ROADWORKS SUMMARY
Essex Gardens, BIRCHINGTON, CT7 9TW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Essex Gardens, CT7 9TW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Essex Gardens, BIRCHINGTON, CT7 9TW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Essex Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Margate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 12:27.

Kent County Council logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Gore Street

Kent County Council are proposing to carry out Highway improvement works on Gore Street, Monkton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 08:53.

Kent County Council logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Gore Street

Kent County Council are carrying out Highway improvement works on Gore Street, Monkton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 00:01 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 13:03.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Friends Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Friends Avenue, Margate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 11:37.

Southern Gas Networks logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Garlinge, Margate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 12:52 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 13:03.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Queen Elizabeth Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Queen Elizabeth Avenue, Margate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 12:30 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:01.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Northdown Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Northdown Park Road, Margate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 12:30 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:00.

Southern Gas Networks logo
Friday
Details
View Map
Share
Crow Hill Road

Southern Gas Networks carried out Utility repair and maintenance works on Crow Hill Road, Margate.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 12 May 2025 and 6 Jun 2025 and were actually completed between 13 May 2025 (09:00) and 3 Jun 2025 (10:00). The works impacted the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 10:40.

Kent County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Margate Road

Kent County Council are proposing to carry out Highway improvement works on Margate Road, Ramsgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Mar 2025 at 15:28.

Kent County Council logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Margate Road

Kent County Council are carrying out Highway improvement works on Margate Road, Ramsgate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:05 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 May 2025 at 07:10.

Kent County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Newlands Road

Kent County Council are proposing to carry out Highway improvement works on Newlands Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 6 Mar 2025 at 13:46.

Kent County Council logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Newlands Road

Kent County Council are carrying out Highway improvement works on Newlands Road, Ramsgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 07:04 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 19 May 2025 at 07:10.

Kent County Council logo
LONG TERM
Between
19 May and 20 Jun 2025
Details
View Map
Share
Follow
Alfred Road

Kent County Council are proposing to carry out Highway improvement works on Alfred Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Mar 2025 at 09:56.

Kent County Council logo
LONG TERM
Between
19 May and 20 Jun 2025
Details
View Map
Share
Follow
Alfred Road

Kent County Council are proposing to carry out Highway improvement works on Alfred Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 May 2025 at 09:09.

Southern Gas Networks logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Friends Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Friends Avenue, Margate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 09:00 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 09:56.

Southern Gas Networks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Millmead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Millmead Road, Margate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 09:00 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 09:48.

Southern Gas Networks logo
LONG TERM
Between
27 May and 3 Aug 2025
Details
View Map
Share
Follow
Tivoli Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tivoli Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 09:40.

Southern Gas Networks logo
LONG TERM
Between
27 May and 4 Jul 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Westgate On Sea.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 15:08.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Argyle Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Argyle Avenue, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 11:20.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Millers Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Millers Lane, Monkton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 13:00 and could run through until 9 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:29.

Kent County Council logo
Until
29 Jun 2025
Details
View Map
Share
Follow
Mount Green Avenue

Kent County Council are carrying out Highway improvement works on Mount Green Avenue, Ramsgate.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 09:28.

UK Power Networks South Eastern logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Vincent Road

UK Power Networks South Eastern are proposing to carry out New service connection on Vincent Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Mar 2025 at 09:24.

UK Power Networks South Eastern logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Vincent Road

UK Power Networks South Eastern are carrying out New service connection on Vincent Road, Margate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 08:54.

UK Power Networks South Eastern logo
Between
2 and 10 Jun 2025
Details
View Map
Share
Follow
Manston Road

UK Power Networks South Eastern are proposing to carry out New service connection on Manston Road, North, Manston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Mar 2025 at 09:22.

UK Power Networks South Eastern logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Manston Road

UK Power Networks South Eastern are carrying out New service connection on Manston Road, North, Manston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 08:54.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Belmont Road

Southern Water were proposing to carry out Utility repair and maintenance works on Belmont Road, Westgate On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Apr 2025 at 10:33.

Kent County Council logo
LONG TERM
Until
22 Sep 2025
Details
View Map
Share
Follow
Hartsdown Road

Kent County Council are carrying out Highway improvement works on Hartsdown Road, Margate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 15:52.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 22 Aug 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Garlinge, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 09:27.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Margate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 13:02.

Southern Gas Networks logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Maynard Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maynard Avenue, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 09:33.

Kent County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Pullman Close

Kent County Council are carrying out Highway improvement works on Pullman Close, Ramsgate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 June 2025 at 07:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 May 2025 at 11:18.

UK Power Networks South Eastern logo
Between
4 and 11 Jun 2025
Details
View Map
Share
Follow
St Mildreds Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on St Mildreds Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Mar 2025 at 13:53.

UK Power Networks South Eastern logo
Between
4 and 11 Jun 2025
Details
View Map
Share
Follow
St Mildreds Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on St Mildreds Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Mar 2025 at 09:42.

Kent County Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Margate Road

Kent County Council are proposing to carry out Highway improvement works on Margate Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 6 Mar 2025 at 13:44.

Kent County Council logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Margate Road

Kent County Council are proposing to carry out Highway improvement works on Margate Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 6 Mar 2025 at 15:32.

Nexfibre Networks Limited logo
Between
10 and 17 Jun 2025
Details
View Map
Share
St Mildreds Road

Nexfibre Networks Limited were proposing to carry out Utility asset works on St Mildreds Road, Minster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 17 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 8 Apr 2025 at 09:34.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
St Peters Road

Southern Water are proposing to carry out Utility repair and maintenance works on St Peters Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 26 Feb 2025 at 15:21.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
St Peters Road

Southern Water are proposing to carry out Utility repair and maintenance works on St Peters Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 6 May 2025 at 08:08.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Bath Road

Southern Water are proposing to carry out Utility repair and maintenance works on Bath Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 21 Mar 2025 at 13:07.

Southern Water logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Bath Road

Southern Water are proposing to carry out Utility repair and maintenance works on Bath Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 6 May 2025 at 08:09.

BT logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Foads Lane

BT are proposing to carry out Utility asset works on Foads Lane, Kent, Cliffsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 20 Mar 2025 at 13:30.

BT logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Foads Lane

BT are proposing to carry out Utility asset works on Foads Lane, Kent, Cliffsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 22 May 2025 at 14:24.

Kent County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Plucks Gutter

Kent County Council are proposing to carry out Highway improvement works on Plucks Gutter, Plucks Gutter, Stourmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Apr 2025 at 16:23.

Kent County Council logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Plucks Gutter

Kent County Council are proposing to carry out Highway improvement works on Plucks Gutter, Plucks Gutter, Stourmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Apr 2025 at 15:45.

Kent County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Gore Street

Kent County Council are proposing to carry out Highway improvement works on Gore Street, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Apr 2025 at 07:55.

Kent County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Gore Street

Kent County Council are proposing to carry out Highway improvement works on Gore Street, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Apr 2025 at 10:06.

Kent County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Monkton Road

Kent County Council are proposing to carry out Highway improvement works on Monkton Road, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 27 Mar 2025 at 13:30.

Southern Gas Networks logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
The Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Grove, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:12.

Southern Gas Networks logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
The Grove

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on The Grove, Westgate On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Feb 2025 at 10:58.

Southern Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Princes Street

Southern Water are proposing to carry out Utility repair and maintenance works on Princes Street, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Mar 2025 at 08:49.

Southern Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Princes Street

Southern Water are proposing to carry out Utility repair and maintenance works on Princes Street, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 May 2025 at 08:09.

UK Power Networks South Eastern logo
Between
17 and 20 Jun 2025
Details
View Map
Share
Follow
Manston Road

UK Power Networks South Eastern are proposing to carry out New service connection on Manston Road, North, Manston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Mar 2025 at 14:47.

Southern Gas Networks logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crow Hill Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 09:29.

Southern Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Kent Road

Southern Water are proposing to carry out New service connection on Kent Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 1 Apr 2025 at 13:28.

Southern Gas Networks logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Waverley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 09:35.

Southern Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Holly Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Holly Lane, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 1 Apr 2025 at 13:12.

Southern Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Holly Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Holly Lane, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 May 2025 at 08:41.

Southern Water logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Margate Road

Southern Water are proposing to carry out Utility repair and maintenance works on Margate Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 4 Apr 2025 at 15:42.

Southern Water logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Margate Road

Southern Water are proposing to carry out Utility repair and maintenance works on Margate Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 12 May 2025 at 08:42.

Southern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Westgate On Sea.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 10:16.

Southern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:16.

Southern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Queens Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Queens Road, Westgate On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 13:45.

Southern Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Madeira Road

Southern Water are proposing to carry out Utility repair and maintenance works on Madeira Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 9 Apr 2025 at 12:11.

Southern Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Madeira Road

Southern Water are proposing to carry out Utility repair and maintenance works on Madeira Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 29 May 2025 at 09:02.

Southern Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Foads Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Foads Lane, Cliffsend.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 Apr 2025 at 15:19.

Southern Gas Networks logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Argyle Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Argyle Avenue, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 09:37.

Kent County Council logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Richborough Way

Kent County Council are proposing to carry out Highway improvement works on Richborough Way, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 12:07.

Kent County Council logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Richborough Way

Kent County Council are proposing to carry out Highway improvement works on Richborough Way, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 14:11.

Kent County Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Hengist Way

Kent County Council are proposing to carry out Highway improvement works on Hengist Way, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 12:07.

Kent County Council logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Hengist Way

Kent County Council are proposing to carry out Highway improvement works on Hengist Way, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 14:15.

Southern Water logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Valley Road

Southern Water are proposing to carry out Utility repair and maintenance works on Valley Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 22 Apr 2025 at 09:39.

Southern Water logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Valley Road

Southern Water are proposing to carry out Utility repair and maintenance works on Valley Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 May 2025 at 09:02.

Kent County Council logo
Between
14 and 19 Jul 2025
Details
View Map
Share
Richborough Way

Kent County Council were proposing to carry out Highway improvement works on Richborough Way, Ramsgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 19 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 15:16.

Kent County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, St Nicholas At Wade, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 12:00.

Kent County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, St Nicholas At Wade, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 14:12.

Kent County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Heart In Hand Road To Boundary, Chislet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Jan 2025 at 10:30.

Kent County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Heart In Hand Road To Boundary, Chislet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Feb 2025 at 15:31.

Kent County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Heart In Hand Road To Boundary, Chislet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 7 Feb 2025 at 07:51.

Kent County Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Willetts Hill

Kent County Council are proposing to carry out Highway improvement works on Willetts Hill, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 20 May 2025 at 09:25.

Kent County Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Willetts Hill

Kent County Council are proposing to carry out Highway improvement works on Willetts Hill, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 3 Jun 2025 at 08:22.

Kent County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Manston Road

Kent County Council are proposing to carry out Highway improvement works on Manston Road, Margate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 26 Feb 2025 at 08:23.

Kent County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Manston Road

Kent County Council were proposing to carry out Highway improvement works on Manston Road, Margate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Apr 2025 at 15:21.

Kent County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Shottendane Road

Kent County Council are proposing to carry out Highway improvement works on Shottendane Road, Margate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 26 Feb 2025 at 08:22.

Kent County Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Shottendane Road

Kent County Council were proposing to carry out Highway improvement works on Shottendane Road, Margate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Apr 2025 at 15:21.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
St James Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St James Park Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Margate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 10:17.

Southern Gas Networks logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
St James Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St James Park Road, Margate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2025 at 13:32.

Kent County Council logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, St Nicholas At Wade, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 12:00.

Kent County Council logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, St Nicholas At Wade, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Jan 2025 at 14:12.

Kent County Council logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Heart In Hand Road To Boundary, Chislet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Jan 2025 at 10:53.

Kent County Council logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Heart In Hand Road To Boundary, Chislet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Jan 2025 at 15:39.

UK Power Networks South Eastern logo
Between
23 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Manston Road

UK Power Networks South Eastern are proposing to carry out New service connection on Manston Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Mar 2025 at 10:40.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Millmead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Millmead Road, Margate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 11:01.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 09:50.

Southern Gas Networks logo
Between
24 and 31 Jul 2025
Details
View Map
Share
Follow
Wellesley Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Wellesley Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 14:19.

Southern Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Paramour Street

Southern Water are proposing to carry out Utility repair and maintenance works on Paramour Street, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Apr 2025 at 14:15.

Nexfibre Networks Limited logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
St Mildreds Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on St Mildreds Road, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Apr 2025 at 15:50.

Nexfibre Networks Limited logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
St Mildreds Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on St Mildreds Road, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Apr 2025 at 08:10.

Kent County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Minster Road

Kent County Council are proposing to carry out Highway improvement works on Minster Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 30 May 2025 at 12:13.

Southern Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Royal Crescent

Southern Water are proposing to carry out Utility repair and maintenance works on Royal Crescent, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 24 Apr 2025 at 13:51.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
St James Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St James Park Road, Margate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 10:37.

Kent County Council logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Edgar Road

Kent County Council are proposing to carry out Highway improvement works on Edgar Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 May 2025 at 09:23.

Kent County Council logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Edgar Road

Kent County Council are proposing to carry out Highway improvement works on Edgar Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 May 2025 at 10:21.

Southern Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Bath Place

Southern Water are proposing to carry out Utility repair and maintenance works on Bath Place, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 21 May 2025 at 13:53.

Southern Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Market Place

Southern Water are proposing to carry out New service connection on Market Place, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 21 May 2025 at 13:59.

Kent County Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Manston Road

Kent County Council are proposing to carry out Highway improvement works on Manston Road, East, Manston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 13:33.

Kent County Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Manston Road

Kent County Council are proposing to carry out Highway improvement works on Manston Road, East, Manston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 15:44.

Kent County Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Manston Court Road

Kent County Council are proposing to carry out Highway improvement works on Manston Court Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 13:33.

Kent County Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Manston Court Road

Kent County Council are proposing to carry out Highway improvement works on Manston Court Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 15:44.

BT logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Monkton Road

BT are proposing to carry out Utility repair and maintenance works on Monkton Road, Kent, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 May 2025 at 15:23.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Monkton Road

BT are proposing to carry out Utility repair and maintenance works on Monkton Road, Kent, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 May 2025 at 15:41.

UK Power Networks South Eastern logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Manston Road

UK Power Networks South Eastern are proposing to carry out New service connection on Manston Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Apr 2025 at 09:34.

UK Power Networks South Eastern logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Manston Road

UK Power Networks South Eastern are proposing to carry out New service connection on Manston Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Apr 2025 at 11:09.

UK Power Networks South Eastern logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Princess Margaret Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Princess Margaret Avenue, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 May 2025 at 13:47.

Southern Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Dane Hill Row

Southern Water are proposing to carry out Utility repair and maintenance works on Dane Hill Row, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 29 May 2025 at 13:37.

Southern Water logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Clements Road

Southern Water are proposing to carry out Utility repair and maintenance works on Clements Road, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 24 Apr 2025 at 09:46.

Southern Gas Networks logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Cuthbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cuthbert Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 09:30.

Southern Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Dane Hill Row

Southern Water were proposing to carry out Utility repair and maintenance works on Dane Hill Row, Margate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 May 2025 at 12:10.


Roadworks Map near to Essex Gardens, BIRCHINGTON, CT7 9TW (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 21:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Essex Gardens, BIRCHINGTON, CT7 9TW (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
SHERWOOD ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.2
Details
Share
Follow
2
Southern Water logo
HUNTING GATE 
(0.5 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.5
Details
Share
Follow
3
Kent County Council logo
MAJOR
  
ALFRED ROAD 
(0.9 miles)
Kent County Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 19 May 2025 - 20 Jun 2025
0.9
Details
Share
Follow
4
Kent County Council logo
MAJOR
  
ALFRED ROAD 
(0.9 miles)
Kent County Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 19 May 2025 - 20 Jun 2025
0.9
Details
Share
Follow
5
Kent County Council logo
MAJOR
  
CANTERBURY ROAD, EAST 
(1.0 miles)
Kent County Council
Optional permit (no fee) e.g. for traffic management etc - Verge - No carriageway incursion
In Progress
Since: 18 Apr 2025 09:00
(Scheduled: 18 Apr 2025 - 28 Sep 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.