ROADWORKS SUMMARY
Manor Court Road, NUNEATON, CV11 5HU
Introduction

View current and future planned roadworks and road closures for Manor Court Road, CV11 5HU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Manor Court Road, NUNEATON, CV11 5HU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Manor Court Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
11 Jun 2025
Leicestershire County Council are carrying out Highway improvement works on Footpath T53, Hinckley And Bosworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 10:09 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Oct 2024 at 10:16.
Today
Warwickshire County Council are carrying out Highway improvement works on Higham Lane, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 09:00 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 19 May 2025 at 10:54.
28 Apr and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Heath Road, Bedworth Heath, Bedworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:24.
Friday
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Somers Road, Keresley, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Feb 2025 at 12:07.
Friday
Western Power Distribution (East Midlands) are carrying out Utility asset works on Somers Road, Keresley, Bedworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 10:49 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 May 2025 at 11:07.
Friday
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Addenbrooke Road, Keresley End, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 Feb 2025 at 11:20.
Friday
Western Power Distribution (East Midlands) are carrying out Utility asset works on Addenbrooke Road, Keresley End, Bedworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 10:52 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 May 2025 at 11:07.
Today
Cadent Gas are proposing to carry out Utility asset works on Dempster Road, Mount Pleasant, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:31.
Today
Cadent Gas were proposing to carry out Utility asset works on Dempster Road, Mount Pleasant, Bedworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 14:49.
Today
Warwickshire County Council are carrying out Highway improvement works on South Street, Atherstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 6 May 2025 at 09:48.
Today
Warwickshire County Council are carrying out Highway improvement works on Convent Lane, Atherstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 6 May 2025 at 09:48.
6 May and 23 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Footpath T55, Sutton Cheney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 23 August 2025. The works will impact the footpath only.
This roadwork event was last updated by Leicestershire County Council on 25 Apr 2025 at 13:46.
23 Aug 2025
Leicestershire County Council are carrying out Highway improvement works on Footpath T55, Sutton Cheney.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 00:00 and could run through until 23 August 2025. The works will impact the footpath only.
This roadwork event was last updated by Leicestershire County Council on 15 May 2025 at 15:06.
Friday
Leicestershire County Council are carrying out Highway improvement works on Edward Street, Hinckley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 10:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 3 Jun 2025 at 12:36.
16 May and 20 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bladon Close, St Nicolas Park, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 5 Mar 2025 at 15:00.
16 May and 20 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Woodcote Avenue, St Nicolas Park, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 5 Mar 2025 at 14:59.
19 May and 23 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Marshall Road, Black Bank, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 5 Mar 2025 at 15:01.
Today
Cadent Gas were proposing to carry out Utility asset works on Mount Pleasant Road, Mount Pleasant, Bedworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 14:50.
Monday
Cadent Gas are carrying out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 12:33 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 13:17.
Tomorrow
Cityfibre Metro Networks are carrying out New service connection on Sandy Lane, Fillongley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 09:29 and could run through until 4 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 29 May 2025 at 09:29.
26 May and 20 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 20 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 09:08.
27 May and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Dugdale Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:29.
27 May and 16 Jun 2025
Cadent Gas carried out Utility asset works on Dugdale Street, Nuneaton.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 27 May 2025 and 16 Jun 2025 and were actually completed between 2 Jun 2025 (09:00) and 3 Jun 2025 (13:10). The works impacted the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 13:48.
27 May and 20 Jun 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Caldecote Lane, Caldecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 7 Feb 2025 at 12:42.
20 Jun 2025
Western Power Distribution (East Midlands) are carrying out New service connection on Caldecote Lane, Caldecote.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 07:00 and could run through until 20 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 27 May 2025 at 08:30.
Friday
Severn Trent Water are carrying out Utility repair and maintenance works on Strathmore Road, Hinckley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 13:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 30 May 2025 at 12:42.
1 and 22 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Old Hinckley Road, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 20 Jan 2025 at 12:37.
1 and 22 Jun 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Old Hinckley Road, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 2 Jun 2025 at 07:44.
22 Jun 2025
Warwickshire County Council are carrying out Highway improvement works on Weddington Road, Weddington, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2025 at 09:00 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 2 Jun 2025 at 08:15.
11 Jul 2025
Murphy Power Distribution are carrying out Utility asset works on Hospital Lane, Goodyers End, Bedworth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:00 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 2 Jun 2025 at 09:02.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Silver Birch Avenue, Bedworth Heath, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:25.
2 Jun and 4 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Thornhill Drive, Whitestone, Nuneaton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 09:09.
2 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Golf Drive, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 15:20.
18 Jul 2025
Cadent Gas are carrying out Utility asset works on Golf Drive, Whitestone, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:15 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:08.
2 and 22 Jun 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Vicarage Street, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:08.
2 and 27 Jun 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Leicester Road, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:09.
2 and 20 Jun 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Hinckley Road, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:10.
4 Jun and 3 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Higham Lane, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 20 May 2025 at 14:44.
5 and 11 Jun 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Weddington Road, Weddington, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 20 Jan 2025 at 12:27.
9 and 11 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Elgar Close, Whitestone, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Mar 2025 at 14:19.
9 and 11 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Elgar Close, Whitestone, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.
9 and 13 Jun 2025
Severn Trent Water are proposing to carry out Utility asset works on Crowhill Road, Whitestone, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:27.
9 and 13 Jun 2025
Severn Trent Water are proposing to carry out Utility asset works on Crowhill Road, Whitestone, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 08:46.
9 Jun and 5 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Merlin Avenue, Whittleford, Nuneaton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 5 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jan 2025 at 08:08.
9 and 13 Jun 2025
Cadent Gas are proposing to carry out New service connection on Chancery Lane, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 08:28.
9 and 12 Jun 2025
Severn Trent Water are proposing to carry out New service connection on Atherstone Road, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 11 Apr 2025 at 15:56.
9 and 12 Jun 2025
Cadent Gas are proposing to carry out New service connection on Atherstone Road, Ratcliffe Culey, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 15:36.
9 and 12 Jun 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Atherstone Road, Ratcliffe Culey, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:01.
13 Jun and 11 Jul 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Wentworth Drive, Whitestone, Nuneaton.
These works were categorised as Major.
The works were originally planned to start 13 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Apr 2025 at 08:53.
13 Jun and 11 Jul 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Crowhill Road, Whitestone, Nuneaton.
These works were categorised as Major.
The works were originally planned to start 13 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 29 Apr 2025 at 08:53.
13 Jun and 11 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cedar Road, Camp Hill, Nuneaton.
These works are categorised as Major.
The works will start on or after 13 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 25 Mar 2025 at 08:49.
16 and 19 Jun 2025
Severn Trent Water are proposing to carry out New service connection on Atherstone Road, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 3 Apr 2025 at 19:00.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Edward Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:15.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Edward Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 08:22.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:16.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 08:22.
18 Jun and 8 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Sketchley Lane, Burbage.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 June 2025 and run through until 8 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 12:36.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldbury Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 25 Mar 2025 at 13:33.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oldbury Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 08:23.
21 and 23 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on Blackhorse Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Mar 2025 at 14:04.
21 and 23 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on Blackhorse Road, Longford, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Mar 2025 at 14:04.
23 Jun and 8 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Deans Way, Exhall, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Mar 2025 at 14:04.
23 Jun and 8 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Vicarage Lane, Exhall, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Mar 2025 at 14:05.
23 Jun and 8 Aug 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Church Lane, Exhall, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Mar 2025 at 14:03.
23 and 25 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Road, Ratcliffe Culey, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Apr 2025 at 12:56.
29 Jun and 27 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Garrett Street, Attleborough, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 11 Feb 2025 at 11:12.
29 Jun and 27 Jul 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Garrett Street, Attleborough, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 June 2025 and run through until 27 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 May 2025 at 14:31.
29 Jun and 27 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Eastboro Way, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 7 Feb 2025 at 16:12.
29 Jun and 27 Jul 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Eastboro Way, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 June 2025 and run through until 27 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 27 May 2025 at 14:20.
30 Jun and 18 Jul 2025
Murphy Gas Networks are proposing to carry out Utility asset works on Hospital Lane, Goodyers End, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Gas Networks on 10 Apr 2025 at 12:06.
30 Jun and 2 Jul 2025
Severn Trent Water are proposing to carry out New service connection on Bottrill Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Apr 2025 at 14:00.
30 Jun and 2 Jul 2025
Severn Trent Water are proposing to carry out New service connection on Bottrill Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Apr 2025 at 08:56.
4 and 18 Jul 2025
Severn Trent Water are proposing to carry out Utility asset works on Grange Road, Coventry.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 25 Apr 2025 at 14:15.
5 Jul and 5 Aug 2025
Warwickshire County Council were proposing to carry out Highway improvement works on Bazzard Road, Wolvey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 July 2025 and run through until 5 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 31 Mar 2025 at 10:39.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bazzard Road, Wolvey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:20.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Gipsy Lane, Whitestone, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:08.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Barons Croft, Whittleford, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:01.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Eastboro Way, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:05.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Portland Drive, Whittleford, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:03.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Mancetter Road, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 10 Apr 2025 at 09:32.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Nuneaton Road, Mancetter.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 7 Apr 2025 at 11:47.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on South Street, Atherstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 31 Mar 2025 at 13:59.
5 Jul and 5 Aug 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Convent Lane, Atherstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 31 Mar 2025 at 13:58.
7 and 22 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 12:50.
7 and 11 Jul 2025
Cadent Gas are proposing to carry out New service connection on Chancery Lane, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 14:48.
7 and 11 Jul 2025
Cadent Gas are proposing to carry out New service connection on Regent Street, Hinckley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 12:46.
7 and 11 Jul 2025
Cadent Gas are proposing to carry out New service connection on Regent Street, Hinckley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 10:46.
9 Jul and 25 Aug 2025
Leicestershire County Council were proposing to carry out Highway improvement works on Brookside, Burbage.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 July 2025 and run through until 25 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leicestershire County Council on 1 May 2025 at 13:16.
13 Jul and 7 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Garrett Street, Attleborough, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 30 May 2025 at 14:40.
14 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Fairway, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:20.
14 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Fairway, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:48.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Justice Walk, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:11.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bond Gate, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:11.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Wheat Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:07.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:13.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Bond Street, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:12.
14 Jul and 29 Dec 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Vicarage Street, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Warwickshire County Council on 15 Aug 2024 at 11:08.
15 and 18 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out Disconnection or alteration of supply on Seaforth Drive, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Apr 2025 at 11:56.
18 and 22 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on School Lane, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 2 May 2025 at 15:25.
18 and 22 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on School Lane, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 15 May 2025 at 09:26.
22 and 30 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Hickman Road, Galley Common, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 28 Feb 2025 at 14:27.
22 and 30 Jul 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Hickman Road, Galley Common, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 13 May 2025 at 11:32.
28 and 31 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mount Drive, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 15:20.
28 and 31 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mount Drive, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 29 Apr 2025 at 08:41.
28 and 30 Jul 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on Gun Hill, Arley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 28 May 2025 at 14:57.
28 and 30 Jul 2025
Severn Trent Water were proposing to carry out New service connection on Rugby Road, Burbage.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 May 2025 at 11:15.
28 Jul and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Burbage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leicestershire County Council on 1 May 2025 at 13:46.
28 Jul and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Brookside, Burbage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leicestershire County Council on 23 May 2025 at 11:36.
2 and 15 Aug 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Mansion Street, Hinckley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 08:46.
2 and 15 Aug 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Trinity Lane, Hinckley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 21 May 2025 at 08:46.
4 and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Greenway, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:22.
4 and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Greenway, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:57.
4 Aug and 10 Oct 2025
Severn Trent Water are proposing to carry out Utility asset works on St Marys Road, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 14:04.
4 and 9 Aug 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Mansion Street, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 9 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 23 May 2025 at 09:16.
7 and 9 Aug 2025
Severn Trent Water were proposing to carry out New service connection on Lower Bond Street, Hinckley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 August 2025 and run through until 9 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 20 May 2025 at 10:39.
11 and 13 Aug 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Duke Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 May 2025 at 14:10.
11 and 13 Aug 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Duke Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 27 May 2025 at 09:07.
11 and 14 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Birmingham Road, Ansley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 28 May 2025 at 14:51.
11 and 14 Aug 2025
Severn Trent Water are proposing to carry out New service connection on Birmingham Road, Ansley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 2 Jun 2025 at 08:01.
11 Aug and 17 Oct 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Willington Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 May 2025 at 09:15.
11 Aug and 10 Oct 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Higham Lane, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 2 Apr 2025 at 15:21.
11 and 15 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Drayton Lane, Fenny Drayton, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 11:16.
11 and 15 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Drayton Lane, Fenny Drayton, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 25 Mar 2025 at 11:37.
11 and 15 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Quaker Close, Fenny Drayton, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 11:16.
11 and 15 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Quaker Close, Fenny Drayton, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 25 Mar 2025 at 11:37.
11 and 15 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Church Lane, Fenny Drayton, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Mar 2025 at 11:16.
11 and 15 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Church Lane, Fenny Drayton, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 25 Mar 2025 at 11:37.
18 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Meadowside, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:00.
18 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Meadowside, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 09:59.
18 Aug and 22 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Hill Farm Avenue, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 16:04.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Stanley Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 12:36.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Stanley Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Hollycroft, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 19 Feb 2025 at 11:56.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Hollycroft, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Tudor Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 12:36.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Tudor Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Stoke Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 18 Feb 2025 at 12:36.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Stoke Road, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 24 Feb 2025 at 09:16.
20 and 22 Aug 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Towers Drive, Hinckley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Mar 2025 at 16:30.
24 Aug and 7 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on George Street Ringway, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 25 Mar 2025 at 13:37.
24 Aug and 7 Sep 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Leicester Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2025 and could run through until 7 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 25 Mar 2025 at 13:35.
Roadworks Map near to Manor Court Road, NUNEATON, CV11 5HU (30 Events)

































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Manor Court Road, NUNEATON, CV11 5HU (30 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 5 Jun 2025)
(Scheduled: 30 May 2025 - 6 Jun 2025)
(Scheduled: 30 May 2025 - 3 Jun 2025)
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
(Scheduled: 30 May 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.