ROADWORKS SUMMARY
Elizabeth Close, STRATFORD-UPON-AVON, CV37 8FF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Elizabeth Close, CV37 8FF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Elizabeth Close, STRATFORD-UPON-AVON, CV37 8FF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Elizabeth Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Warwickshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are carrying out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 November 2024 at 09:30 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 4 Feb 2025 at 14:14.

Warwickshire County Council logo
LONG TERM
Between
19 Jan and 30 Nov 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 20 Aug 2024 at 10:07.

Network Rail logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Stratford Road

Network Rail were proposing to carry out Works for Rail Purposes on Stratford Road, Honeybourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 10:34.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Alcester Road

National Highways were proposing to carry out Highway improvement works on Alcester Road, Stratford-upon-avon.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Alcester Road

National Highways are proposing to carry out Highway improvement works on Alcester Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 15:29.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Birmingham Road

National Highways are proposing to carry out Highway improvement works on Birmingham Road, Bishopton Hill, Pathlow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 15:29.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Mickleton To Long Marston Road

Network Rail are proposing to carry out Works for Rail Purposes on Mickleton To Long Marston Road, Pebworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 14:09.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Mickleton To Long Marston Road

Network Rail are carrying out Works for Rail Purposes on Mickleton To Long Marston Road, Pebworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:30 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Feb 2025 at 08:25.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Long Marston Road

Network Rail are proposing to carry out Works for Rail Purposes on Long Marston Road, Long Marston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 15:50.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Long Marston Road

Network Rail are carrying out Works for Rail Purposes on Long Marston Road, Long Marston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:30 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Feb 2025 at 08:26.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Birmingham Road

National Highways were proposing to carry out Highway improvement works on Birmingham Road, Bishopton Hill, Pathlow.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:29.

Warwickshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Southern Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Southern Lane, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 7 Nov 2024 at 15:55.

Warwickshire County Council logo
LONG TERM
Between
10 Feb and 26 Apr 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 11:25.

Western Power Distribution (West Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Bull Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Bull Street, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Dec 2024 at 10:31.

Western Power Distribution (West Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Bull Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Bull Street, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Dec 2024 at 10:26.

Gloucestershire County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
High Street

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on High Street, Mickleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gloucestershire County Council on 11 Nov 2024 at 15:00.

Warwickshire County Council logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Barton Road

Warwickshire County Council are proposing to carry out roadworks on Barton Road, Welford-on-avon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 5 Dec 2024 at 11:35.

Gloucestershire County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
High Street

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on High Street, Mickleton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gloucestershire County Council on 21 Nov 2024 at 08:10.

Warwickshire County Council logo
LONG TERM
Between
24 Feb and 9 Nov 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 20 Jan 2025 at 12:34.

Wales And West Utilities logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Salford Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Salford Road, Marriage Hill, Bidford-on-avon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 8 Jan 2025 at 12:36.

Warwickshire County Council logo
LONG TERM
Between
24 Feb and 9 Nov 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 18 Nov 2024 at 16:33.

Severn Trent Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ryknild Street

Severn Trent Water are proposing to carry out New service connection on Ryknild Street, Wixford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:25.

Severn Trent Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ryknild Street

Severn Trent Water are proposing to carry out New service connection on Ryknild Street, Wixford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 14:49.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Buckle Street

BT are proposing to carry out Utility repair and maintenance works on Buckle Street, Honeybourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Dec 2024 at 12:22.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Blakes Hill

BT are proposing to carry out Utility repair and maintenance works on Blakes Hill, Ullington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Feb 2025 at 11:30.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Blakes Hill

BT are proposing to carry out Utility repair and maintenance works on Blakes Hill, Ullington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Jan 2025 at 10:08.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Blakes Hill

BT are proposing to carry out Utility repair and maintenance works on Blakes Hill, Ullington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Dec 2024 at 12:01.

BT logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Buckle Street

BT are proposing to carry out Utility repair and maintenance works on Buckle Street, Honeybourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Jan 2025 at 14:33.

Severn Trent Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
West Green Drive

Severn Trent Water are proposing to carry out New service connection on West Green Drive, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 6 Feb 2025 at 12:34.

BT logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Buckle Street

BT were proposing to carry out Utility repair and maintenance works on Buckle Street, Honeybourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Jan 2025 at 15:41.

Warwickshire County Council logo
LONG TERM
Between
1 Apr 2025 and 30 Apr 2026
Details
View Map
Share
Follow
High Street

Warwickshire County Council are proposing to carry out roadworks on High Street, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 April 2026. The works will impact the carriageway and footpath.

This roadwork event was last updated by Warwickshire County Council on 8 Jan 2025 at 16:18.

Warwickshire County Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Lower Haselor Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Lower Haselor Lane, Haselor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 7 Jan 2025 at 15:56.

Warwickshire County Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Lower Haselor Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Lower Haselor Lane, Haselor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 13 Feb 2025 at 10:22.

Warwickshire County Council logo
Between
14 and 22 Apr 2025
Details
View Map
Share
Follow
Clifford Road

Warwickshire County Council are proposing to carry out Highway improvement works on Clifford Road, Clifford Chambers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 3 Jan 2025 at 10:09.

Warwickshire County Council logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Campden Road

Warwickshire County Council are proposing to carry out Highway improvement works on Campden Road, Clifford Chambers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 3 Jan 2025 at 10:02.

BT logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Buckle Street

BT were proposing to carry out Utility repair and maintenance works on Buckle Street, Honeybourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Jan 2025 at 15:41.

BT logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Buckle Street

BT are proposing to carry out Utility repair and maintenance works on Buckle Street, Honeybourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Jan 2025 at 08:15.

BT logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Buckle Street

BT are proposing to carry out Utility repair and maintenance works on Buckle Street, Honeybourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 21 Jan 2025 at 11:45.

Western Power Distribution (West Midlands) logo
Between
15 and 19 Apr 2025
Details
View Map
Share
Follow
Back Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Back Lane, Lower Quinton, Quinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 19 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 15:16.

Severn Trent Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Village Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Village Road, Preston-on-stour.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Feb 2025 at 11:27.

Severn Trent Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Village Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Village Road, Preston-on-stour.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Jan 2025 at 14:44.

Severn Trent Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
West Green Drive

Severn Trent Water are proposing to carry out New service connection on West Green Drive, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 28 Jan 2025 at 15:35.

Severn Trent Water logo
Between
22 and 24 Apr 2025
Details
View Map
Share
West Green Drive

Severn Trent Water were proposing to carry out New service connection on West Green Drive, Stratford-upon-avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 24 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 Jan 2025 at 09:54.

Warwickshire County Council logo
Between
5 and 13 May 2025
Details
View Map
Share
Follow
Village Road

Warwickshire County Council are proposing to carry out Highway improvement works on Village Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 4 Feb 2025 at 14:06.

Western Power Distribution (West Midlands) logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Aston Cantlow Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Aston Cantlow Road, Wilmcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Jan 2025 at 11:36.

Severn Trent Water logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Wixford Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wixford Road, Wixford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2025 at 13:00.

Severn Trent Water logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Blakes Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Blakes Hill, North Littleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Feb 2025 at 15:09.


Roadworks Map near to Elizabeth Close, STRATFORD-UPON-AVON, CV37 8FF (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 17 Feb 2025 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Elizabeth Close, STRATFORD-UPON-AVON, CV37 8FF (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Warwickshire County Council logo
BARTON ROAD 
(0.2 miles)
Warwickshire County Council
Section 50 - Carriageway, Verge - Two-way signals
Planned
Scheduled: 17 Feb 2025 - 21 Feb 2025
0.2
Details
Share
Follow
2
Warwickshire County Council logo
MAJOR
  
BARTON ROAD 
(0.3 miles)
Warwickshire County Council
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Verge - Two-way signals
Planned
Scheduled: 17 Feb 2025 - 8 Mar 2025
0.3
Details
Share
Follow
3
Severn Trent Water logo
URGENT
  
BINTON ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 12 Feb 2025 16:00
(Scheduled: 12 Feb 2025 - 18 Feb 2025)
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.