ROADWORKS SUMMARY
Outwood Lane, COULSDON, CR5 3LU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Outwood Lane, CR5 3LU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Outwood Lane, COULSDON, CR5 3LU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Outwood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Between
24 Mar 2025 and 8 Mar 2027
Details
View Map
Share
Duppas Hill Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Duppas Hill Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 8 March 2027. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Mar 2025 at 12:33.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Cormongers Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cormongers Lane, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Reigate Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Hill, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 08:52.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Trowers Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Trowers Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 08:47.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
School Hill

Surrey County Council were proposing to carry out Highway repair and maintenance works on School Hill, Merstham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 15:31.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Gatton Bottom

Surrey County Council were proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Feb 2025 at 12:31.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Greenways

Surrey County Council are proposing to carry out Highway repair and maintenance works on Greenways, Walton On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Sep 2024 at 14:35.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Heathcote

Surrey County Council are proposing to carry out Highway repair and maintenance works on Heathcote, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:10.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Beechdene

Surrey County Council are proposing to carry out Highway repair and maintenance works on Beechdene, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 14:34.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Kingsdene

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingsdene, Tadworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Sep 2024 at 14:38.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Succombs Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Succombs Hill, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:50.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Succombs Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Succombs Hill, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:49.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Church Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Church Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Aug 2024 at 08:06.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Burgh Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 23 Oct 2024 at 14:58.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Brighton Road Service Road From Tattenham Way To 1 Ruffetts Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road Service Road From Tattenham Way To 1 Ruffetts Way, Burgh Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 23 Oct 2024 at 15:23.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Brighton Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Brighton Road, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:10.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Nov 2024 at 21:23.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Brighton Road Service Road Between Burgh Wood And Tattenham Way

Surrey County Council were proposing to carry out Highway repair and maintenance works on Brighton Road Service Road Between Burgh Wood And Tattenham Way, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 12:06.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Brighton Road Service Road Between Burgh Wood And Tattenham Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road Service Road Between Burgh Wood And Tattenham Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Nov 2024 at 21:18.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Sep 2024 at 14:25.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Chipstead Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Aug 2024 at 09:11.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Sep 2024 at 09:30.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Montrouge Crescent

Surrey County Council are proposing to carry out Highway repair and maintenance works on Montrouge Crescent, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:22.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
High Street

Surrey County Council were proposing to carry out Highway repair and maintenance works on High Street, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Feb 2025 at 08:51.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Burgh Heath Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Burgh Heath Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 08:47.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Roundwood View

Surrey County Council are proposing to carry out Highway repair and maintenance works on Roundwood View, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 23 Oct 2024 at 15:28.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Upper Court Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Upper Court Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 06:34.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
West Street

Surrey County Council were proposing to carry out Highway repair and maintenance works on West Street, Ewell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Jul 2025 at 14:27.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Waddon Park Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Park Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Feb 2025 at 07:29.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Pendell Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Feb 2025 at 07:36.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Feb 2025 at 07:45.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Albury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Feb 2025 at 15:01.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Gatton Bottom

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Feb 2025 at 14:55.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
The Green

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Green, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Sep 2024 at 07:56.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Sep 2024 at 07:54.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Whyteleafe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 08:27.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Bolters Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bolters Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Feb 2025 at 14:41.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Oct 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Feb 2025 at 14:51.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Sutton Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Sutton Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Feb 2025 at 14:45.

Surrey County Council logo
LONG TERM
Between
2 Jun and 17 Oct 2025
Details
View Map
Share
Follow
Redvers Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Redvers Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Apr 2025 at 09:12.

Surrey County Council logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Redvers Road

Surrey County Council are carrying out Highway repair and maintenance works on Redvers Road, Warlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Jun 2025 at 09:55.

Surrey County Council logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
The Green

Surrey County Council are carrying out Highway repair and maintenance works on The Green, Warlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 1 Aug 2025 at 10:34.

Surrey County Council logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are carrying out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Jun 2025 at 09:54.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Waddon Court Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Court Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2025 at 06:46.

Surrey County Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Dean Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dean Lane, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 14 Mar 2025 at 08:01.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 14 Oct 2025
Details
View Map
Share
Follow
Marlpit Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlpit Lane, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 16:36.

Network Rail logo
LONG TERM
Between
14 Jul and 14 Nov 2025
Details
View Map
Share
Follow
West Street

Network Rail are proposing to carry out Works for Rail Purposes on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 12:25.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:15.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Northey Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Northey Avenue, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 July 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 13:51.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 10:19.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 July 2025 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 09:49.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Belmont Rise

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Belmont Rise, Cheam.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 21 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 11:03.

UK Power Networks South Eastern logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are carrying out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
3 Aug and 28 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
3 Aug and 28 Sep 2025
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 15:02.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Woodcote Grove Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Grove Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:02.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Beech Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beech Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:23.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:23.

Southern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Sandy Lane South

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandy Lane South, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 09:15 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 09:48.

Southern Gas Networks logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
St Monicas Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St Monicas Road, Kingswood.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2025 at 19:45 and could run through until 30 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 14:42.

Southern Gas Networks logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Wilbury Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Wilbury Avenue, Cheam.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 08:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 08:55.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Springfield Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Jun 2025 at 11:15.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 10:34.

London Borough Of Sutton logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Richmond Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Richmond Road, Beddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Sutton on 3 Jul 2025 at 15:13.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Outwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Outwood Lane, Chipstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 10:50.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Allenby Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allenby Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Jul 2025 at 07:21.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:03.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 14:47.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:46.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 12:36.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 14:30.

Southern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:22.

Surrey County Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Ninehams Close

Surrey County Council are carrying out Highway repair and maintenance works on Ninehams Close, Caterham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 20:04 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2025 at 15:48.

Southern Gas Networks logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 09:30 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Chaldon Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Common Road, Chaldon, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 14:19.

Thames Water logo
LONG TERM
Between
26 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:08.

London Borough Of Sutton logo
Between
28 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Chiltern Road

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 17 Jul 2025 at 08:00.

Southern Gas Networks logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Crossways

Southern Gas Networks are carrying out Utility repair and maintenance works on Crossways, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 11:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:24.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 4 Nov 2025
Details
View Map
Share
Salmons Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Salmons Lane, Whyteleafe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 4 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Apr 2025 at 14:52.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 4 Nov 2025
Details
View Map
Share
Torwood Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Torwood Lane, Whyteleafe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Apr 2025 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Norman Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 9 Oct 2025
Details
View Map
Share
Norman Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
29 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:13.

Southern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 09:31.

Southern Gas Networks logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Jul 2025 at 16:53.

Southern Gas Networks logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:14.

Southern Gas Networks logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princes Avenue, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:31.

Southern Gas Networks logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Princes Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Princes Avenue, Carshalton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 13:00 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 16:20.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:04.

T-Mobile (UK) logo
LONG TERM
Between
5 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Commonside Close

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commonside Close, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 13 Jun 2025 at 07:34.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 22 Nov 2025
Details
View Map
Share
Follow
Chaldon Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Common Road, Chaldon, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:34.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:13.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
The Warren

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:12.

Southern Gas Networks logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are carrying out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 13:00 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:26.

Southern Gas Networks logo
LONG TERM
Until
20 Nov 2025
Details
View Map
Share
Follow
Banstead Road South

Southern Gas Networks are carrying out Utility repair and maintenance works on Banstead Road South, Sutton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 16:45 and could run through until 20 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 08:40.

Southern Gas Networks logo
Until
6 Oct 2025
Details
View Map
Share
Follow
South Rise

Southern Gas Networks are carrying out Utility repair and maintenance works on South Rise, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 09:26.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Woodcote Green Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woodcote Green Road, Epsom.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 10:35 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 13:16.

Southern Gas Networks logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Bridge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bridge Road, Epsom.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 15:53 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 08:42.

Surrey County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Reigate Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Hill, Reigate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jul 2025 at 13:41.

Thames Water logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Castle Road

Thames Water are carrying out Utility repair and maintenance works on Castle Road, Epsom.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 22:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 10:07.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Brokes Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Brokes Road, Reigate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2025 at 11:45 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 11:37.

Southern Gas Networks logo
LONG TERM
Between
14 Sep and 4 Dec 2025
Details
View Map
Share
Fir Tree Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fir Tree Road, Banstead.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2025 and run through until 4 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 14:50.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Reigate Hill

Surrey County Council are carrying out Highway repair and maintenance works on Reigate Hill, Reigate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 20:30 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2025 at 07:48.

UK Power Networks South Eastern logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croydon Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Jun 2025 at 15:43.

UK Power Networks South Eastern logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croydon Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jul 2025 at 08:31.

UK Power Networks South Eastern logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks South Eastern are carrying out New service connection on Croydon Road, Caterham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 09:03.

Surrey County Council logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Woodcote Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodcote Green Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Aug 2025 at 16:25.

Surrey County Council logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Woodcote Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodcote Green Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 14:01.

Surrey County Council logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Woodcote Green Road

Surrey County Council are carrying out Highway repair and maintenance works on Woodcote Green Road, Epsom.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 20:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2025 at 07:47.

Surrey County Council logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Woodcote Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodcote Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Aug 2025 at 16:25.

Surrey County Council logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Woodcote Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodcote Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 14:44.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Woodcote Road

Surrey County Council are carrying out Highway repair and maintenance works on Woodcote Road, Epsom.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 20:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Sep 2025 at 14:28.

Southern Gas Networks logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Chiltern Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 11:30.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 12:29.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 13:32.

Southern Gas Networks logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Woodcote Green

Southern Gas Networks are carrying out Utility repair and maintenance works on Woodcote Green, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 11:21.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Upper Selsdon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Selsdon Road, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 19:00 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 10:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Oaks Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Fir Tree Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Grove, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 17:03.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 07:45.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Cedar Road, Sutton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2025 at 07:08.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Chipstead Valley Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2025 and run through until 20 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Jul 2025 at 07:30.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
South Street

Thames Water are carrying out Utility repair and maintenance works on South Street, Epsom.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 10:04 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 10:48.

Transport for London (TfL) logo
Monday
Details
View Map
Share
Purley Way

Transport for London (TfL) carried out Highway repair and maintenance works on Purley Way, Croydon.

A lane was closed for some or all of the period.

The works were originally planned between 18 Sep 2025 and 22 Sep 2025 and were actually completed on 18 Sep 2025 between 20:32 and 20:41. The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 20:49.

Surrey County Council logo
Between
19 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Long Walk

Surrey County Council are proposing to carry out Section 50 on Long Walk, Epsom Downs.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2025 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
21 Sep and 1 Dec 2025
Details
View Map
Share
Follow
Burdon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burdon Lane, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:35.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Chaldon Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Common Road, Chaldon, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 08:19.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 14 Nov 2025
Details
View Map
Share
Follow
St Monicas Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Monicas Road, Kingswood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 08:33.

London Borough Of Croydon logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sanderstead Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 May 2025 at 12:23.

London Borough Of Croydon logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sanderstead Hill

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sanderstead Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 11 Jun 2025 at 14:18.

London Borough Of Croydon logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sundown Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 2 May 2025 at 12:25.

London Borough Of Croydon logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sundown Avenue

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Sundown Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 11 Jun 2025 at 13:51.

London Borough Of Croydon logo
Finishing
Wednesday
Details
View Map
Share
Follow
Purley Oaks Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Purley Oaks Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 8 May 2025 at 10:31.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Farm Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Lane, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 12:07.

Southern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 12:19.

Southern Gas Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:27.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 12:05.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Warren Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 07:04.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 30 Nov 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:59.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
The Warren

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Warren, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:56.

Southern Gas Networks logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
The Newlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Newlands, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 15:47.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Glebe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 09:41.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 15 Dec 2025
Details
View Map
Share
Follow
Sandy Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Jun 2025 at 07:16.

UK Power Networks South Eastern logo
Between
23 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Crescent Road

UK Power Networks South Eastern are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jul 2025 at 08:31.

Thames Water logo
LONG TERM
Between
23 Sep 2025 and 12 Jan 2026
Details
View Map
Share
Follow
Alton Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Alton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 12 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:54.

London Borough Of Croydon logo
Between
25 Sep and 1 Oct 2025
Details
View Map
Share
Monahan Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Monahan Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:31.

London Borough Of Croydon logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Purley Knoll

London Borough Of Croydon were proposing to carry out Highway improvement works on Purley Knoll, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:31.

London Borough Of Croydon logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Byron Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Byron Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:32.

Surrey County Council logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Bolters Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bolters Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jul 2025 at 14:32.

Surrey County Council logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jul 2025 at 14:29.

Surrey County Council logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Sutton Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Sutton Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Jul 2025 at 14:33.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Castle Road

Thames Water were proposing to carry out Utility repair and maintenance works on Castle Road, Epsom.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 09:20.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Furzedown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Furzedown Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 10:33.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:10.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Chiltern Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chiltern Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:57.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:58.

Southern Gas Networks logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Avenue Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:39.

Southern Gas Networks logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Arundel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:22.

Southern Gas Networks logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Arundel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Arundel Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 07:24.

Thames Water logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Lysander Road

Thames Water are proposing to carry out New service connection on Lysander Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:38.

Thames Water logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Lysander Road

Thames Water are proposing to carry out New service connection on Lysander Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 08:16.

London Borough Of Sutton logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 1 Jul 2025 at 11:55.

London Borough Of Sutton logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Langley Park Road

London Borough Of Sutton were proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 8 Sep 2025 at 10:53.

London Borough Of Sutton logo
Between
29 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 11 Sep 2025 at 15:12.

London Borough Of Croydon logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Hartley Hill

London Borough Of Croydon were proposing to carry out Highway improvement works on Hartley Hill, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 4 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:32.

London Borough Of Croydon logo
Between
1 and 6 Oct 2025
Details
View Map
Share
Beckett Avenue

London Borough Of Croydon were proposing to carry out Highway improvement works on Beckett Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:33.

UK Power Networks South Eastern logo
Between
2 and 22 Oct 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jul 2025 at 09:00.

UK Power Networks South Eastern logo
Between
2 and 22 Oct 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jul 2025 at 08:26.

London Borough Of Croydon logo
Between
3 and 8 Oct 2025
Details
View Map
Share
Rydons Lane

London Borough Of Croydon were proposing to carry out Highway improvement works on Rydons Lane, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 14 Aug 2025 at 09:34.

Southern Gas Networks logo
LONG TERM
Between
3 Oct 2025 and 16 Mar 2026
Details
View Map
Share
Follow
Russell Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Russell Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 16 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Josephine Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Josephine Avenue, Lower Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Jul 2025 at 12:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Josephine Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Josephine Avenue, Lower Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 8 Aug 2025 at 08:17.

Southern Gas Networks logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 10:08.

Southern Gas Networks logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 10:09.

Southern Gas Networks logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Banstead Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Banstead Road, Caterham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 14:20.

Thames Water logo
Between
6 and 14 Oct 2025
Details
View Map
Share
Follow
College Road

Thames Water are proposing to carry out Utility repair and maintenance works on College Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Jun 2025 at 07:54.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Limpsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limpsfield Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:38.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Limpsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limpsfield Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Village Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 08:45.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Village Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Village Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 17:01.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Penwortham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 10:11.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 13:01.

Southern Gas Networks logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 12:03.

Southern Gas Networks logo
Between
6 and 26 Oct 2025
Details
View Map
Share
Follow
Lavender Vale

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lavender Vale, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 13:19.

London Borough Of Sutton logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 10 Sep 2025 at 14:45.

London Borough Of Sutton logo
Between
6 and 13 Oct 2025
Details
View Map
Share
Follow
Langley Park Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Langley Park Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 11 Sep 2025 at 15:12.

Southern Gas Networks logo
Between
7 and 21 Oct 2025
Details
View Map
Share
Follow
Furzedown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Furzedown Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:56.

Southern Gas Networks logo
Between
7 and 21 Oct 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:57.

London Borough Of Croydon logo
Between
8 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Caterham Drive

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Caterham Drive, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 4 November 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Croydon on 18 Aug 2025 at 14:22.

BT logo
Between
9 and 13 Oct 2025
Details
View Map
Share
Abbey Road

BT were proposing to carry out Utility asset works on Abbey Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 October 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2025 at 09:35.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Purley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 16:26.

Transport for London (TfL) logo
Between
12 and 22 Oct 2025
Details
View Map
Share
Follow
Purley Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Purley Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 15:19.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Ruden Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruden Way, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 12:55.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 5 Dec 2025
Details
View Map
Share
Ruden Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ruden Way, Epsom Downs.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 5 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 15:11.

Southern Gas Networks logo
LONG TERM
Between
13 Oct 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Ruden Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruden Way, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2025 at 12:44.

Southern Gas Networks logo
Between
13 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:10.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Fairlawn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Road, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 14:08.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 22 Dec 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 12:38.

UK Power Networks South Eastern logo
Between
13 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Croham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croham Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 21:11.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Laburnum Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Laburnum Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 14:57.

Surrey County Council logo
LONG TERM
Between
14 Oct 2025 and 14 Mar 2026
Details
View Map
Share
Follow
School Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on School Hill, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 14 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2025 at 13:44.

Surrey County Council logo
LONG TERM
Between
17 Oct 2025 and 17 Mar 2026
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 17 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2025 at 14:49.

Surrey County Council logo
LONG TERM
Between
17 Oct 2025 and 17 Mar 2026
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on West Street, Ewell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 17 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2025 at 07:37.

Southern Gas Networks logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Southway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southway, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:21.

Southern Gas Networks logo
Between
20 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 14:24.

Southern Gas Networks logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Pine Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:24.

Southern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:19.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Ingleton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 16:20.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 16:19.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 16:05.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 12:19.

Surrey County Council logo
Between
21 and 25 Oct 2025
Details
View Map
Share
Follow
Caterham By-pass

Surrey County Council are proposing to carry out Works for road purposes on Caterham By-pass, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 25 October 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2025 at 13:29.

Southern Gas Networks logo
Between
21 and 25 Oct 2025
Details
View Map
Share
Follow
Star Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Star Lane, Hooley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 13:26.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Oct and 20 Nov 2025
Details
View Map
Share
Follow
Duppas Road

UK Power Networks South Eastern are proposing to carry out New service connection on Duppas Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Aug 2025 at 09:05.

Surrey County Council logo
Between
22 and 25 Oct 2025
Details
View Map
Share
Follow
Caterham By-pass

Surrey County Council are proposing to carry out Works for road purposes on Caterham By-pass, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2025 at 07:07.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:42.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Onslow Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Onslow Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:26.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 13:08.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Blenheim Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Gardens, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:23.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Milton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:36.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Milton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Milton Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Stafford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 12:33.

Southern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Stafford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stafford Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 12:20.

Surrey County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Ormside Way

Surrey County Council were proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2025 at 13:51.

Surrey County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Frenches Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2025 at 13:51.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Chequers Lane

BT are proposing to carry out Utility asset works on Chequers Lane, Walton On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Aug 2025 at 11:10.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Chequers Lane

BT are proposing to carry out Utility asset works on Chequers Lane, Walton On The Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Sep 2025 at 15:32.

Surrey County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Dean Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dean Lane, Merstham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 13:44.

Surrey County Council logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Dean Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Dean Lane, Merstham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 1 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 26 Aug 2025 at 12:33.

Surrey County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Dean Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Dean Lane, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 1 Sep 2025 at 13:40.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Westway

BT are proposing to carry out Remedial works on Westway, Surrey, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Jun 2025 at 07:04.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Westway

BT are proposing to carry out Remedial works on Westway, Surrey, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 1 Jul 2025 at 08:39.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Westway

BT are proposing to carry out Remedial works on Westway, Surrey, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Jul 2025 at 08:47.

Surrey County Council logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Caterham By-pass

Surrey County Council are proposing to carry out Works for road purposes on Caterham By-pass, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2025 at 13:31.

Surrey County Council logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Caterham By-pass

Surrey County Council are proposing to carry out Works for road purposes on Caterham By-pass, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 17 Sep 2025 at 07:05.

Southern Gas Networks logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Doghurst Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Doghurst Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 14:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Court Farm Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Court Farm Road, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2025 at 13:16.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Court Farm Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Court Farm Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Aug 2025 at 09:18.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Southern Gas Networks are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 11:08.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Southern Gas Networks are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:48.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Southern Gas Networks are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 16:38.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Chipstead Valley Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2025 at 09:32.

Thames Water logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
College Road

Thames Water are proposing to carry out Utility repair and maintenance works on College Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:06.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Farm Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Lane, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:14.

Southern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Purley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 14:50.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Heathhurst Road

Southern Gas Networks are proposing to carry out New service connection on Heathhurst Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 11:53.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Heathhurst Road

Southern Gas Networks are proposing to carry out New service connection on Heathhurst Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:59.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out New service connection on Brambledown Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:06.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out New service connection on Brambledown Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 13:07.

Southern Gas Networks logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 16:31.

Southern Gas Networks logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Aberdeen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aberdeen Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 07:06.

UK Power Networks South Eastern logo
Between
30 Oct and 19 Nov 2025
Details
View Map
Share
Follow
Croydon Road

UK Power Networks South Eastern are proposing to carry out New service connection on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Jul 2025 at 07:51.

Southern Gas Networks logo
LONG TERM
Between
30 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Ruden Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ruden Way, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 19 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 15:14.

Surrey County Council logo
Between
3 and 8 Nov 2025
Details
View Map
Share
Follow
Mogador Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mogador Road, Lower Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Sep 2025 at 14:29.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Sandy Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandy Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 15:12.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 08:28.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 07:54.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 07:56.

Southern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 08:31.

Southern Gas Networks logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Star Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Star Lane, Hooley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:57.

UK Power Networks South Eastern logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Stagbury Avenue

UK Power Networks South Eastern were proposing to carry out Utility asset works on Stagbury Avenue, Chipstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Aug 2025 at 14:48.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Outwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Outwood Lane, Chipstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Haydn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haydn Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:31.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cliff End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff End, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:28.

Southern Gas Networks logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Cliff End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff End, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:12.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 29 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 13:28.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Alberta Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:24.

Southern Gas Networks logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 14:32.

Southern Gas Networks logo
Between
3 and 20 Nov 2025
Details
View Map
Share
Follow
Southbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 08:57.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Lower Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Lower Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Jul 2025 at 08:22.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Tillingdown Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tillingdown Lane, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 14 Aug 2025 at 14:23.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Tillingdown Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tillingdown Lane, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Aug 2025 at 11:14.

Surrey County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Langley Vale Road

Surrey County Council are proposing to carry out Highway improvement works on Langley Vale Road, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2025 at 10:39.

Surrey County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Langley Vale Road

Surrey County Council are proposing to carry out Highway improvement works on Langley Vale Road, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 24 Feb 2025 at 09:36.

Surrey County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Langley Vale Road

Surrey County Council are proposing to carry out Highway improvement works on Langley Vale Road, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 15:13.

Surrey County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Ashley Road

Surrey County Council are proposing to carry out Highway improvement works on Ashley Road, Epsom.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2025 at 10:35.

Surrey County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Ashley Road

Surrey County Council are proposing to carry out Highway improvement works on Ashley Road, Epsom.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 24 Feb 2025 at 09:36.

Surrey County Council logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Ashley Road

Surrey County Council are proposing to carry out Highway improvement works on Ashley Road, Epsom.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Mar 2025 at 15:14.

Surrey County Council logo
Between
5 and 14 Nov 2025
Details
View Map
Share
Follow
West Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on West Street, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Sep 2025 at 08:53.

Surrey County Council logo
Between
6 and 12 Nov 2025
Details
View Map
Share
Follow
Gatton Bottom

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Aug 2025 at 16:03.

Surrey County Council logo
Between
6 and 8 Nov 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 14:57.

Surrey County Council logo
Between
6 and 8 Nov 2025
Details
View Map
Share
Follow
Chipstead Valley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chipstead Valley Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Sep 2025 at 15:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Birch Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Aug 2025 at 09:16.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Birch Avenue

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 20 Aug 2025 at 07:10.

UK Power Networks South Eastern logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Goodenough Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Goodenough Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 08:10.

Southern Gas Networks logo
LONG TERM
Between
10 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Russell Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Russell Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 09:42.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 13:16.

Network Rail logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Shorts Road

Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jul 2025 at 14:01.

Network Rail logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Shorts Road

Network Rail are proposing to carry out Works for Rail Purposes on Shorts Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Aug 2025 at 12:09.

Surrey County Council logo
Between
12 and 18 Nov 2025
Details
View Map
Share
School Hill

Surrey County Council were proposing to carry out Highway repair and maintenance works on School Hill, Merstham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 18 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 8 Sep 2025 at 07:33.

Surrey County Council logo
Between
12 and 18 Nov 2025
Details
View Map
Share
Follow
School Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on School Hill, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Sep 2025 at 15:36.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Selcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selcroft Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:17.

Southern Gas Networks logo
LONG TERM
Between
14 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Selcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selcroft Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:16.

UK Power Networks South Eastern logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Waterhouse Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Waterhouse Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 13:04.

Southern Gas Networks logo
LONG TERM
Between
17 Nov 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Walpole Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walpole Avenue, Chipstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 23 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Aug 2025 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
17 Nov 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Fir Tree Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Road, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 14:28.

UK Power Networks South Eastern logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Kings Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Kings Road, Belmont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 20:53.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 15:11.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Edgar Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Edgar Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:46.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Norman Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Avenue, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 15:23.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Glebe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 14:15.

UK Power Networks South Eastern logo
Between
18 and 21 Nov 2025
Details
View Map
Share
Follow
Stagbury Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Stagbury Avenue, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2025 at 08:24.

BT logo
Between
19 and 21 Nov 2025
Details
View Map
Share
The Avenue

BT were proposing to carry out Utility asset works on The Avenue, Tadworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Sep 2025 at 13:55.

UK Power Networks South Eastern logo
Between
19 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Violet Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Violet Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Aug 2025 at 20:50.

Transport for London (TfL) logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
Edridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:17.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
Innes Yard

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Innes Yard, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:17.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
Whitgift Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Whitgift Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 16:17.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
Innes Yard

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Innes Yard, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 14:16.

Transport for London (TfL) logo
Between
20 and 22 Nov 2025
Details
View Map
Share
Fell Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Fell Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:40.

Transport for London (TfL) logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
Fell Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fell Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:39.

Transport for London (TfL) logo
Between
20 and 29 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 29 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 16:01.

Transport for London (TfL) logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 15:44.

Southern Gas Networks logo
LONG TERM
Between
24 Nov 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Fir Tree Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fir Tree Road, Epsom Downs.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 10:05.

Southern Gas Networks logo
Between
24 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Wontford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wontford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:59.

Southern Gas Networks logo
Between
24 Nov and 21 Dec 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 16:30.

Thames Water logo
LONG TERM
Between
25 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Waddon Close

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Close, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:58.

Southern Gas Networks logo
Between
28 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Purley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
28 Nov and 23 Dec 2025
Details
View Map
Share
Follow
Purley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Purley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 23 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 11:09.

Thames Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Goodwin Road

Thames Water were proposing to carry out Utility asset works on Goodwin Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:40.

Southern Gas Networks logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitefield Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 11:40.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Waterer Gardens

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Waterer Gardens, Burgh Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 9 Sep 2025 at 10:59.

Southern Gas Networks logo
Between
15 and 24 Dec 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:54.

Southern Gas Networks logo
Between
15 and 24 Dec 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:21.


Roadworks Map near to Outwood Lane, COULSDON, CR5 3LU (20 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Outwood Lane, COULSDON, CR5 3LU (20 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
OUTWOOD LANE 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 18 Aug 2025 - 29 Sep 2025
0.2
Details
Share
Follow
2
Southern Gas Networks logo
MAJOR
  
HOW LANE 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 1 Sep 2025 08:00
(Scheduled: 1 Sep 2025 - 20 Oct 2025)
0.4
Details
Share
Follow
3
Surrey County Council logo
MAJOR
  
CHIPSTEAD VALLEY ROAD 
(0.4 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 1 Apr 2025 - 1 Oct 2025)
0.4
Details
Share
4
Thames Water logo
OUTWOOD LANE 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 15 Sep 2025 09:30
(Scheduled: 15 Sep 2025 - 20 Sep 2025)
0.4
Details
Share
Follow
5
Surrey County Council logo
MAJOR
  
CHIPSTEAD VALLEY ROAD 
(0.5 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 18 Sep 2025 - 20 Sep 2025)
0.5
Details
Share
6
Surrey County Council logo
MAJOR
  
CHIPSTEAD VALLEY ROAD 
(0.5 miles)
Surrey County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 1 Apr 2025 - 1 Oct 2025
0.5
Details
Share
Follow
7
Southern Gas Networks logo
MAJOR
  
LISSOMS ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 28 Apr 2025 - 1 Oct 2025
0.5
Details
Share
Follow
8
Southern Gas Networks logo
MAJOR
  
LISSOMS ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 28 Apr 2025 - 1 Oct 2025
0.5
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
LISSOMS ROAD 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 7 May 2025 08:00
(Scheduled: 1 May 2025 - 6 Oct 2025)
0.5
Details
Share
Follow
10
Southern Gas Networks logo
MAJOR
  
BOUVERIE ROAD 
(0.6 miles)
Southern Gas Networks
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 28 Apr 2025 - 1 Oct 2025)
0.6
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.