ROADWORKS SUMMARY
Manfield Avenue, COVENTRY, CV2 2HN
Introduction
View current and future planned roadworks and road closures for Manfield Avenue, CV2 2HN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Manfield Avenue, COVENTRY, CV2 2HN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Manfield Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Apr 2025
Coventry City Council are carrying out Section 50 on Station Square, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 May 2023 at 09:00 and could run through until 3 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Coventry City Council on 3 May 2023 at 12:51.
2 Jan and 12 Dec 2024
Coventry City Council are proposing to carry out Highway improvement works on Leicester Causeway, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 25 Nov 2023 at 10:06.
29 Nov 2024
Cadent Gas are carrying out Utility asset works on Rugby Road, The Cocked Hat, Binley Woods.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 11:49 and could run through until 29 November 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 10:51.
15 Nov 2024
Coventry City Council are carrying out Highway improvement works on Bennetts Road South, Coventry.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 July 2024 at 00:00 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 6 Aug 2024 at 11:33.
31 Mar 2025
Coventry City Council are carrying out Highway improvement works on Jimmy Hill Way, Coventry.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2024 at 00:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 8 Aug 2024 at 09:26.
31 Mar 2025
Coventry City Council are carrying out Highway improvement works on Foleshill Road, Coventry.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2024 at 00:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 8 Aug 2024 at 09:26.
Friday
Coventry City Council were proposing to carry out Highway improvement works on Oldfield Road, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 1 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 Sep 2024 at 16:41.
15 Nov 2024
Coventry City Council are carrying out Highway improvement works on Crampers Fields, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 00:00 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 30 Oct 2024 at 15:10.
Friday
Coventry City Council are proposing to carry out Highway improvement works on Crampers Fields, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Coventry City Council on 10 Sep 2024 at 10:58.
17 Oct 2025
Coventry City Council are carrying out Highway improvement works on London Road, Coventry.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 11:27 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 14 Oct 2024 at 11:39.
15 Oct 2024 and 28 Feb 2025
Coventry City Council are proposing to carry out Highway improvement works on Terry Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 5 Oct 2023 at 09:07.
21 Oct and 11 Nov 2024
Coventry City Council are proposing to carry out Section 50 on Harnall Lane West, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 17 Oct 2024 at 16:16.
21 Oct 2024 and 17 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on London Road, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 12 Sep 2024 at 16:13.
6 Nov 2024
Warwickshire County Council are carrying out Highway improvement works on Wood Lane, Shilton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 10:17 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 21 Oct 2024 at 10:17.
21 Oct and 6 Nov 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Wood Lane, Shilton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 9 Jul 2024 at 07:54.
13 Nov 2024
Coventry City Council are carrying out Section 50 on Harnall Lane West, Coventry.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 09:00 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 23 Oct 2024 at 10:04.
Today
Warwickshire County Council are proposing to carry out Highway improvement works on Tamar Road, Bulkington, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2024 at 14:57.
Today
Warwickshire County Council are proposing to carry out Highway improvement works on Trent Road, Bulkington, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 8 Aug 2024 at 14:56.
27 Oct and 9 Dec 2024
Coventry City Council are proposing to carry out Highway improvement works on Foleshill Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 3 Oct 2024 at 11:22.
Friday
Coventry City Council are proposing to carry out Highway improvement works on Bennetts Road South, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 21 Aug 2024 at 12:59.
Friday
Coventry City Council are carrying out Highway improvement works on Bennetts Road South, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 00:00 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 29 Oct 2024 at 14:49.
Friday
Coventry City Council are proposing to carry out Section 50 on Meadow Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 5 Sep 2024 at 11:38.
Friday
Severn Trent Water are carrying out Utility repair and maintenance works on Upper Hill Street, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:59 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 13:26.
8 Nov 2024
Western Power Distribution (East Midlands) are carrying out Utility asset works on F P Mayflower Drive Side Of No 34, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:49 and could run through until 8 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Oct 2024 at 12:07.
Tomorrow
Coventry City Council are carrying out Highway improvement works on Orton Road, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:55 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 28 Oct 2024 at 11:40.
28 Oct and 8 Nov 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on F P Mayflower Drive Side Of No 34, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Aug 2024 at 16:10.
28 Oct and 8 Nov 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on F P Brewster Close Side Of No 15 To Carver Close Corner Of No 44, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Aug 2024 at 16:08.
28 Oct and 11 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on F P Pandora Road From Rear Of No 24 To Rear Of No 29, Coventry.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the verge and footpath.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 15:59.
Friday
Cadent Gas are carrying out Utility asset works on St James Lane, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:02 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:09.
28 Oct and 29 Nov 2024
Coventry City Council are proposing to carry out Highway improvement works on Cheltenham Croft, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 18 Oct 2024 at 14:15.
Sunday
ESP Electricity were proposing to carry out Utility asset works on Newtown Road, Bedworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 29 Aug 2024 at 11:50.
8 Nov 2024
Western Power Distribution (East Midlands) are carrying out Utility asset works on F P Brewster Close Side Of No 15 To Carver Close Corner Of No 44, Coventry.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:49 and could run through until 8 November 2024. The works will impact the footway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Oct 2024 at 12:08.
Sunday
ES Pipelines were proposing to carry out Utility asset works on Newdigate Road, Bedworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by ES Pipelines on 29 Aug 2024 at 11:53.
Monday
Severn Trent Water are carrying out Utility repair and maintenance works on Gordon Street, Coventry.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 15:55 and could run through until 4 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 15:09.
Saturday
ESP Electricity are proposing to carry out Utility asset works on Newdigate Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 30 Oct 2024 at 12:29.
4 and 13 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Billing Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 09:29.
4 and 25 Nov 2024
Electricity Network Company are proposing to carry out Utility asset works on Gwendolyn Drive, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 8 Oct 2024 at 12:23.
4 Nov 2024 and 31 Oct 2025
Coventry City Council are proposing to carry out Highway improvement works on Clifford Bridge Road, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 13 Sep 2024 at 17:09.
6 and 8 Nov 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Long Street, Bedworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Sep 2024 at 13:56.
11 and 20 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodshires Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 13:08.
11 Nov and 13 Dec 2024
Coventry City Council are proposing to carry out Highway improvement works on Brownshill Green Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 15 Oct 2024 at 09:32.
11 and 20 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodshires Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Aug 2024 at 11:57.
13 and 15 Nov 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Bazzard Road, Wolvey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 9 Oct 2024 at 10:50.
13 and 19 Nov 2024
ESP Electricity are proposing to carry out Utility asset works on Newdigate Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 3 Sep 2024 at 16:50.
13 and 15 Nov 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Bazzard Road, Wolvey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 21 Aug 2024 at 10:37.
14 and 20 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on St James Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 16:03.
18 Nov and 13 Dec 2024
Murphy Gas Networks are proposing to carry out Utility asset works on Fivefield Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Gas Networks on 30 Oct 2024 at 11:36.
18 Nov and 13 Dec 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Fivefield Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 11:03.
18 and 20 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Martins Road Service Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Aug 2024 at 15:51.
18 and 20 Nov 2024
BT are proposing to carry out Utility asset works on Dyers Lane, Wolston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 3 Sep 2024 at 15:54.
18 and 20 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Martins Road Service Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Sep 2024 at 18:46.
18 and 21 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Allesley Old Road Service Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Aug 2024 at 15:39.
18 and 21 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Allesley Old Road Service Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Aug 2024 at 13:25.
18 and 27 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Second Avenue, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Aug 2024 at 17:07.
18 and 27 Nov 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Second Avenue, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 14:18.
20 Nov and 6 Dec 2024
Severn Trent Water are proposing to carry out Utility asset works on Bennetts Road North, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 15:27.
27 Nov 2024 and 17 Oct 2025
Coventry City Council were proposing to carry out Highway improvement works on London Road, Coventry.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 4 Sep 2024 at 16:10.
2 and 6 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Bedworth Bypass, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 11 Sep 2024 at 11:53.
9 and 31 Dec 2024
Severn Trent Water are proposing to carry out Utility asset works on Bennetts Road North, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 13:15.
9 Dec 2024 and 24 Jan 2025
Coventry City Council are proposing to carry out Highway improvement works on Bennetts Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 29 Oct 2024 at 15:19.
12 and 16 Dec 2024
Coventry City Council were proposing to carry out Highway improvement works on Gayer Street, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 30 Oct 2024 at 08:18.
2 Jan and 31 Jul 2025
Coventry City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 20 Sep 2024 at 16:58.
2 Jan and 31 Jul 2025
Coventry City Council are proposing to carry out Highway improvement works on Greyfriars Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 3 Oct 2024 at 15:20.
2 Jan and 31 Jul 2025
Coventry City Council are proposing to carry out Highway improvement works on Queen Victoria Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 3 Oct 2024 at 15:21.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Knoll Drive, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 12:00.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Knoll Drive, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 12:25.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Woodlands, Bedworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 09:22.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Woodlands, Bedworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:46.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sutherland Drive, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:25.
6 Jan and 28 Mar 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Tamworth Road, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 28 Oct 2024 at 11:50.
6 and 10 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kingsley Terrace, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 11:50.
9 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ox Close, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 08:38.
9 Jan and 10 Feb 2025
Coventry City Council are proposing to carry out Section 50 on Aldermans Green Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Coventry City Council on 16 Oct 2024 at 13:59.
9 and 15 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ox Close, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 11:29.
13 and 31 Jan 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Rugby Road, Binley Woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 9 Oct 2024 at 10:54.
13 Jan and 12 Dec 2025
Coventry City Council are proposing to carry out Highway improvement works on Clifford Bridge Road, Coventry.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Coventry City Council on 4 Oct 2024 at 16:13.
13 and 22 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bartons Meadow, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 11:23.
20 Jan and 7 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Rye Piece Ringway, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 16 Oct 2024 at 10:35.
20 Jan and 7 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 24 Oct 2024 at 14:17.
20 Jan and 14 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Rugby Road, Binley Woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 25 Oct 2024 at 11:02.
20 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Penny Park Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 11:06.
20 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Penny Park Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 11:06.
21 and 23 Jan 2025
ESP Electricity are proposing to carry out New service connection on Brandon Lane, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 29 Oct 2024 at 08:14.
22 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wappenbury Road, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 12:05.
23 and 25 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Newbold Close, Coventry.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 13:38.
24 and 26 Jan 2025
Severn Trent Water were proposing to carry out New service connection on Newbold Close, Coventry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 13:27.
Roadworks Map near to Manfield Avenue, COVENTRY, CV2 2HN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Manfield Avenue, COVENTRY, CV2 2HN (14 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Oct 2024 - 29 Nov 2024)
(Scheduled: 28 Oct 2024 - 11 Nov 2024)
(Scheduled: 14 Oct 2024 - 1 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.