ROADWORKS SUMMARY
Blue Pool Vale, SOUTHAM, CV47 2SH
Introduction

View current and future planned roadworks and road closures for Blue Pool Vale, CV47 2SH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Blue Pool Vale, SOUTHAM, CV47 2SH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Blue Pool Vale are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
13 Jun 2025
Warwickshire County Council are carrying out Highway improvement works on Moreton Morrell Lane, Lighthorne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 10:17 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 May 2025 at 14:16.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Fosse Way, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 10 Dec 2024 at 10:06.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:27.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:27.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Fosse Way, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:26.
24 Nov 2025
Severn Trent Water are carrying out Utility asset works on Southam Road, Napton-on-the-hill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 08:49 and could run through until 24 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 7 Apr 2025 at 08:53.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Poplar Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:55.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Hurst Road, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:44.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bridge End, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:41.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Wattons Lodge, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:45.
12 Jun 2025
Warwickshire County Council are carrying out Highway improvement works on Plough Lane, Bishops Itchington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 09:30 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 22 May 2025 at 09:51.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Horsewell, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:33.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Parkfields, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:32.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Old Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:53.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Heather Close, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:42.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Springfield Grove, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:35.
3 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Banbury Road, Gaydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 09:30 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 23 May 2025 at 12:50.
22 May and 25 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Wulfstan Drive, Long Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:28.
12 Jun 2025
Warwickshire County Council are carrying out Highway improvement works on Plough Lane, Harbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 09:30 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 22 May 2025 at 09:51.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Pineham Avenue, Harbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:39.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on St Michaels Close, Ufton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:26.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Manor Road, Harbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:38.
23 May and 26 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Berry Meadow, Fenny Compton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 Feb 2025 at 15:53.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on White Hart Lane, Ufton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 18 Mar 2025 at 10:25.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Welsh Road, Offchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:44.
23 May and 26 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Grants Close, Fenny Compton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 Feb 2025 at 15:51.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Central Drive, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:51.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Poplar Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:47.
23 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on St Michaels Close, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 09:49.
27 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Mountford Rise, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 Feb 2025 at 15:27.
27 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Mountford Rise, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 Feb 2025 at 15:29.
27 May and 27 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Old School Lane, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 Feb 2025 at 15:33.
Thursday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Napton-on-the-hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Mar 2025 at 09:11.
Thursday
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Vicarage Road, Napton-on-the-hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Jun 2025 at 07:56.
9 and 11 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on The Bank, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Mar 2025 at 09:01.
9 and 11 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on The Bank, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Apr 2025 at 11:15.
13 Jun and 11 Jul 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.
These works were categorised as Major.
The works were originally planned to start 13 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 24 Mar 2025 at 09:52.
13 Jun and 11 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Southam Road, Radford Semele.
These works are categorised as Major.
The works will start on or after 13 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Mar 2025 at 16:16.
16 and 20 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Farm Street, Harbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 17 Mar 2025 at 08:57.
18 and 20 Jun 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ladbroke Road, Bishops Itchington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 13:55.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ladbroke Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Mar 2025 at 11:59.
5 Jul and 5 Aug 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Napton-on-the-hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 July 2025 and run through until 5 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 12 May 2025 at 12:42.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Southam Road, Napton-on-the-hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 9 Apr 2025 at 16:34.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Radford Road, Radford Semele.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 1 May 2025 at 14:40.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Westfield Road, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 9 Apr 2025 at 16:39.
7 and 11 Jul 2025
Cadent Gas are proposing to carry out New service connection on Poplar Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 13:43.
11 Jul and 19 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Plough Lane, Harbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Apr 2025 at 16:11.
11 Jul and 19 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Plough Lane, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Apr 2025 at 10:40.
11 Jul and 19 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bishops Hill, Lighthorne Heath, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Apr 2025 at 10:38.
11 Jul and 19 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Chesterton Road, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Apr 2025 at 10:37.
15 and 17 Jul 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Bascote Road, Ufton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 May 2025 at 13:52.
18 Jul and 19 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Banbury Road, Gaydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Apr 2025 at 10:27.
28 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out New service connection on Poplar Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 14:25.
28 and 30 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stratford Road, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Mar 2025 at 11:38.
28 and 31 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Model Village, Long Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Apr 2025 at 15:59.
28 and 30 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stratford Road, Lighthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 31 Mar 2025 at 09:05.
31 Jul and 15 Sep 2025
Warwickshire County Council are proposing to carry out roadworks on Ufton Road, Harbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 2 May 2025 at 12:21.
20 and 22 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Radford Road, Offchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 20 May 2025 at 14:27.
Roadworks Map near to Blue Pool Vale, SOUTHAM, CV47 2SH (Loading...)








- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Blue Pool Vale, SOUTHAM, CV47 2SH (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
(Scheduled: 22 May 2025 - 12 Jun 2025)
(Scheduled: 22 May 2025 - 12 Jun 2025)