Feb 2024 at 14:12.

Coventry City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Vinecote Road

Coventry City Council are proposing to carry out Highway improvement works on Vinecote Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 27 Apr 2024 at 21:10.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Newtown Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Newtown Road, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Jan 2024 at 14:50.

Cadent Gas logo
Between
6 and 27 May 2024
Details
View Map
Share
Follow
F P Sandhurst Grove To Lydgate Road

Cadent Gas are proposing to carry out Utility asset works on F P Sandhurst Grove To Lydgate Road, Coventry.

These works are categorised as Major.

The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 07:46.

Severn Trent Water logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Pickford Green Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pickford Green Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Mar 2024 at 05:08.

Coventry City Council logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Burnaby Road

Coventry City Council are proposing to carry out Highway improvement works on Burnaby Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 27 Apr 2024 at 21:09.

Coventry City Council logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
The Scotchill

Coventry City Council are proposing to carry out Highway improvement works on The Scotchill, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 27 Apr 2024 at 21:08.

Severn Trent Water logo
Between
7 and 10 May 2024
Details
View Map
Share
Follow
Cheveral Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cheveral Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Feb 2024 at 10:42.

Severn Trent Water logo
Between
7 and 23 May 2024
Details
View Map
Share
Follow
Charlewood Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Charlewood Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Apr 2024 at 13:23.

Severn Trent Water logo
Between
7 and 13 May 2024
Details
View Map
Share
Follow
Nunts Park Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nunts Park Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Mar 2024 at 11:18.

Severn Trent Water logo
Between
8 and 10 May 2024
Details
View Map
Share
Follow
Whitebeam Way

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Whitebeam Way, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Feb 2024 at 11:54.

Severn Trent Water logo
Between
20 and 27 May 2024
Details
View Map
Share
Follow
Smorrall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smorrall Lane, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Feb 2024 at 13:45.

Severn Trent Water logo
Between
28 May and 11 Jun 2024
Details
View Map
Share
Follow
Sunningdale Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sunningdale Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 20 Mar 2024 at 09:25.

Coventry City Council logo
Between
28 May and 23 Jun 2024
Details
View Map
Share
Follow
Fivefield Road

Coventry City Council are proposing to carry out Section 50 on Fivefield Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 23 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Coventry City Council on 18 Mar 2024 at 02:11.

Severn Trent Water logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Burbages Lane

Severn Trent Water are proposing to carry out New service connection on Burbages Lane, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Apr 2024 at 09:31.

Warwickshire County Council logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Wiclif Way

Warwickshire County Council are proposing to carry out Highway improvement works on Wiclif Way, Church Farm, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 23 Apr 2024 at 13:27.

Severn Trent Water logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Vernons Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vernons Lane, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 27 Feb 2024 at 12:26.

Coventry City Council logo
Between
29 and 31 May 2024
Details
View Map
Share
Follow
Birmingham Road

Coventry City Council are proposing to carry out Highway improvement works on Birmingham Road, Millisons Wood, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 31 Jan 2024 at 12:03.

Severn Trent Water logo
Between
1 and 3 Jun 2024
Details
View Map
Share
Follow
Newtown Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Newtown Road, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Feb 2024 at 14:36.

Cadent Gas logo
Between
3 and 17 Jun 2024
Details
View Map
Share
Follow
Swillington Road

Cadent Gas are proposing to carry out Utility asset works on Swillington Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 14:10.

Cadent Gas logo
Between
3 and 17 Jun 2024
Details
View Map
Share
Follow
Lydgate Road

Cadent Gas are proposing to carry out Utility asset works on Lydgate Road, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 14:10.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Four Pounds Avenue

Coventry City Council are proposing to carry out Highway improvement works on Four Pounds Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 8 Mar 2024 at 12:28.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Light Lane

Coventry City Council are proposing to carry out Highway improvement works on Light Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:43.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Eastlands Grove

Coventry City Council are proposing to carry out Highway improvement works on Eastlands Grove, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 21:06.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Lydgate Road

Coventry City Council are proposing to carry out Highway improvement works on Lydgate Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 8 Mar 2024 at 15:00.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Radford Road

Coventry City Council are proposing to carry out Highway improvement works on Radford Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:52.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Cashs Lane

Coventry City Council are proposing to carry out Highway improvement works on Cashs Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:41.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Sullivan Road

Coventry City Council are proposing to carry out Highway improvement works on Sullivan Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 09:42.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Proffitt Avenue

Coventry City Council are proposing to carry out Highway improvement works on Proffitt Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:30.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Halford Lane

Coventry City Council are proposing to carry out Highway improvement works on Halford Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:37.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Classic Drive

Coventry City Council are proposing to carry out Highway improvement works on Classic Drive, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:33.

Coventry City Council logo
Between
8 and 14 Jun 2024
Details
View Map
Share
Follow
Orton Road

Coventry City Council are proposing to carry out Highway improvement works on Orton Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 9 Mar 2024 at 12:46.

Severn Trent Water logo
Between
10 and 13 Jun 2024
Details
View Map
Share
Follow
Edward Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Edward Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Feb 2024 at 10:12.

Severn Trent Water logo
Between
10 and 13 Jun 2024
Details
View Map
Share
Follow
Edward Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Edward Street, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Mar 2024 at 16:28.

Cadent Gas logo
Between
10 and 12 Jun 2024
Details
View Map
Share
Follow
Newtown Road

Cadent Gas are proposing to carry out Utility asset works on Newtown Road, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Feb 2024 at 09:26.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Oldfield Road

Coventry City Council are proposing to carry out Highway improvement works on Oldfield Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 14 Mar 2024 at 17:37.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Midland Road

Coventry City Council are proposing to carry out Highway improvement works on Midland Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 17 Mar 2024 at 20:32.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Evenlode Crescent

Coventry City Council are proposing to carry out Highway improvement works on Evenlode Crescent, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 23:25.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Edmund Road

Coventry City Council are proposing to carry out Highway improvement works on Edmund Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 17 Mar 2024 at 20:22.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Southbank Road

Coventry City Council are proposing to carry out Highway improvement works on Southbank Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 23:22.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Langnor Road

Coventry City Council are proposing to carry out Highway improvement works on Langnor Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 23:16.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Edgwick Road

Coventry City Council are proposing to carry out Highway improvement works on Edgwick Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 17 Mar 2024 at 20:13.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Brownshill Green Road

Coventry City Council are proposing to carry out Highway improvement works on Brownshill Green Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 23:30.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Gaydon Close

Coventry City Council are proposing to carry out Highway improvement works on Gaydon Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 17 Mar 2024 at 20:25.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Northbrook Road

Coventry City Council are proposing to carry out Highway improvement works on Northbrook Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 23:19.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Over Street

Coventry City Council are proposing to carry out Highway improvement works on Over Street, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 18 Mar 2024 at 00:21.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Potters Green Road

Coventry City Council are proposing to carry out Highway improvement works on Potters Green Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Mar 2024 at 21:11.

Coventry City Council logo
Between
12 and 18 Jun 2024
Details
View Map
Share
Follow
Deedmore Road

Coventry City Council are proposing to carry out Highway improvement works on Deedmore Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 17 Mar 2024 at 20:10.

Coventry City Council logo
Between
13 and 19 Jun 2024
Details
View Map
Share
Follow
Pinners Croft

Coventry City Council are proposing to carry out Highway improvement works on Pinners Croft, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 14 Mar 2024 at 08:39.

Coventry City Council logo
Between
13 and 19 Jun 2024
Details
View Map
Share
Follow
Scots Lane

Coventry City Council are proposing to carry out Highway improvement works on Scots Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 18 Mar 2024 at 00:30.

Coventry City Council logo
Between
13 and 19 Jun 2024
Details
View Map
Share
Follow
Keresley Brook Road

Coventry City Council are proposing to carry out Highway improvement works on Keresley Brook Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 18 Mar 2024 at 00:36.

Coventry City Council logo
Between
14 and 20 Jun 2024
Details
View Map
Share
Follow
Highfield Road

Coventry City Council are proposing to carry out Highway improvement works on Highfield Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 18 Mar 2024 at 01:15.

BT logo
Between
14 and 24 Jun 2024
Details
View Map
Share
Follow
Vale View

BT are proposing to carry out New service connection on Vale View, Stockingford, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Mar 2024 at 16:11.

Severn Trent Water logo
Between
17 and 26 Jun 2024
Details
View Map
Share
Follow
Loder Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Loder Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Apr 2024 at 09:10.

Severn Trent Water logo
Between
17 and 24 Jun 2024
Details
View Map
Share
Follow
Smorrall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smorrall Lane, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Mar 2024 at 08:10.

Severn Trent Water logo
Between
18 and 26 Jun 2024
Details
View Map
Share
Follow
Eversleigh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Eversleigh Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 14:30.

Cadent Gas logo
Between
18 and 20 Jun 2024
Details
View Map
Share
Follow
Frederick Road

Cadent Gas are proposing to carry out Remedial works on Frederick Road, New Arley, Arley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Mar 2024 at 11:06.

BT logo
Between
19 and 21 Jun 2024
Details
View Map
Share
Follow
Rectory Lane

BT are proposing to carry out Utility repair and maintenance works on Rectory Lane, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 4 Apr 2024 at 10:10.

Cadent Gas logo
LONG TERM
Between
24 Jun and 4 Oct 2024
Details
View Map
Share
Follow
Heath End Road

Cadent Gas are proposing to carry out Utility asset works on Heath End Road, Nuneaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2024 at 12:39.

Coventry City Council logo
Between
26 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Deedmore Road

Coventry City Council are proposing to carry out Highway improvement works on Deedmore Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 31 Mar 2024 at 21:25.

Coventry City Council logo
Between
28 Jun and 6 Jul 2024
Details
View Map
Share
Follow
Bishopton Close

Coventry City Council are proposing to carry out Highway improvement works on Bishopton Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 6 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Feb 2024 at 10:57.

Coventry City Council logo
Between
28 Jun and 4 Jul 2024
Details
View Map
Share
Follow
Four Pounds Avenue

Coventry City Council are proposing to carry out Highway improvement works on Four Pounds Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 28 Mar 2024 at 15:59.

Coventry City Council logo
LONG TERM
Between
30 Jun and 31 Dec 2024
Details
View Map
Share
Follow
Jimmy Hill Way

Coventry City Council are proposing to carry out Highway improvement works on Jimmy Hill Way, Coventry.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Apr 2024 at 14:29.

Coventry City Council logo
LONG TERM
Between
30 Jun and 31 Dec 2024
Details
View Map
Share
Follow
Foleshill Road

Coventry City Council are proposing to carry out Highway improvement works on Foleshill Road, Coventry.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Coventry City Council on 16 Apr 2024 at 14:31.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Coventry Road

Warwickshire County Council are proposing to carry out Highway improvement works on Coventry Road, Exhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 07:35.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Bayton Road

Warwickshire County Council are proposing to carry out Highway improvement works on Bayton Road, Exhall, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 07:36.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Bennetts Road North

Warwickshire County Council are proposing to carry out Highway improvement works on Bennetts Road North, Corley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 16 Apr 2024 at 16:02.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Goodyers End Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Goodyers End Lane, Goodyers End, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 07:39.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Highfield Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Highfield Lane, Corley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 16 Apr 2024 at 16:01.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Bulkington Road

Warwickshire County Council are proposing to carry out Highway improvement works on Bulkington Road, Bedworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 07:37.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Ansley Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Ansley Lane, Old Arley, Arley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 08:45.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Ansley Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Ansley Lane, Ansley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 08:46.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Nuneaton Road

Warwickshire County Council are proposing to carry out Highway improvement works on Nuneaton Road, Over Whitacre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 16 Apr 2024 at 15:53.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Nuneaton Road

Warwickshire County Council are proposing to carry out Highway improvement works on Nuneaton Road, Furnace End, Over Whitacre.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 16 Apr 2024 at 15:53.

Warwickshire County Council logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Coton Road

Warwickshire County Council are proposing to carry out Highway improvement works on Coton Road, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 19 Apr 2024 at 08:50.

Cadent Gas logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Bishop Street

Cadent Gas are proposing to carry out Utility asset works on Bishop Street, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 15:40.

Severn Trent Water logo
Between
8 and 17 Jul 2024
Details
View Map
Share
Follow
Glendower Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Glendower Avenue, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 25 Apr 2024 at 15:19.

Cadent Gas logo
Between
8 and 22 Jul 2024
Details
View Map
Share
Follow
Swillington Road

Cadent Gas are proposing to carry out Utility asset works on Swillington Road, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 13:00.

Cadent Gas logo
Between
8 and 22 Jul 2024
Details
View Map
Share
Follow
Lydgate Road

Cadent Gas are proposing to carry out Utility asset works on Lydgate Road, Coventry.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 13:00.

Severn Trent Water logo
Between
15 and 26 Jul 2024
Details
View Map
Share
Follow
Shepherd Close

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shepherd Close, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Apr 2024 at 14:43.

Warwickshire County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Heath End Road

Warwickshire County Council are proposing to carry out Highway improvement works on Heath End Road, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 8 Apr 2024 at 10:52.

Warwickshire County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Bull Ring

Warwickshire County Council are proposing to carry out Highway improvement works on Bull Ring, Nuneaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 8 Apr 2024 at 10:54.

Warwickshire County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Greenmoor Road

Warwickshire County Council are proposing to carry out Highway improvement works on Greenmoor Road, Nuneaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 8 Apr 2024 at 10:49.

Vodafone logo
Between
22 and 29 Jul 2024
Details
View Map
Share
Follow
Dunchurch Highway

Vodafone are proposing to carry out Utility asset works on Dunchurch Highway, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 29 July 2024. The works will impact the verge only.

This roadwork event was last updated by Vodafone on 27 Apr 2024 at 20:27.

Severn Trent Water logo
Between
22 and 31 Jul 2024
Details
View Map
Share
Follow
Brownshill Green Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brownshill Green Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Apr 2024 at 21:05.

Severn Trent Water logo
Between
22 and 30 Jul 2024
Details
View Map
Share
Follow
Burnaby Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Burnaby Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 30 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Apr 2024 at 15:28.

Severn Trent Water logo
LONG TERM
Between
22 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Burnaby Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Burnaby Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 30 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Mar 2024 at 22:02.

Severn Trent Water logo
Between
22 and 30 Jul 2024
Details
View Map
Share
Follow
Holbrook Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holbrook Lane, Coventry.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Feb 2024 at 10:54.

Severn Trent Water logo
Between
22 and 25 Jul 2024
Details
View Map
Share
Follow
Wall Hill Road

Severn Trent Water are proposing to carry out New service connection on Wall Hill Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 25 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Apr 2024 at 13:20.

Severn Trent Water logo
Between
22 Jul and 6 Aug 2024
Details
View Map
Share
Follow
Grange Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grange Road, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 6 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 16 Mar 2024 at 20:16.

Cadent Gas logo
Between
23 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Ringwood Highway

Cadent Gas are proposing to carry out Utility asset works on Ringwood Highway, Coventry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 5 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 10:28.

BT logo
Between
23 and 31 Jul 2024
Details
View Map
Share
Follow
Vale View

BT are proposing to carry out New service connection on Vale View, Stockingford, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Apr 2024 at 16:33.

BT logo
Between
24 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Vale View

BT are proposing to carry out New service connection on Vale View, Stockingford, Nuneaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Apr 2024 at 13:00.


Roadworks Map near to Breach Oak Lane, COVENTRY, CV7 8AU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Apr 2024 19:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Breach Oak Lane, COVENTRY, CV7 8AU (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Coventry City Council logo
MAJOR
  
BENNETTS ROAD NORTH 
(0.8 miles)
Coventry City Council
Section 50 - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 15 Apr 2024 - 28 Jun 2024
0.8
Details
Share
Follow
2
Warwickshire County Council logo
MAJOR
  
GROVE LANE 
(0.9 miles)
Warwickshire County Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Multi-way signals
Planned
Scheduled: 15 Apr 2024 - 28 Jun 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.