ROADWORKS SUMMARY
Queens Road, NUNEATON, CV11 5LE
Introduction

View current and future planned roadworks and road closures for Queens Road, CV11 5LE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Queens Road, NUNEATON, CV11 5LE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Queens Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
9 Feb 2026
Leicestershire County Council are carrying out Highway improvement works on Footpath T53, Hinckley And Bosworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 10:09 and could run through until 9 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 1 Jul 2025 at 15:58.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Justice Walk, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:11.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bond Gate, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:11.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Wheat Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:07.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:13.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bond Street, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:12.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Vicarage Street, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:08.
19 Sep 2025
Cadent Gas are carrying out Utility asset works on Thornhill Drive, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 July 2025 at 12:54 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:53.
4 Aug and 10 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on St Marys Road, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 14:04.
10 Oct 2025
Severn Trent Water are carrying out Utility asset works on St Marys Road, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:30 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Aug 2025 at 09:01.
11 Aug and 17 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Willington Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 May 2025 at 09:15.
17 Oct 2025
Severn Trent Water are carrying out Utility repair and maintenance works on Willington Street, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 09:24 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Aug 2025 at 11:06.
11 Aug and 10 Oct 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Higham Lane, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:21.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Wheelwright Lane, Bedworth.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 11:35 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 10:33.
18 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Meadowside, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:00.
18 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:04.
Sunday
Warwickshire County Council are proposing to carry out Highway improvement works on George Street Ringway, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 25 Mar 2025 at 13:37.
Sunday
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 25 Mar 2025 at 13:35.
3 Oct 2025
Cadent Gas are carrying out Utility asset works on Sutherland Drive, Bedworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:53 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 09:56.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Clarendon Road, Hinckley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 August 2025 at 14:02 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 08:29.
21 Sep 2025
Warwickshire County Council are carrying out Highway improvement works on George Street Ringway, Bedworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 August 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 1 Sep 2025 at 08:54.
14 Sep 2025
Warwickshire County Council are carrying out Highway improvement works on Leicester Road, Bedworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 August 2025 at 17:00 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 1 Sep 2025 at 08:43.
20 Oct 2025
Western Power Distribution (East Midlands) are carrying out New service connection on Deans Way, Exhall, Bedworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 10:50 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 1 Sep 2025 at 11:53.
20 Oct 2025
Western Power Distribution (East Midlands) are carrying out New service connection on Vicarage Lane, Exhall, Bedworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 10:55 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 1 Sep 2025 at 11:54.
20 Oct 2025
Western Power Distribution (East Midlands) are carrying out New service connection on Church Lane, Exhall, Bedworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 15:30 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 2 Sep 2025 at 08:24.
1 and 26 Sep 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility repair and maintenance works on Chatsworth Drive, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 30 May 2025 at 10:23.
26 Sep 2025
Western Power Distribution (East Midlands) are carrying out Utility repair and maintenance works on Chatsworth Drive, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:40 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 1 Sep 2025 at 09:19.
1 and 12 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on School Hill, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 30 May 2025 at 14:05.
1 and 12 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on School Hill, Hartshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 Aug 2025 at 11:51.
1 and 12 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Church Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 10 Jun 2025 at 15:54.
1 and 12 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Church Road, Hartshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 Aug 2025 at 11:51.
1 and 12 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Castle Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 10 Jun 2025 at 15:53.
1 and 12 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Castle Road, Hartshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 Aug 2025 at 12:12.
1 and 12 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on The Green, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 10 Jun 2025 at 15:56.
1 and 12 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on The Green, Hartshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 Aug 2025 at 12:12.
1 and 12 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Atherstone Road, Hartshill Green, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 10 Jun 2025 at 15:54.
1 and 12 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Atherstone Road, Hartshill Green, Hartshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 Aug 2025 at 12:23.
19 Sep 2025
Warwickshire County Council are carrying out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 2 Sep 2025 at 09:44.
2 Sep and 20 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on A5 From J B4111/b4116 Roundabout To J A444 Including Dualling, North Warwickshire.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2025 at 16:30.
5 and 19 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Tuttle Hill, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:34.
15 and 17 Sep 2025
BT are proposing to carry out Utility repair and maintenance works on Wilsons Lane, Longford, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 12 Aug 2025 at 14:42.
15 and 19 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bedworth Bypass, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 1 Jul 2025 at 09:03.
15 and 17 Sep 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Armson Road, Black Bank, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Aug 2025 at 09:48.
22 Sep and 10 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Coventry Road, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Jul 2025 at 16:05.
22 Sep and 10 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Coventry Road, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Jul 2025 at 09:55.
22 and 24 Sep 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Old Hinckley Road, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 21 May 2025 at 06:58.
22 and 24 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldbury Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Jul 2025 at 09:00.
22 and 24 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldbury Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 13:58.
22 and 25 Sep 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Teign Bank Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Jun 2025 at 11:06.
29 Sep and 3 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Leyland Road, Bulkington, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Aug 2025 at 15:27.
29 Sep and 14 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newdigate Road, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 14:58.
29 Sep and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Thornhill Drive, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:03.
29 Sep and 10 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Wykin Lane, Stoke Golding.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 10 Jul 2025 at 09:46.
29 Sep and 1 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Riverside, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Aug 2025 at 15:06.
29 Sep and 1 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Riverside, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 10:36.
1 Oct 2025 and 31 Mar 2026
Warwickshire County Council are proposing to carry out Highway improvement works on Pickards Way, Bedworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 31 March 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 25 Mar 2025 at 13:17.
1 and 15 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Tuttle Hill, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 17:01.
6 and 8 Oct 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Armson Road, Black Bank, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Jul 2025 at 16:53.
6 and 31 Oct 2025
Optimal Power Networks are proposing to carry out Utility asset works on A5 From J A47 To J A47/b4666 Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Optimal Power Networks on 22 Aug 2025 at 14:25.
6 and 11 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Roston Drive, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Aug 2025 at 11:56.
6 and 11 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Roston Drive, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 18 Aug 2025 at 15:16.
6 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Mancetter Road, Mancetter.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 12:22.
6 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Mancetter Road, Mancetter.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 10:51.
6 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Mancetter Road, Mancetter.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:10.
13 and 15 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Granby Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Jun 2025 at 15:26.
13 and 15 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Granby Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 2 Jul 2025 at 15:16.
13 and 18 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Stockwell Head, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:06.
13 and 18 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on The Borough, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:07.
13 and 18 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on King Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:06.
13 and 18 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Lower Bond Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:05.
13 and 18 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Trinity Lane, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:07.
13 and 18 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Upper Bond Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Aug 2025 at 16:07.
14 and 16 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smorrall Lane, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Jun 2025 at 14:57.
14 and 16 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smorrall Lane, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 15:03.
15 Oct and 24 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Sealand Drive, Collycroft, Bedworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 10:33.
15 Oct and 20 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Sutherland Drive, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:23.
15 Oct and 2 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Newdigate Road, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2025 at 11:22.
15 and 17 Oct 2025
Severn Trent Water are proposing to carry out New service connection on Johns Close, Burbage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Aug 2025 at 13:46.
20 and 22 Oct 2025
Severn Trent Water were proposing to carry out New service connection on Rugby Road, Burbage.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Jun 2025 at 08:04.
20 and 25 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Stockwell Head, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 13:36.
20 and 25 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on The Borough, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 27 Mar 2025 at 09:16.
20 and 25 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on King Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 13:36.
20 and 25 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Lower Bond Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 13:36.
20 and 25 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Trinity Lane, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 27 Mar 2025 at 09:16.
20 and 25 Oct 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Upper Bond Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 13:36.
20 Oct 2025 and 12 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Nuneaton Road, Mancetter.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 12 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 12:27.
20 Oct 2025 and 12 Jan 2026
Cadent Gas were proposing to carry out Utility asset works on Nuneaton Road, Mancetter.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 12 January 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:34.
21 and 23 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Amos Avenue, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Jun 2025 at 09:30.
21 and 23 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Amos Avenue, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 8 Jul 2025 at 15:05.
23 and 31 Oct 2025
BT are proposing to carry out Utility asset works on A5 From End Of Dualling North Of Caldecote To J A47, Nuneaton And Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 25 Jul 2025 at 14:51.
23 and 31 Oct 2025
BT were proposing to carry out Utility asset works on A5 From End Of Dualling North Of Caldecote To J A47, Nuneaton And Bedworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 October 2025 and run through until 31 October 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 23 Jul 2025 at 12:49.
23 and 31 Oct 2025
BT were proposing to carry out Utility asset works on Wood Lane, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 October 2025 and run through until 31 October 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 2 Sep 2025 at 13:50.
23 and 31 Oct 2025
BT were proposing to carry out Utility asset works on Wood Lane, Higham On The Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 October 2025 and run through until 31 October 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 2 Sep 2025 at 13:49.
23 and 31 Oct 2025
BT are proposing to carry out Utility asset works on Wood Lane, Higham On The Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 11 Aug 2025 at 15:26.
23 and 31 Oct 2025
BT were proposing to carry out Utility asset works on A5 From End Of Dualling North Of Caldecote To J A47, Nuneaton And Bedworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 October 2025 and run through until 31 October 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 24 Jul 2025 at 11:01.
23 and 31 Oct 2025
BT are proposing to carry out Utility asset works on A5 From J A444 To End Of Dualling North Of Caldecote Se, North Warwickshire.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 25 Jul 2025 at 14:50.
27 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Ash Green Lane, Ash Green, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 12:19.
27 and 31 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on Leyland Road, Bulkington, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 14:25.
27 and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Morris Drive, Caldwell, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 5 Aug 2025 at 10:19.
27 and 31 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 23 Jul 2025 at 09:16.
27 Oct and 8 Nov 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Coventry Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 15:56.
27 Oct and 8 Nov 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Long Meadow Drive, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Jul 2025 at 15:56.
27 and 30 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Priesthills Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Severn Trent Water on 11 Aug 2025 at 12:56.
27 and 30 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Priesthills Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Severn Trent Water on 12 Aug 2025 at 16:26.
27 Oct and 1 Nov 2025
Leicestershire County Council were proposing to carry out Highway improvement works on Roston Drive, Hinckley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 31 Jul 2025 at 09:56.
27 Oct and 1 Nov 2025
BT were proposing to carry out Utility asset works on A5 From End Of Dualling North Of Caldecote To J A47, Nuneaton And Bedworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 1 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 2 Sep 2025 at 13:50.
27 Oct and 1 Nov 2025
BT were proposing to carry out Utility asset works on A5 From J A444 To End Of Dualling North Of Caldecote Se, North Warwickshire.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 1 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 2 Sep 2025 at 13:50.
27 Oct and 11 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Nuneaton Road, Mancetter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 24 Jul 2025 at 14:52.
28 and 30 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Bedworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2025 and run through until 30 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Jul 2025 at 09:39.
29 and 31 Oct 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Wiclif Way, Church Farm, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 24 Jun 2025 at 14:58.
30 Oct and 17 Dec 2025
BT are proposing to carry out Utility repair and maintenance works on A5 From J B4111/b4116 Roundabout To J A444 Including Dualling, North Warwickshire.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 17 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 30 Jul 2025 at 14:11.
3 and 6 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Milton Close, Coalpit Fields, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 9 Jul 2025 at 16:06.
3 and 21 Nov 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Gipsy Lane, Whitestone, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 23 Jul 2025 at 12:35.
3 and 7 Nov 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2025 at 10:00.
3 and 7 Nov 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Burgage Place, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 3 Sep 2025 at 09:59.
3 and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Lodge Close, Mancetter.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jul 2025 at 12:28.
3 and 21 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Lodge Close, Mancetter.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 12:30.
4 and 6 Nov 2025
Severn Trent Water are proposing to carry out New service connection on Johns Close, Burbage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Aug 2025 at 12:36.
6 and 25 Nov 2025
Electricity Network Company are proposing to carry out Utility asset works on Wilsons Lane, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 25 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 1 Sep 2025 at 14:09.
10 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Arbury Avenue, Mount Pleasant, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 13:47.
10 Nov and 12 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Arbury Avenue, Mount Pleasant, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 14:13.
13 Nov and 5 Dec 2025
Electricity Network Company are proposing to carry out Utility asset works on Wilsons Lane, Coventry.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 27 Aug 2025 at 08:13.
18 and 20 Nov 2025
Cadent Gas are proposing to carry out Remedial works on Gadsby Street, Attleborough, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 16:11.
19 and 21 Nov 2025
Severn Trent Water were proposing to carry out New service connection on Armson Road, Bedworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 29 Aug 2025 at 15:17.
21 Nov and 10 Dec 2025
Optimal Power Networks are proposing to carry out Utility asset works on A5 From J A47 To J A47/b4666 Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 10 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Optimal Power Networks on 29 Aug 2025 at 09:10.
24 Nov and 5 Dec 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Burbage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 2 May 2025 at 12:16.
24 and 28 Nov 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Burbage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 6 Aug 2025 at 11:36.
26 and 28 Nov 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Pallett Drive, St Nicolas Park, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 11 Aug 2025 at 10:34.
1 and 22 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2025 at 16:09.
1 and 22 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2025 at 16:10.
1 and 22 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2025 at 16:11.
1 and 22 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2025 at 16:11.
1 Dec 2025 and 6 Mar 2026
Cadent Gas are proposing to carry out Utility asset works on Bucks Hill, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 12:37.
1 Dec 2025 and 6 Mar 2026
Cadent Gas are proposing to carry out Utility asset works on Bucks Hill, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jun 2025 at 16:17.
1 and 5 Dec 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ambleside Way, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Aug 2025 at 17:01.
1 and 22 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Aug 2025 at 16:11.
Roadworks Map near to Queens Road, NUNEATON, CV11 5LE (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Queens Road, NUNEATON, CV11 5LE (30 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 12 Sep 2025)
(Scheduled: 11 Aug 2025 - 17 Oct 2025)
(Scheduled: 30 Aug 2025 - 5 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.