ROADWORKS SUMMARY
Woodland Way, SANDWICH, CT13 0NG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Woodland Way, CT13 0NG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Woodland Way, SANDWICH, CT13 0NG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodland Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Sandown Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandown Road, Sandwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 08:30 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 09:21.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Farm Lane

Nexfibre Networks Limited are carrying out Utility asset works on Farm Lane, Sholden.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 11:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 23 Jan 2025 at 14:45.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Street

Nexfibre Networks Limited are carrying out Utility asset works on The Street, Sholden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 13:10 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 13 Jan 2025 at 15:07.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Street, Sholden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 7 Nov 2024 at 12:03.

Nexfibre Networks Limited logo
Finishing
Monday
Details
View Map
Share
Tothill Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Tothill Street, Minster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 29 Nov 2024 at 10:40.

Southern Gas Networks logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Sandown Lees

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandown Lees, Sandwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:00 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 08:04.

Nexfibre Networks Limited logo
Finishing
Tomorrow
Details
View Map
Share
Fisher Street

Nexfibre Networks Limited were proposing to carry out Utility asset works on Fisher Street, Sandwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 30 Oct 2024 at 09:15.

Nexfibre Networks Limited logo
Finishing
Monday
Details
View Map
Share
Monkton Road

Nexfibre Networks Limited were proposing to carry out Utility asset works on Monkton Road, Minster.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 09:12.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sandwich Road

Southern Water are proposing to carry out Utility repair and maintenance works on Sandwich Road, Nonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Nov 2024 at 10:20.

Kent County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
New Street

Kent County Council are proposing to carry out Section 50 on New Street, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 11:54.

Kent County Council logo
Until
7 Feb 2025
Details
View Map
Share
Follow
New Street

Kent County Council are carrying out Section 50 on New Street, Ash.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 27 Jan 2025 at 11:29.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:32.

Kent County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Monkton Road

Kent County Council are proposing to carry out Works for road purposes on Monkton Road, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Dec 2024 at 08:47.

Nexfibre Networks Limited logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Fisher Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Fisher Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 13:57.

Nexfibre Networks Limited logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Nelson Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Nelson Street, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Nov 2024 at 09:35.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Church Street

Southern Water were proposing to carry out Utility repair and maintenance works on Church Street, Nonington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 14:00.

Nexfibre Networks Limited logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Nelson Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Nelson Street, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Nov 2024 at 10:25.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Park Avenue

Southern Water are proposing to carry out Utility repair and maintenance works on Park Avenue, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Jan 2025 at 14:05.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Park Avenue

Southern Water are proposing to carry out Utility repair and maintenance works on Park Avenue, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Nov 2024 at 11:29.

Nexfibre Networks Limited logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Fisher Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Fisher Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 15:21.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Gore Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Gore Lane, Eastry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Nov 2024 at 11:36.

Southern Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Gore Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Gore Lane, Eastry.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 23 Jan 2025 at 09:42.

Southern Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Beaconsfield Road

Southern Water are proposing to carry out Utility repair and maintenance works on Beaconsfield Road, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 10:45.

Southern Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Beaconsfield Road

Southern Water were proposing to carry out Utility repair and maintenance works on Beaconsfield Road, Deal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Jan 2025 at 09:39.

Southern Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Beaconsfield Road

Southern Water were proposing to carry out Utility repair and maintenance works on Beaconsfield Road, Deal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 10:07.

Southern Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Wellington Road

Southern Water were proposing to carry out Utility repair and maintenance works on Wellington Road, Deal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 14:05.

Nexfibre Networks Limited logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Ark Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ark Lane, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 24 Jan 2025 at 09:21.

Nexfibre Networks Limited logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Ark Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Ark Lane, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 14 Nov 2024 at 10:27.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Water Street

Southern Water are proposing to carry out Utility repair and maintenance works on Water Street, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 22 Nov 2024 at 12:18.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Adisham Road

Southern Water are proposing to carry out Remedial works on Adisham Road, Wingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 14 Nov 2024 at 15:06.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sandwich Road

UK Power Networks South Eastern are proposing to carry out New service connection on Sandwich Road, Nonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Nov 2024 at 16:56.

Southern Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Street

Southern Water are proposing to carry out Utility repair and maintenance works on Church Street, Nonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 14:28.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sandwich Road

UK Power Networks South Eastern are proposing to carry out New service connection on Sandwich Road, Nonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 14:22.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Paradise Row

Southern Water are proposing to carry out Utility repair and maintenance works on Paradise Row, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Dec 2024 at 11:25.

Southern Water logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Wellington Road

Southern Water are proposing to carry out Utility repair and maintenance works on Wellington Road, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 15:00.

Southern Gas Networks logo
Between
19 and 26 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jan 2025 at 09:10.

Southern Gas Networks logo
Between
19 and 26 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 14:31.

UK Power Networks South Eastern logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Foxborough Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Foxborough Hill, Woodnesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Jan 2025 at 08:00.

UK Power Networks South Eastern logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Foxborough Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Foxborough Hill, Woodnesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Dec 2024 at 10:52.

BT logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Ware Road

BT are proposing to carry out Utility asset works on Ware Road, Kent, Ware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 29 Nov 2024 at 09:58.

BT logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Ware Road

BT are proposing to carry out Utility asset works on Ware Road, Kent, Ware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 2 Dec 2024 at 11:45.

Southern Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Wass Drove

Southern Water are proposing to carry out New service connection on Wass Drove, Westmarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 11 Dec 2024 at 14:26.

Southern Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Rusham Road

Southern Water are proposing to carry out Utility repair and maintenance works on Rusham Road, Shatterling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 16:29.

Southern Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Wass Drove

Southern Water were proposing to carry out New service connection on Wass Drove, Westmarsh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 11 Dec 2024 at 12:01.

Southern Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Perry Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Perry Lane, Wingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 10:03.

Southern Water logo
Between
26 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Wass Drove

Southern Water are proposing to carry out New service connection on Wass Drove, Westmarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 4 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 12 Dec 2024 at 10:44.

Southern Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Water Street

Southern Water are proposing to carry out Utility repair and maintenance works on Water Street, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 25 Nov 2024 at 13:59.

Affinity Water - South East logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Church Hill

Affinity Water - South East are proposing to carry out Utility repair and maintenance works on Church Hill, Eythorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water - South East on 24 Jan 2025 at 14:07.

Affinity Water - South East logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Church Hill

Affinity Water - South East are proposing to carry out Utility repair and maintenance works on Church Hill, Eythorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water - South East on 5 Dec 2024 at 10:57.

Kent County Council logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Poulton Lane

Kent County Council are proposing to carry out Section 50 on Poulton Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 20 Jan 2025 at 14:46.

Kent County Council logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Poulton Lane

Kent County Council are proposing to carry out Section 50 on Poulton Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 20 Jan 2025 at 15:33.

Electricity Network Company logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Sandwich Road

Electricity Network Company are proposing to carry out Utility asset works on Sandwich Road, Nonington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 19 Dec 2024 at 16:49.

Southern Water logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Strakers Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Strakers Hill, West Studdal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 28 Nov 2024 at 16:39.

Kent County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Knightrider Street

Kent County Council are proposing to carry out Highway repair and maintenance works on Knightrider Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 Dec 2024 at 10:24.

Kent County Council logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Grove Road

Kent County Council are proposing to carry out Highway improvement works on Grove Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 15 Jan 2025 at 15:35.

Southern Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Downs Road

Southern Water were proposing to carry out Utility repair and maintenance works on Downs Road, East Studdal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Dec 2024 at 12:25.

Southern Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Downs Road

Southern Water are proposing to carry out Utility repair and maintenance works on Downs Road, East Studdal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Dec 2024 at 16:07.

Southern Water logo
Between
11 and 17 Mar 2025
Details
View Map
Share
Follow
Claremont Road

Southern Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 18 Dec 2024 at 17:37.

Southern Water logo
Between
12 and 18 Mar 2025
Details
View Map
Share
Follow
Thornton Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Thornton Lane, Eastry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 10 Dec 2024 at 10:04.

UK Power Networks South Eastern logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Robert Street

UK Power Networks South Eastern are proposing to carry out Utility asset works on Robert Street, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jan 2025 at 10:09.

UK Power Networks South Eastern logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Robert Street

UK Power Networks South Eastern are proposing to carry out Utility asset works on Robert Street, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Jan 2025 at 10:03.

Southern Water logo
Between
19 and 25 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Sutton Road, Ripple.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 25 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 18 Dec 2024 at 17:45.

Southern Gas Networks logo
Between
20 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out New service connection on Mill Lane, Worth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 12:20.

Southern Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Strakers Hill

Southern Water are proposing to carry out Utility repair and maintenance works on Strakers Hill, East Studdal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Dec 2024 at 09:46.

UK Power Networks South Eastern logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Bedlam Court Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Bedlam Court Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Jan 2025 at 15:58.

Kent County Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Moat Lane

Kent County Council are proposing to carry out Utility repair and maintenance works on Moat Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Jan 2025 at 14:02.

Kent County Council logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Moat Lane

Kent County Council are proposing to carry out Utility repair and maintenance works on Moat Lane, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Jan 2025 at 13:30.

Southern Water logo
Between
26 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Cottington Road

Southern Water are proposing to carry out Utility repair and maintenance works on Cottington Road, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 8 Jan 2025 at 08:48.

UK Power Networks South Eastern logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
High Street

UK Power Networks South Eastern are proposing to carry out New service connection on High Street, Eastry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Jan 2025 at 09:45.

UK Power Networks South Eastern logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
High Street

UK Power Networks South Eastern are proposing to carry out New service connection on High Street, Eastry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Jan 2025 at 16:08.

Southern Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Hills Court Road

Southern Water are proposing to carry out Utility repair and maintenance works on Hills Court Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 2 Jan 2025 at 09:47.

UK Power Networks South Eastern logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
High Street

UK Power Networks South Eastern are proposing to carry out New service connection on High Street, Eastry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 14:10.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Deal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 13:56.

Southern Gas Networks logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Darracott Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darracott Close, Deal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Deal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jan 2025 at 11:38.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Felderland Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Felderland Lane, Worth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Jan 2025 at 11:50.

UK Power Networks South Eastern logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Ebbsfleet Lane North

UK Power Networks South Eastern are proposing to carry out New service connection on Ebbsfleet Lane North, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 12:26.

UK Power Networks South Eastern logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Ebbsfleet Lane North

UK Power Networks South Eastern are proposing to carry out New service connection on Ebbsfleet Lane North, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 09:50.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 6 Jun 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Sholden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Jan 2025 at 13:08.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 6 Jun 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Sholden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 11:44.

Southern Gas Networks logo
Between
7 and 25 Apr 2025
Details
View Map
Share
Follow
Sholden New Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sholden New Road, Sholden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jan 2025 at 14:14.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Loop Street

Southern Water are proposing to carry out Utility repair and maintenance works on Loop Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 8 Jan 2025 at 16:03.

Southern Water logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Follow
Cottington Road

Southern Water are proposing to carry out Utility repair and maintenance works on Cottington Road, Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 15 Jan 2025 at 14:02.

Southern Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Lister Close

Southern Water are proposing to carry out Utility repair and maintenance works on Lister Close, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 16 Jan 2025 at 16:10.

Southern Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Cop Street Road

Southern Water are proposing to carry out Remedial works on Cop Street Road, Ash.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 16 Jan 2025 at 17:02.

Southern Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Lower Street

Southern Water are proposing to carry out Utility repair and maintenance works on Lower Street, Tilmanstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 15 Jan 2025 at 13:14.

Southern Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Mongeham Road

Southern Water are proposing to carry out Utility repair and maintenance works on Mongeham Road, Ripple.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Jan 2025 at 16:26.

Southern Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Thornton Lane

Southern Water are proposing to carry out New service connection on Thornton Lane, Eastry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 23 Jan 2025 at 09:39.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Upper Strand Street

Southern Water are proposing to carry out Utility repair and maintenance works on Upper Strand Street, Sandwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 Jan 2025 at 16:24.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Sutherland Road

Southern Water are proposing to carry out Utility repair and maintenance works on Sutherland Road, Deal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 Jan 2025 at 14:20.

Southern Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Foxborough Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Foxborough Lane, Minster, Ramsgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Jan 2025 at 11:48.


Roadworks Map near to Woodland Way, SANDWICH, CT13 0NG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Jan 2025 00:22
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Woodland Way, SANDWICH, CT13 0NG (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Kent County Council logo
DEAL ROAD 
(0.8 miles)
Kent County Council
Highway improvement works - Verge - Two-way signals
Planned
Scheduled: 31 Jan 2025 - 4 Feb 2025
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.