ROADWORKS SUMMARY
Wantsum Way, BIRCHINGTON, CT7 0NE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wantsum Way, CT7 0NE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wantsum Way, BIRCHINGTON, CT7 0NE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wantsum Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
May Street

Kent County Council are carrying out Highway improvement works on May Street, North Of Bogshole Lane, Herne Bay.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 31 Jul 2024 at 11:24.

Kent County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Gore Street

Kent County Council are carrying out Highway improvement works on Gore Street, Monkton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 00:01 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Jun 2024 at 10:10.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 09:03.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Minster Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Minster Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 11:54.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ethelred Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ethelred Road, Westgate On Sea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 19:00 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 08:11.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Richborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Richborough Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 09:03.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Richborough Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Richborough Road, Westgate On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 15:05.

Southern Gas Networks logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Westgate Bay Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Westgate Bay Avenue, Westgate On Sea.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 09:51.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Westgate Bay Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate Bay Avenue, Westgate On Sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 12:17.

Southern Gas Networks logo
Until
14 Mar 2025
Details
View Map
Share
Follow
Adrian Square

Southern Gas Networks are carrying out Utility repair and maintenance works on Adrian Square, Westgate On Sea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 09:00 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 13:20.

Southern Gas Networks logo
Until
21 Mar 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Canterbury Road, Westgate On Sea.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 February 2025 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 08:29.

Southern Gas Networks logo
Until
14 Mar 2025
Details
View Map
Share
Follow
Ethelbert Square

Southern Gas Networks are carrying out Utility repair and maintenance works on Ethelbert Square, Westgate On Sea.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 13:22.

Southern Gas Networks logo
Until
12 Mar 2025
Details
View Map
Share
Follow
Mickleburgh Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Mickleburgh Hill, Herne Bay.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2025 at 09:00 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 11:32.

Southern Water logo
Between
2 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Nov 2024 at 10:14.

Kent County Council logo
LONG TERM
Between
3 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Tothill Street

Kent County Council are proposing to carry out Highway improvement works on Tothill Street, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 7 Nov 2024 at 14:17.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Southern Water are proposing to carry out New service connection on Station Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Dec 2024 at 14:30.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Southern Water are carrying out New service connection on Station Road, Birchington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 05:55 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 3 Mar 2025 at 08:37.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Grenham Bay Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Grenham Bay Avenue, Birchington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2025 at 09:00 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 11:12.

South East Water logo
Finishing
Monday
Details
View Map
Share
Follow
North Stream

South East Water are carrying out Utility repair and maintenance works on North Stream, Marshside.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2025 at 10:54 and could run through until 10 March 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 5 Mar 2025 at 14:07.

Southern Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Crow Hill Road

Southern Water were proposing to carry out Utility repair and maintenance works on Crow Hill Road, Margate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Jan 2025 at 08:03.

Nexfibre Networks Limited logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Hilary Close Path

Nexfibre Networks Limited are proposing to carry out Utility asset works on Hilary Close Path, Off Hilary Close, Herne Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Jan 2025 at 11:04.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Margate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Feb 2025 at 14:29.

Nexfibre Networks Limited logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Hilary Close Path

Nexfibre Networks Limited are proposing to carry out Utility asset works on Hilary Close Path, Off Hilary Close, Herne Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 16 Jan 2025 at 14:41.

Kent County Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Grove Road

Kent County Council are proposing to carry out Highway improvement works on Grove Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 15 Jan 2025 at 15:35.

Southern Gas Networks logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
St Benets Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Benets Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 12:05.

Nexfibre Networks Limited logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Barley Close

Nexfibre Networks Limited are proposing to carry out Utility asset works on Barley Close, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 16 Jan 2025 at 14:35.

Nexfibre Networks Limited logo
Between
18 and 21 Mar 2025
Details
View Map
Share
Follow
Barley Close

Nexfibre Networks Limited are proposing to carry out Utility asset works on Barley Close, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Jan 2025 at 10:19.

Nexfibre Networks Limited logo
Between
20 and 26 Mar 2025
Details
View Map
Share
Follow
Harvest Court

Nexfibre Networks Limited are proposing to carry out Utility asset works on Harvest Court, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Jan 2025 at 09:55.

Nexfibre Networks Limited logo
Between
20 and 26 Mar 2025
Details
View Map
Share
Follow
Harvest Court

Nexfibre Networks Limited are proposing to carry out Utility asset works on Harvest Court, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 16 Jan 2025 at 14:38.

Southern Gas Networks logo
LONG TERM
Between
24 Mar and 30 May 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 11:01.

UK Power Networks South Eastern logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Bedlam Court Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Bedlam Court Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Feb 2025 at 09:50.

UK Power Networks South Eastern logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Bedlam Court Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Bedlam Court Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Jan 2025 at 15:58.

Southern Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Shottendane Road

Southern Water are proposing to carry out Utility repair and maintenance works on Shottendane Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Dec 2024 at 11:01.

Southern Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Belmont Road

Southern Water were proposing to carry out Utility repair and maintenance works on Belmont Road, Westgate On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 25 Nov 2024 at 15:43.

Southern Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Grove Road

Southern Water are proposing to carry out Utility repair and maintenance works on Grove Road, Wickhambreaux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 7 Jan 2025 at 08:57.

South East Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Nethergong Hill

South East Water are proposing to carry out New service connection on Nethergong Hill, Upstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Jan 2025 at 10:37.

South East Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Nethergong Hill

South East Water are proposing to carry out New service connection on Nethergong Hill, Upstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 3 Mar 2025 at 15:11.

Kent County Council logo
LONG TERM
Between
1 Apr and 19 May 2025
Details
View Map
Share
Follow
The Sycamores

Kent County Council are proposing to carry out Highway repair and maintenance works on The Sycamores, Hersden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 13 Feb 2025 at 09:10.

Kent County Council logo
LONG TERM
Between
1 Apr and 19 May 2025
Details
View Map
Share
Follow
Island Road

Kent County Council are proposing to carry out Highway improvement works on Island Road, Hersden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 13 Feb 2025 at 09:09.

Southern Gas Networks logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Shottendane Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shottendane Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 09:06.

UK Power Networks South Eastern logo
Between
4 and 8 Apr 2025
Details
View Map
Share
Follow
The Street

UK Power Networks South Eastern are proposing to carry out New service connection on The Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 8 April 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2025 at 16:42.

UK Power Networks South Eastern logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Ebbsfleet Lane North

UK Power Networks South Eastern are proposing to carry out New service connection on Ebbsfleet Lane North, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 12:26.

UK Power Networks South Eastern logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Ebbsfleet Lane North

UK Power Networks South Eastern are proposing to carry out New service connection on Ebbsfleet Lane North, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 09:50.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Shottendane Road

Southern Water were proposing to carry out Utility repair and maintenance works on Shottendane Road, Birchington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Dec 2024 at 12:57.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Water are proposing to carry out Utility repair and maintenance works on Canterbury Road, Herne Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Mar 2025 at 09:33.

Southern Water logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Shottendane Road

Southern Water are proposing to carry out Utility repair and maintenance works on Shottendane Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Dec 2024 at 09:12.

Southern Water logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Follow
Shottendane Road

Southern Water are proposing to carry out Utility repair and maintenance works on Shottendane Road, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 25 Feb 2025 at 13:08.

UK Power Networks South Eastern logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Monkton Street

UK Power Networks South Eastern are proposing to carry out New service connection on Monkton Street, Monkton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Jan 2025 at 08:54.

Southern Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Cop Street Road

Southern Water are proposing to carry out Remedial works on Cop Street Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 16 Jan 2025 at 17:02.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 4 Jul 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Garlinge, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Feb 2025 at 11:35.

Southern Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Park Lane

Southern Water are proposing to carry out Permanent reinstatement on Park Lane, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Jan 2025 at 09:31.

Southern Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Park Lane

Southern Water are proposing to carry out Permanent reinstatement on Park Lane, Birchington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Jan 2025 at 11:27.

Southern Water logo
Between
23 and 29 Apr 2025
Details
View Map
Share
Follow
Grove Road

Southern Water are proposing to carry out Utility repair and maintenance works on Grove Road, Wickhambreaux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 26 Feb 2025 at 09:49.

Southern Water logo
Between
23 and 29 Apr 2025
Details
View Map
Share
Follow
Grove Road

Southern Water are proposing to carry out Utility repair and maintenance works on Grove Road, Wickhambreaux.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 20 Jan 2025 at 09:50.

Southern Gas Networks logo
Between
28 Apr and 9 May 2025
Details
View Map
Share
Follow
Hillcroft Road

Southern Gas Networks are proposing to carry out Remedial works on Hillcroft Road, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 08:27.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Foxborough Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Foxborough Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Jan 2025 at 11:48.

Southern Gas Networks logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Laundry Road

Southern Gas Networks are proposing to carry out Remedial works on Laundry Road, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 11:05.

Southern Gas Networks logo
Between
28 Apr and 6 May 2025
Details
View Map
Share
Follow
Hillcroft Road

Southern Gas Networks are proposing to carry out Remedial works on Hillcroft Road, Herne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 19:28.

Southern Gas Networks logo
Between
5 and 23 May 2025
Details
View Map
Share
Follow
Crow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crow Hill Road, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Feb 2025 at 11:35.

Southern Gas Networks logo
Between
5 and 30 May 2025
Details
View Map
Share
Follow
Richborough Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Richborough Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 11:01.

Kent County Council logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Owls Hatch To Heart In Hand Road, Herne And Broomfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Feb 2025 at 08:28.

Kent County Council logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, St Nicholas At Wade, Birchington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Mar 2025 at 08:48.

Kent County Council logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, St Nicholas At Wade, Birchington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Feb 2025 at 15:36.

Kent County Council logo
Between
6 and 21 May 2025
Details
View Map
Share
Follow
Thanet Way

Kent County Council are proposing to carry out Highway improvement works on Thanet Way, Heart In Hand Road To Boundary, Chislet.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 Feb 2025 at 08:23.

Nexfibre Networks Limited logo
Between
7 and 14 May 2025
Details
View Map
Share
Follow
Tothill Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Tothill Street, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Mar 2025 at 16:03.

Southern Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Hoaden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Hoaden Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 6 Feb 2025 at 16:04.

Nexfibre Networks Limited logo
Between
7 and 16 May 2025
Details
View Map
Share
Follow
Foxborough Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Foxborough Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Mar 2025 at 15:13.

Nexfibre Networks Limited logo
Between
7 and 14 May 2025
Details
View Map
Share
Follow
Foxborough Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Foxborough Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Mar 2025 at 15:47.

Nexfibre Networks Limited logo
Between
7 and 16 May 2025
Details
View Map
Share
Follow
Tothill Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Tothill Street, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Mar 2025 at 15:10.

South East Water logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Highstead

South East Water are proposing to carry out New service connection on Highstead, Chislet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 5 Mar 2025 at 10:44.

Southern Water logo
Between
19 and 23 May 2025
Details
View Map
Share
Follow
Foxborough Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Foxborough Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 29 Jan 2025 at 15:10.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Wass Drove

Southern Water are proposing to carry out Utility repair and maintenance works on Wass Drove, Westmarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 26 Feb 2025 at 11:50.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Wass Drove

Southern Water are proposing to carry out Utility repair and maintenance works on Wass Drove, Westmarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 24 Feb 2025 at 14:44.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Hoaden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Hoaden Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 24 Feb 2025 at 14:24.

Southern Water logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Hoaden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Hoaden Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 26 Feb 2025 at 13:21.

Southern Gas Networks logo
LONG TERM
Between
27 May and 4 Jul 2025
Details
View Map
Share
Follow
Canterbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canterbury Road, Westgate On Sea.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 15:08.

Southern Water logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Belmont Road

Southern Water are proposing to carry out Utility repair and maintenance works on Belmont Road, Westgate On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 11 Dec 2024 at 16:13.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 22 Aug 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Garlinge, Margate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 09:27.


Roadworks Map near to Wantsum Way, BIRCHINGTON, CT7 0NE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 5 Mar 2025 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wantsum Way, BIRCHINGTON, CT7 0NE (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
National Highways logo
MAJOR
  
THANET WAY, ST NICHOLAS AT WADE 
(0.3 miles)
National Highways
Diversionary works - Carriageway - Some carriageway incursion
Planned
Scheduled: 27 Feb 2025 - 31 Mar 2025
0.3
Details
Share
Follow
2
National Highways logo
MAJOR
  
THANET WAY, ST NICHOLAS AT WADE 
(0.3 miles)
National Highways
Diversionary works - Carriageway - Some carriageway incursion
In Progress
Since: 27 Feb 2025 20:00
(Scheduled: 27 Feb 2025 - 31 Mar 2025)
0.3
Details
Share
Follow