ROADWORKS SUMMARY
Whitnash Road, LEAMINGTON SPA, CV31 2HT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Whitnash Road, CV31 2HT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Whitnash Road, LEAMINGTON SPA, CV31 2HT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Whitnash Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Warwickshire County Council logo
LONG TERM
Between
8 Jan 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Keytes Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Keytes Lane, Barford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 8 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Warwickshire County Council on 20 Sep 2024 at 11:29.

Warwickshire County Council logo
LONG TERM
Between
16 Mar and 14 Sep 2025
Details
View Map
Share
Fosse Way

Warwickshire County Council were proposing to carry out Highway improvement works on Fosse Way, Radford Semele.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:26.

Warwickshire County Council logo
LONG TERM
Between
16 Mar and 14 Sep 2025
Details
View Map
Share
Southam Road

Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:27.

Warwickshire County Council logo
LONG TERM
Between
16 Mar and 14 Sep 2025
Details
View Map
Share
Southam Road

Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Radford Semele.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 11 Dec 2024 at 07:27.

Warwickshire County Council logo
LONG TERM
Between
16 Mar and 14 Sep 2025
Details
View Map
Share
Fosse Way

Warwickshire County Council were proposing to carry out Highway improvement works on Fosse Way, Radford Semele.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 March 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 10 Dec 2024 at 10:06.

Warwickshire County Council logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are carrying out Highway improvement works on Banbury Road, Bishops Tachbrook.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 5 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 7 Jul 2025 at 16:02.

Warwickshire County Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are carrying out Highway improvement works on Banbury Road, Bishops Tachbrook.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 7 Aug 2025 at 11:32.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 May and 10 Sep 2025
Details
View Map
Share
Tachbrook Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Tachbrook Road, Leamington Spa.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 12:39.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 May and 10 Sep 2025
Details
View Map
Share
Wise Street

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Wise Street, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 12:39.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 May and 10 Sep 2025
Details
View Map
Share
High Street

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on High Street, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 12 Jun 2025 at 12:40.

Warwickshire County Council logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Europa Way

Warwickshire County Council were proposing to carry out Highway improvement works on Europa Way, Warwick.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 30 Oct 2024 at 14:50.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
23 Jun and 23 Oct 2025
Details
View Map
Share
Myton Road

Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Myton Road, Warwick.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 23 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 29 Jul 2025 at 13:07.

Severn Trent Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Cherry Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cherry Lane, Budbrooke.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Jul 2025 at 08:32.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Warwick New Road

Cadent Gas were proposing to carry out Utility asset works on Warwick New Road, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 September 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 11:42.

LONG TERM
Between
30 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Stoneleigh Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Harlaxton Energy Networks on 22 May 2025 at 11:23.

Western Power Distribution (East Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
High Street

Western Power Distribution (East Midlands) are carrying out Utility asset works on High Street, Leamington Spa.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2025 at 08:37 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 11:06.

Warwickshire County Council logo
LONG TERM
Between
4 Aug 2025 and 10 Apr 2026
Details
View Map
Share
Europa Way

Warwickshire County Council were proposing to carry out Highway improvement works on Europa Way, Warwick.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 10 April 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 14 May 2025 at 10:34.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Stratford Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Stratford Road, Warwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 May 2025 at 12:02.

Severn Trent Water logo
LONG TERM
Between
8 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Cherry Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cherry Lane, Budbrooke.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Aug 2025 at 14:49.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cherry Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Cherry Lane, Budbrooke.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Aug 2025 at 15:11.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
17 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Bury Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Bury Road, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Mar 2025 at 16:25.

Western Power Distribution (East Midlands) logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Bury Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Bury Road, Leamington Spa.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2025 at 08:35 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Aug 2025 at 09:41.

Warwickshire County Council logo
LONG TERM
Between
18 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are proposing to carry out Highway improvement works on Banbury Road, Bishops Tachbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 30 Jun 2025 at 11:28.

Western Power Distribution (East Midlands) logo
Finishing
Sunday
Details
View Map
Share
Follow
Tachbrook Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tachbrook Road, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 May 2025 at 11:35.

Western Power Distribution (East Midlands) logo
Finishing
Sunday
Details
View Map
Share
Follow
Tachbrook Road

Western Power Distribution (East Midlands) are carrying out Utility asset works on Tachbrook Road, Leamington Spa.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 18:30 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Aug 2025 at 09:16.

Warwickshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Adelaide Road

Warwickshire County Council were proposing to carry out Highway improvement works on Adelaide Road, Leamington Spa.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Jul 2025 at 12:42.

Warwickshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clarendon Avenue

Warwickshire County Council are proposing to carry out Highway improvement works on Clarendon Avenue, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 11 Jun 2025 at 14:18.

Between
21 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Stoneleigh Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 9 Jun 2025 at 15:40.

Warwickshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Footpaths From Oaktree Close

Warwickshire County Council are proposing to carry out Highway improvement works on Footpaths From Oaktree Close, Moreton Morrell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 5 September 2025. The works will impact the footpath only.

This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 10:15.

Warwickshire County Council logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are carrying out Highway improvement works on Banbury Road, Bishops Tachbrook.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:30 and could run through until 19 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 26 Aug 2025 at 10:59.

Cadent Gas logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Radford Road

Cadent Gas were proposing to carry out Utility asset works on Radford Road, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 May 2025 at 10:59.

Cadent Gas logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Radford Road

Cadent Gas were proposing to carry out Utility asset works on Radford Road, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 10:15.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on High Street, Warwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 4 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 11:56.

Severn Trent Water logo
LONG TERM
Between
1 Sep and 28 Nov 2025
Details
View Map
Share
Woodway Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Woodway Avenue, Budbrooke.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 31 Jul 2025 at 09:33.

Cadent Gas logo
LONG TERM
Between
1 Sep and 20 Oct 2025
Details
View Map
Share
Warwick Place

Cadent Gas were proposing to carry out Utility asset works on Warwick Place, Leamington Spa.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 11:52.

Telefonica UK logo
Finishing
Tomorrow
Details
View Map
Share
Scar Bank

Telefonica UK were proposing to carry out Utility asset works on Scar Bank, Warwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 4 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 20 Jun 2025 at 10:21.

Telefonica UK logo
Finishing
Friday
Details
View Map
Share
Follow
Scar Bank

Telefonica UK are proposing to carry out Utility asset works on Scar Bank, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 26 Jun 2025 at 14:48.

Telefonica UK logo
Finishing
Friday
Details
View Map
Share
Follow
Scar Bank

Telefonica UK are carrying out Utility asset works on Scar Bank, Warwick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 18:00 and could run through until 5 September 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 2 Sep 2025 at 07:09.

Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Stoneleigh Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 2 Jul 2025 at 15:15.

Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Stoneleigh Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Stoneleigh Road, Blackdown.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 11 Jul 2025 at 16:54.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Nelson Lane

Severn Trent Water are proposing to carry out New service connection on Nelson Lane, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Jun 2025 at 14:50.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Nelson Lane

Severn Trent Water are carrying out New service connection on Nelson Lane, Warwick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:51 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 09:55.

Warwickshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Lewis Road

Warwickshire County Council are proposing to carry out Highway improvement works on Lewis Road, Radford Semele.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 18 Jun 2025 at 14:48.

Warwickshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Lewis Road

Warwickshire County Council are proposing to carry out Highway improvement works on Lewis Road, Radford Semele.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Aug 2025 at 11:03.

Warwickshire County Council logo
LONG TERM
Between
8 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Ufton Road

Warwickshire County Council are proposing to carry out roadworks on Ufton Road, Harbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 29 Aug 2025 at 08:47.

Cadent Gas logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Leycester Place

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Leycester Place, Warwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 11 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 11:10.

Severn Trent Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Radford Road

Severn Trent Water are proposing to carry out New service connection on Radford Road, Offchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 13 Jun 2025 at 15:03.

BT logo
Between
15 and 24 Sep 2025
Details
View Map
Share
Follow
Harbury Lane

BT are proposing to carry out Utility asset works on Harbury Lane, Bishops Tachbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 24 September 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 7 Apr 2025 at 15:44.

Cadent Gas logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
The Approach

Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Approach, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 15:34.

Cadent Gas logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Leycester Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Leycester Place, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Aug 2025 at 09:09.

Cadent Gas logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
The Butts

Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Butts, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 14:42.

Warwickshire County Council logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Clarendon Street

Warwickshire County Council are proposing to carry out Highway improvement works on Clarendon Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 14 May 2025 at 15:20.

Warwickshire County Council logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Clarendon Street

Warwickshire County Council are proposing to carry out Highway improvement works on Clarendon Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 12 Aug 2025 at 16:54.

Cadent Gas logo
LONG TERM
Between
22 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Offchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Offchurch Lane, Radford Semele.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:31.

Cadent Gas logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 14:29.

Cadent Gas logo
Between
22 and 25 Sep 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on High Street, Warwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 08:16.

Telefonica UK logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Scar Bank

Telefonica UK were proposing to carry out Utility asset works on Scar Bank, Warwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 20 Jun 2025 at 10:27.

Telefonica UK logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Scar Bank

Telefonica UK are proposing to carry out Utility asset works on Scar Bank, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 26 Jun 2025 at 14:52.

Telefonica UK logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Scar Bank

Telefonica UK are proposing to carry out Utility asset works on Scar Bank, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 12 Aug 2025 at 10:02.

Warwickshire County Council logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
Leicester Street

Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 12:27.

Warwickshire County Council logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
Leicester Street

Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 12 Aug 2025 at 16:52.

Severn Trent Water logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Bascote Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bascote Road, Ufton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Jun 2025 at 08:49.

Severn Trent Water logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Bascote Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bascote Road, Ufton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Jun 2025 at 08:52.

Warwickshire County Council logo
Between
28 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 12:28.

Warwickshire County Council logo
Between
28 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 13 Aug 2025 at 10:49.

Warwickshire County Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Bishops Tachbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 14 May 2025 at 10:06.

Warwickshire County Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Bishops Tachbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 13 Aug 2025 at 10:50.

Warwickshire County Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 12:29.

Warwickshire County Council logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 13 Aug 2025 at 10:51.

Cadent Gas logo
Between
29 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Wise Terrace

Cadent Gas are proposing to carry out New service connection on Wise Terrace, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 13:51.

Cadent Gas logo
Between
29 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Wise Terrace

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wise Terrace, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 12:48.

Cadent Gas logo
Between
29 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Wise Terrace

Cadent Gas are proposing to carry out New service connection on Wise Terrace, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 10:35.

Severn Trent Water logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Sandy Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Aug 2025 at 10:45.

Cadent Gas logo
LONG TERM
Between
1 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Offchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Offchurch Lane, Radford Semele.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 14:36.

Warwickshire County Council logo
Between
2 and 4 Oct 2025
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are proposing to carry out Highway improvement works on Banbury Road, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 25 Jun 2025 at 16:13.

Warwickshire County Council logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Harbury Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Harbury Lane, Bishops Tachbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 12:45.

Severn Trent Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Stratford Road

Severn Trent Water are proposing to carry out New service connection on Stratford Road, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 22 Jul 2025 at 13:48.

Severn Trent Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Stratford Road

Severn Trent Water are proposing to carry out New service connection on Stratford Road, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 Jul 2025 at 12:13.

Cadent Gas logo
LONG TERM
Between
6 Oct and 16 Dec 2025
Details
View Map
Share
Follow
Tachbrook Road

Cadent Gas are proposing to carry out Utility asset works on Tachbrook Road, Whitnash, Leamington Spa.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:04.

Cadent Gas logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 15:00.

Cadent Gas logo
Between
6 and 10 Oct 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Disconnection or alteration of supply on High Street, Warwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 09:00.

Severn Trent Water logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Cherry Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cherry Lane, Budbrooke.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 15:54.

Warwickshire County Council logo
LONG TERM
Between
6 Oct 2025 and 30 Jan 2026
Details
View Map
Share
Follow
St Johns

Warwickshire County Council are proposing to carry out Highway improvement works on St Johns, Coten End, Warwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 17 Jul 2025 at 15:25.

Cadent Gas logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
The Butts

Cadent Gas are proposing to carry out Disconnection or alteration of supply on The Butts, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 11:52.

Cadent Gas logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Radford Road

Cadent Gas were proposing to carry out Utility asset works on Radford Road, Leamington Spa.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 09:44.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Guys Cliffe Road

Cadent Gas were proposing to carry out Utility asset works on Guys Cliffe Road, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 11:58.

Severn Trent Water logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Holly Walk

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holly Walk, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Jun 2025 at 15:56.

Severn Trent Water logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Holly Walk

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Holly Walk, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Jul 2025 at 12:26.

Warwickshire County Council logo
LONG TERM
Between
13 Oct 2025 and 27 Feb 2026
Details
View Map
Share
Follow
St Johns

Warwickshire County Council are proposing to carry out Highway improvement works on St Johns, Coten End, Warwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 12 Aug 2025 at 11:30.

Western Power Distribution (East Midlands) logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Sandy Lane

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Sandy Lane, Blackdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Jul 2025 at 14:48.

Western Power Distribution (East Midlands) logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Sandy Lane

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Sandy Lane, Blackdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Aug 2025 at 11:33.

Severn Trent Water logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Heath Terrace

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heath Terrace, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 10:21.

Cadent Gas logo
LONG TERM
Between
20 Oct and 24 Nov 2025
Details
View Map
Share
Rugby Road

Cadent Gas were proposing to carry out Utility asset works on Rugby Road, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 17:01.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Cubbington Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cubbington Road, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Jul 2025 at 14:28.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Cubbington Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cubbington Road, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Jul 2025 at 10:52.

Warwickshire County Council logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Stoneleigh Road

Warwickshire County Council are proposing to carry out Highway improvement works on Stoneleigh Road, Stoneleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 2 May 2025 at 11:21.

Western Power Distribution (East Midlands) logo
Between
25 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Myton Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Myton Road, Warwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 10 Apr 2025 at 10:28.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Leycester Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Leycester Place, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 14:33.

Warwickshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
High Street

Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 5 Jun 2025 at 09:53.

Cadent Gas logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Fairlawn Close

Cadent Gas were proposing to carry out Utility asset works on Fairlawn Close, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 17:06.

Warwickshire County Council logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bowers Croft

Warwickshire County Council are proposing to carry out Highway improvement works on Bowers Croft, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 7 May 2025 at 12:03.

Warwickshire County Council logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Bowers Croft

Warwickshire County Council are proposing to carry out Highway improvement works on Bowers Croft, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 12 May 2025 at 11:21.

Warwickshire County Council logo
LONG TERM
Between
30 Oct 2025 and 29 May 2026
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are proposing to carry out Highway improvement works on Banbury Road, Bishops Tachbrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 29 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 31 Jul 2025 at 15:45.

Warwickshire County Council logo
Between
31 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Coventry Road

Warwickshire County Council are proposing to carry out Highway improvement works on Coventry Road, Warwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 22 May 2025 at 14:16.

Cadent Gas logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Cornwall Place

Cadent Gas were proposing to carry out Utility asset works on Cornwall Place, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 May 2025 at 17:11.

Severn Trent Water logo
LONG TERM
Between
10 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Daly Avenue

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Daly Avenue, Budbrooke.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 20 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Aug 2025 at 08:10.

Warwickshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Ashow Road

Warwickshire County Council are proposing to carry out Highway improvement works on Ashow Road, Chesford, Kenilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:04.

Warwickshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Leamington Road

Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Blackdown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:04.

Warwickshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Ashow Road

Warwickshire County Council are proposing to carry out Highway improvement works on Ashow Road, Ashow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:05.

Warwickshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Leamington Road

Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Chesford, Kenilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 8 Aug 2025 at 11:02.

Warwickshire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Banbury Road

Warwickshire County Council are proposing to carry out Highway improvement works on Banbury Road, Bishops Tachbrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 18 Aug 2025 at 14:42.

Cadent Gas logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Heathcote Road

Cadent Gas were proposing to carry out Utility asset works on Heathcote Road, Whitnash, Leamington Spa.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Apr 2025 at 10:20.

Severn Trent Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
New Street

Severn Trent Water are proposing to carry out New service connection on New Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Aug 2025 at 14:09.

Severn Trent Water logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
New Street

Severn Trent Water are proposing to carry out New service connection on New Street, Leamington Spa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Aug 2025 at 14:18.

Warwickshire County Council logo
LONG TERM
Between
24 Nov 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Leamington Road

Warwickshire County Council are proposing to carry out Highway improvement works on Leamington Road, Kenilworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 15 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Warwickshire County Council on 24 Jun 2025 at 10:29.


Roadworks Map near to Whitnash Road, LEAMINGTON SPA, CV31 2HT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 12:45
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Whitnash Road, LEAMINGTON SPA, CV31 2HT (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
COBDEN AVENUE, WHITNASH 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.7
Details
Share
Follow
2
Virgin Media logo
ENDSLEIGH GARDENS, SYDENHAM 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
2 Sep 2025 12:45 - 13:30
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.