ROADWORKS SUMMARY
Long Itchington Road, LEAMINGTON SPA, CV33 9AZ
Introduction
View current and future planned roadworks and road closures for Long Itchington Road, CV33 9AZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Long Itchington Road, LEAMINGTON SPA, CV33 9AZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Long Itchington Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Tachbrook Park Drive, Warwick.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 09:01.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Queensway, Leamington Spa.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:24.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Europa Way, Warwick.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:20 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:23.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Europa Way, Warwick.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:24.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Old Warwick Road, Leamington Spa.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:20 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:26.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Myton Road, Warwick.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 09:01.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Myton Road, Leamington Spa.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:30 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:25.
4 Jul 2025
Warwickshire County Council are carrying out Highway improvement works on Princes Drive, Leamington Spa.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:20 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:25.
31 May 2024 and 1 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Emscote Road, Portobello, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 20 Dec 2022 at 10:34.
Wednesday
Severn Trent Water are carrying out Utility asset works on Campion Road, Leamington Spa.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 09:15 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 13:21.
Wednesday
Severn Trent Water are carrying out Utility asset works on Lillington Avenue, Leamington Spa.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 July 2024 at 08:00 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 09:13.
3 Mar 2025
Warwickshire County Council are carrying out Highway improvement works on Cycleway From Europa Way Bridge To Queensway, Leamington Spa.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 5 September 2024 at 09:30 and could run through until 3 March 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Warwickshire County Council on 28 Nov 2024 at 13:30.
8 Nov 2024 and 7 Mar 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Saumur Way, Warwick.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Aug 2024 at 12:56.
Friday
Severn Trent Water are carrying out Utility asset works on Kenilworth Road, Leamington Spa.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 09:15 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 08:49.
Today
Warwickshire County Council are carrying out Section 50 on Harbury Lane, Bishops Tachbrook.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 2 Dec 2024 at 09:18.
18 Nov 2024 and 9 May 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Europa Way, Warwick.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 9 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 16 Oct 2024 at 08:30.
20 Jan 2025
Severn Trent Water are carrying out Utility asset works on Station Approach East, Leamington Spa.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Dec 2024 at 10:28.
16 Dec 2024 and 3 Feb 2025
Severn Trent Water were proposing to carry out Utility asset works on Heemstede Lane, Leamington Spa.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 11:07.
Wednesday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ladbroke Road, Ladbroke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 09:35.
Wednesday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ladbroke Road, Ladbroke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 11:03.
6 Jan and 4 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Binswood Avenue, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2023 at 14:38.
6 and 24 Jan 2025
Severn Trent Water were proposing to carry out Utility asset works on Fosse Way, Stretton-on-dunsmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 11:17.
Friday
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Princes Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 10:03.
8 and 16 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Ladbroke Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Oct 2024 at 10:58.
Friday
Cadent Gas are proposing to carry out New service connection on Ledbrook Road, Cubbington, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 17:11.
8 and 14 Jan 2025
Cadent Gas are proposing to carry out New service connection on Ledbrook Road, Cubbington, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:09.
13 and 31 Jan 2025
Murphy Gas Networks are proposing to carry out Utility asset works on Welsh Road East, Southam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Gas Networks on 15 Oct 2024 at 10:23.
13 and 17 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on White Hart Lane, Ufton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 Oct 2024 at 11:30.
13 and 17 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on White Hart Lane, Ufton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Nov 2024 at 15:17.
13 and 31 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on John Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Oct 2024 at 15:48.
13 and 31 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on John Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 14 Nov 2024 at 15:15.
13 and 28 Jan 2025
BT were proposing to carry out Utility asset works on Stoneleigh Road, Ashow.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 21 Oct 2024 at 14:21.
13 and 28 Jan 2025
BT were proposing to carry out Utility asset works on Stoneleigh Road, Stoneleigh.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 21 Oct 2024 at 14:23.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knob Hill, Stretton-on-dunsmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 10:17.
13 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Knob Hill, Stretton-on-dunsmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 15:30.
14 and 16 Jan 2025
Severn Trent Water are proposing to carry out Remedial works on Napton Road, Leamington Hastings.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 11:40.
15 and 23 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Ladbroke Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Oct 2024 at 11:13.
15 and 23 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Ladbroke Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Oct 2024 at 14:24.
16 and 18 Jan 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Wappenbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 17 Sep 2024 at 14:51.
16 and 18 Jan 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Leamington Road, Wappenbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 18 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Nov 2024 at 08:53.
20 Jan and 7 Feb 2025
Murphy Gas Networks are proposing to carry out Utility asset works on Welsh Road East, Southam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Gas Networks on 23 Oct 2024 at 14:22.
20 Jan and 7 Feb 2025
Murphy Gas Networks are proposing to carry out Utility asset works on Welsh Road East, Southam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Gas Networks on 5 Nov 2024 at 16:19.
20 Jan and 11 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Footpath From Coventry Street To Welsh Road West, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footpath only.
This roadwork event was last updated by Warwickshire County Council on 17 Oct 2024 at 12:00.
20 Jan and 11 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Footpath From Coventry Street To Welsh Road West, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 11 February 2025. The works will impact the footpath only.
This roadwork event was last updated by Warwickshire County Council on 27 Nov 2024 at 10:35.
20 Jan and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Fosse Way, Stretton-on-dunsmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 15:00.
22 and 29 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Old Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Oct 2024 at 11:12.
22 and 29 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out Diversionary works on Old Road, Bishops Itchington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Oct 2024 at 14:25.
27 Jan and 17 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Arlington Avenue, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 10:18.
27 and 29 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Marton Road, Birdingbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 15:08.
27 Jan and 11 Feb 2025
BT are proposing to carry out Utility asset works on Stoneleigh Road, Ashow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 31 Oct 2024 at 15:49.
27 Jan and 11 Feb 2025
BT are proposing to carry out Utility asset works on Stoneleigh Road, Ashow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Dec 2024 at 15:58.
27 Jan and 11 Feb 2025
BT are proposing to carry out Utility asset works on Stoneleigh Road, Stoneleigh.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Dec 2024 at 16:00.
27 Jan and 11 Feb 2025
BT are proposing to carry out Utility asset works on Stoneleigh Road, Stoneleigh.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 31 Oct 2024 at 15:50.
28 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Myton Crescent, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 09:44.
28 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Myton Crescent, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 11:02.
1 and 9 Feb 2025
Nexfibre Networks Limited were proposing to carry out Utility asset works on Dormer Place, Leamington Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 9 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 21 Oct 2024 at 16:24.
1 and 9 Feb 2025
Nexfibre Networks Limited were proposing to carry out Utility asset works on Portland Place East, Leamington Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 9 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 21 Oct 2024 at 16:24.
1 and 9 Feb 2025
Nexfibre Networks Limited were proposing to carry out Utility asset works on Adelaide Road, Leamington Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 9 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 21 Oct 2024 at 16:24.
3 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Fosse Way, Stretton-on-dunsmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 11:51.
3 and 24 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Orchard Way, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 10:59.
3 and 24 Feb 2025
Electricity Network Company were proposing to carry out Utility asset works on Orchard Way, Stretton-on-dunsmore.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 16:35.
3 and 24 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Orchard Way, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 09:51.
3 and 24 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Orchard Way, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 10:58.
3 and 24 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Orchard Way, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 3 Dec 2024 at 11:43.
3 and 24 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Plott Lane, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 12 Nov 2024 at 10:58.
3 and 24 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Plott Lane, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 3 Dec 2024 at 11:43.
5 and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Daventry Street, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 15:30.
5 and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Daventry Street, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 12:39.
5 and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:23.
5 and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:51.
5 and 7 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Fosse Way, Princethorpe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 13:16.
10 and 14 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Welsh Road East, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 12:20.
10 and 14 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Welsh Road East, Southam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 12:23.
10 and 21 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on School Lane, Stretton-on-dunsmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 08:52.
11 and 13 Feb 2025
Severn Trent Water are proposing to carry out Remedial works on Murcott Road East, Whitnash, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:21.
11 and 13 Feb 2025
Severn Trent Water are proposing to carry out Remedial works on Murcott Road East, Whitnash, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 11:34.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Russell Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 12:17.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Russell Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 16:05.
14 Feb and 5 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Hazel Close, Leamington Spa.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:34.
17 Feb and 7 Mar 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Welsh Road East, Southam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 12 Nov 2024 at 15:15.
17 Feb and 7 Mar 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Welsh Road East, Southam.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 27 Nov 2024 at 11:07.
17 and 21 Feb 2025
Severn Trent Water were proposing to carry out New service connection on Welsh Road East, Southam.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 08:35.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grove Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 12:25.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grove Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 16:10.
17 and 20 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Lillington Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 12 Aug 2024 at 11:45.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out New service connection on Ledbrook Road, Cubbington, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 15:21.
18 and 21 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Fosse Way, Princethorpe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 12:20.
19 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Draycote Road, Draycote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 15:31.
19 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Draycote Road, Draycote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 14:30.
24 and 28 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on White Hart Lane, Ufton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 Nov 2024 at 11:00.
24 and 26 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Mount Pleasant, Stockton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Dec 2024 at 10:12.
24 and 26 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Mount Pleasant, Stockton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Dec 2024 at 11:21.
24 and 26 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stockton Road, Stockton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Dec 2024 at 12:25.
24 and 27 Feb 2025
Cadent Gas are proposing to carry out New service connection on Leamington Hastings Road, Birdingbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:11.
26 and 28 Feb 2025
BT are proposing to carry out New service connection on Gordon Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 26 Nov 2024 at 12:21.
26 and 28 Feb 2025
BT were proposing to carry out New service connection on Gordon Street, Leamington Spa.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 13:32.
1 Mar and 15 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Myton Lane, Warwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 14:34.
1 Mar and 15 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Bennett Drive, Warwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 14:34.
1 Mar and 15 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Ward Grove, Warwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 14:34.
3 and 25 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Gallows Hill, Warwick.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 14:29.
3 and 5 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Remedial works on Tachbrook Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Dec 2024 at 12:42.
3 and 5 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Suffolk Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 11:12.
3 and 5 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Suffolk Street, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Dec 2024 at 17:01.
3 and 14 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Frankton Road, Birdingbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 4 Dec 2024 at 14:55.
3 and 14 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Birdingbury Road, Frankton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 4 Dec 2024 at 14:54.
4 and 6 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tuckwell Close, Stockton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 09:21.
10 and 21 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Europa Way, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 14:16.
10 and 21 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Europa Way, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 14:15.
10 and 21 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Tachbrook Park Drive, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 14:13.
10 and 21 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Queensway, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 14:15.
10 and 13 Mar 2025
Cadent Gas are proposing to carry out New service connection on Leamington Hastings Road, Birdingbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 12:40.
11 and 13 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stockton Road, Stockton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Dec 2024 at 10:17.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Fosse Way, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:26.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:27.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:27.
16 Mar and 14 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Fosse Way, Radford Semele.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 10 Dec 2024 at 10:06.
17 and 20 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Fosse Way, Princethorpe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 14:38.
17 Mar and 7 Apr 2025
Electricity Network Company are proposing to carry out Utility asset works on Orchard Way, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 20 Dec 2024 at 14:01.
17 Mar and 7 Apr 2025
Electricity Network Company are proposing to carry out Utility asset works on Plott Lane, Stretton-on-dunsmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 20 Dec 2024 at 14:02.
18 and 20 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Street, Harbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 11:37.
18 and 20 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Street, Harbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 12:04.
24 Mar and 4 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on School Lane, Stretton-on-dunsmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 10:09.
1 and 3 Apr 2025
Cadent Gas are proposing to carry out Remedial works on Lillington Road, Leamington Spa.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:48.
3 and 23 Apr 2025
GTC Pipelines are proposing to carry out New service connection on Gallows Hill, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 23 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 5 Dec 2023 at 10:09.
3 and 23 Apr 2025
GTC Pipelines are proposing to carry out New service connection on Gallows Hill, Warwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 23 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 16 Jan 2024 at 09:51.
4 and 24 Apr 2025
GTC Pipelines were proposing to carry out Utility asset works on Europa Way, Warwick.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 April 2025 and run through until 24 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by GTC Pipelines on 11 Oct 2024 at 11:14.
Roadworks Map near to Long Itchington Road, LEAMINGTON SPA, CV33 9AZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Long Itchington Road, LEAMINGTON SPA, CV33 9AZ (6 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.