ROADWORKS SUMMARY
Stourton, SHIPSTON-ON-STOUR, CV36 5JA
Introduction

View current and future planned roadworks and road closures for CV36 5JA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Stourton, SHIPSTON-ON-STOUR, CV36 5JA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Friday
Cadent Gas are proposing to carry out Utility asset works on Church Street, Shipston-on-stour.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:47.
Wednesday
Warwickshire County Council are proposing to carry out Highway improvement works on Moreton In Marsh Road, Great Wolford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 12 Dec 2024 at 15:19.
Tomorrow
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Friars Lane, Brailes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 March 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 11:08.
Friday
BT are proposing to carry out Utility asset works on Whichford Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 17 Dec 2024 at 14:02.
Friday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Village Road, Stourton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Jan 2025 at 12:34.
Wednesday
BT are proposing to carry out Utility asset works on Barrats Hill, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Dec 2024 at 14:35.
27 Mar and 4 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Whichford Road, Stourton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Jan 2025 at 16:22.
27 and 31 Mar 2025
BT are proposing to carry out Utility asset works on Long Compton Road, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 31 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 16 Dec 2024 at 15:11.
27 and 31 Mar 2025
BT are proposing to carry out Utility asset works on Long Compton Road, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 31 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 23 Dec 2024 at 13:06.
31 Mar and 4 Apr 2025
Thames Water are proposing to carry out New service connection on Station Road, Hook Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 20 Feb 2025 at 16:02.
31 Mar and 4 Apr 2025
Thames Water are proposing to carry out New service connection on Station Road, Hook Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 10:08.
31 Mar and 4 Apr 2025
BT are proposing to carry out Utility asset works on Ascott Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 3 Jan 2025 at 12:38.
1 and 4 Apr 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Darlingscote Road, Shipston-on-stour.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 13 Mar 2025 at 12:36.
2 and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Temple Mill Lane, Hook Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Jan 2025 at 10:51.
7 and 11 Apr 2025
Thames Water are proposing to carry out New service connection on Station Road, Hook Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 10 Mar 2025 at 13:07.
7 and 11 Apr 2025
Thames Water are proposing to carry out New service connection on Station Road, Hook Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 10:59.
9 and 11 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Back Lane, Long Compton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Feb 2025 at 11:42.
9 and 11 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Back Lane, Long Compton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Jan 2025 at 12:38.
9 and 15 Apr 2025
BT are proposing to carry out Utility asset works on Ascott Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 20 Feb 2025 at 10:54.
9 and 15 Apr 2025
BT are proposing to carry out Utility asset works on Ascott Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 4 Feb 2025 at 14:24.
16 and 22 Apr 2025
BT are proposing to carry out Utility asset works on Whichford Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 9 Jan 2025 at 13:53.
16 and 22 Apr 2025
BT are proposing to carry out Utility asset works on Whichford Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 20 Feb 2025 at 10:55.
22 Apr and 2 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Whichford Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 15:28.
22 Apr and 2 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Ascott Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 15:27.
23 Apr and 2 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Whichford Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Mar 2025 at 14:23.
23 Apr and 2 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Whichford Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Feb 2025 at 09:54.
23 Apr and 2 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Ascott Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Mar 2025 at 13:10.
23 Apr and 2 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Ascott Road, Ascott, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Feb 2025 at 09:55.
24 and 28 Apr 2025
BT were proposing to carry out Utility asset works on Old Hill, Long Compton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 April 2025 and run through until 28 April 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 21 Feb 2025 at 14:42.
24 and 28 Apr 2025
BT are proposing to carry out Utility asset works on Road From The A44 To The Rollright Stones, Salford, Chipping Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 28 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 18 Feb 2025 at 09:24.
28 Apr and 31 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Honington Hall Road, Honington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 31 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Jan 2025 at 14:33.
28 Apr and 30 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Idlicote Road, Honington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Jan 2025 at 14:29.
28 Apr and 9 May 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Road From Todenham Road To A3400, Todenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Feb 2025 at 15:19.
13 and 16 May 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Darlingscote Road, Shipston-on-stour.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 13 Feb 2025 at 15:22.
14 and 18 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Hook Norton Road, Sibford Ferris.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Feb 2025 at 11:09.
14 and 18 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Main Street, Sibford Ferris.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 26 Feb 2025 at 11:10.
14 and 18 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Swalcliffe To Sibford, Swalcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 19 Feb 2025 at 14:56.
14 and 17 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed--single Carriageway (43611177), West Oxfordshire.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 25 Feb 2025 at 13:33.
15 and 18 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Shutford Road To Epwell Village, Epwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 28 Feb 2025 at 13:10.
15 and 18 May 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Shutford Road, Epwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 28 Feb 2025 at 13:11.
26 and 28 May 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Woodway Road, Sibford Ferris.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 28 May 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 10:29.
2 and 4 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Green Lane, Shipston-on-stour.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Mar 2025 at 10:14.
2 and 4 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Barrats Hill, Whichford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 7 Mar 2025 at 16:37.
9 and 11 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Woodway Road, Sibford Ferris.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 13:56.
9 and 11 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bells Lane, Hook Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 07:58.
10 and 12 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Henbrook Lane, Brailes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 24 Feb 2025 at 15:28.
10 and 12 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Henbrook Lane, Brailes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 10:01.
13 Jun and 11 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Barton On Heath Road, Great Wolford.
These works are categorised as Major.
The works will start on or after 13 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Mar 2025 at 15:32.
Roadworks Map near to Stourton, SHIPSTON-ON-STOUR, CV36 5JA
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Stourton, SHIPSTON-ON-STOUR, CV36 5JA (1 Events)