ROADWORKS SUMMARY
The Larches, NUNEATON, CV10 0GL
Introduction
View current and future planned roadworks and road closures for The Larches, CV10 0GL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Larches, NUNEATON, CV10 0GL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Larches are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
29 Jul and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lutterworth Road, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 15:37.
29 Nov 2024
Cadent Gas are carrying out Utility asset works on Heath End Road, Nuneaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 10:43 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 10:21.
13 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on A5 J A47/b4666 Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:30.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Dodwells Road, Hinckley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 October 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 09:07.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on A5 From J A47 To J A47/b4666 Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 October 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 09:09.
13 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on A5 From J A47 To J A47/b4666 Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:30.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on A5 J A47/b4666 Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 October 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 09:07.
13 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on A5 From J A47/b4666 Roundabout To Start Of Dualling South Of Hinckley Including Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:30.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on A5 From J A47/b4666 Roundabout To Start Of Dualling South Of Hinckley Including Roundabout, Hinckley And Bosworth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 October 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 09:08.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Coventry Road, Hinckley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 October 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 09:08.
21 Oct and 29 Nov 2024
Severn Trent Water are proposing to carry out Utility asset works on Higham Lane, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Aug 2024 at 09:29.
21 Oct and 15 Dec 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Higham Lane, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 31 Jul 2024 at 16:44.
7 Dec 2024
Severn Trent Water are carrying out Utility asset works on Higham Lane, Nuneaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 09:26.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Ramsden Avenue, Camp Hill, Nuneaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 October 2024 at 09:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:52.
17 Dec 2024
Severn Trent Water are carrying out Utility asset works on Riverside, Witherley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 09:30 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 09:33.
18 and 29 Nov 2024
BT are proposing to carry out Utility asset works on Botts Green Lane, Nether Whitacre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 20 Aug 2024 at 11:49.
2 Dec 2024
Cadent Gas are carrying out Utility asset works on Mill Close, Whitestone, Nuneaton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 11:24 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:56.
4 Dec 2024
BT are carrying out Utility asset works on Botts Green Lane, Nether Whitacre.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:30 and could run through until 4 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 21 Nov 2024 at 09:18.
22 Nov and 27 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Smorrall Lane, Corley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 27 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Sep 2024 at 12:03.
25 Nov and 18 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Leyland Road, Attleborough, Nuneaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 12:45.
27 Nov and 13 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Ansley Common, Nuneaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Warwickshire County Council on 10 Sep 2024 at 15:21.
27 Nov and 13 Dec 2024
Warwickshire County Council are proposing to carry out Highway improvement works on Ansley Common, Nuneaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 30 Sep 2024 at 15:38.
2 and 27 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Leyland Road, Attleborough, Nuneaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 11:48.
2 and 6 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Queen Elizabeth Road, Nuneaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Aug 2024 at 11:47.
2 and 5 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeth Road, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Aug 2024 at 10:21.
2 and 22 Dec 2024
Warwickshire County Council are proposing to carry out Section 50 on Milby Drive, St Nicolas Park, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 15:46.
9 Dec 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Smorrall Lane, Corley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Sep 2024 at 09:03.
16 and 18 Dec 2024
Severn Trent Water were proposing to carry out New service connection on Hipsley Lane, Kingsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 17 Sep 2024 at 15:19.
18 and 20 Dec 2024
Severn Trent Water are proposing to carry out New service connection on Hipsley Lane, Kingsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 18:02.
23 and 27 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Foul End Lane, Kingsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 10:00.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sutherland Drive, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:25.
6 Jan and 14 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on A5 J A47/b4666 Roundabout, Hinckley And Bosworth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:05.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Woodlands, Bedworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 09:22.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Woodlands, Bedworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:46.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Dodwells Road, Hinckley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:16.
6 and 24 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Leicester Road, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 5 Nov 2024 at 15:25.
6 Jan and 14 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on A5 From J A47 To J A47/b4666 Roundabout, Hinckley And Bosworth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:18.
6 Jan and 13 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Cleaver Gardens, Weddington, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 6 Jun 2024 at 09:17.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Hinckley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:16.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:21.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 13:56.
6 Jan and 9 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Wood Lane, Higham On The Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 08:46.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Princes Avenue, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:35.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Princes Avenue, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 13:53.
6 Jan and 9 Feb 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Wood Lane, Higham On The Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 13 Nov 2024 at 15:27.
7 and 9 Jan 2025
Severn Trent Water were proposing to carry out New service connection on Old Forge Road, Witherley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Oct 2024 at 15:17.
11 and 19 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 08:47.
11 and 19 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 11:52.
13 and 15 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Atterton Lane, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Nov 2024 at 11:56.
13 and 15 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Atterton Lane, Witherley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 7 Nov 2024 at 13:16.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bracebridge Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:14.
13 Jan and 7 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Smorrall Lane, Astley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 15:44.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bracebridge Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 13:54.
16 Jan and 5 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Tuttle Hill, Nuneaton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:01.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tuttle Hill, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:20.
20 Jan and 7 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 24 Oct 2024 at 14:17.
20 Jan and 7 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Rye Piece Ringway, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 1 Nov 2024 at 10:22.
20 and 30 Jan 2025
Severn Trent Water were proposing to carry out Remedial works on Leathermill Lane, Hartshill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 16:47.
23 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tuttle Hill, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:28.
27 and 29 Jan 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Apple Pie Lane, Hartshill Green, Hartshill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Warwickshire County Council on 1 Nov 2024 at 11:53.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on New Street, Baddesley Ensor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 14:19.
27 Jan and 14 Feb 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Vicarage Street, Nuneaton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 5 Nov 2024 at 15:28.
27 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Princes Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:21.
27 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Princes Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 13:28.
3 and 5 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Amos Avenue, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 15:51.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fitton Street, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:02.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fitton Street, Nuneaton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:13.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Frank Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:00.
3 and 6 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Birmingham Road, Ansley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 10:07.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Frank Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:00.
4 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on The Raywoods, Stockingford, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:56.
5 and 26 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Church Lane, Little London, Fillongley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 19 Nov 2024 at 11:39.
5 and 26 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Coventry Road, Fillongley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 19 Nov 2024 at 11:41.
5 and 7 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shawbury Lane, Fillongley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 09:48.
10 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harold Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:59.
10 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harold Street, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 14:05.
10 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Newdigate Road, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:26.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, Fillongley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 15:12.
11 and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Norman Avenue, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:00.
11 and 14 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Portland Drive, Whittleford, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 09:59.
16 and 23 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Gipsy Lane, Whitestone, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 7 Nov 2024 at 12:44.
17 and 20 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Mitchell Road, Bedworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 21 Aug 2024 at 10:34.
17 Feb and 14 Mar 2025
Warwickshire County Council are proposing to carry out Highway improvement works on High Street, Bedworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 14:54.
17 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Wood Lane, Higham On The Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 08:47.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shawbury Lane, Fillongley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 11:46.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shawbury Lane, Fillongley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 15:33.
18 and 20 Feb 2025
Warwickshire County Council are proposing to carry out Highway improvement works on Camborne Drive, Horeston Grange, Nuneaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 7 Nov 2024 at 06:36.
Roadworks Map near to The Larches, NUNEATON, CV10 0GL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Larches, NUNEATON, CV10 0GL (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Nov 2024 - 3 Dec 2024)
(Scheduled: 18 Nov 2024 - 25 Nov 2024)
(Scheduled: 30 Oct 2024 - 6 Dec 2024)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)