ROADWORKS SUMMARY
Great Horkesley, COLCHESTER, CO6 4AY
Introduction
View current and future planned roadworks and road closures for CO6 4AY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Great Horkesley, COLCHESTER, CO6 4AY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Dec 2024
Essex County Council are carrying out Highway improvement works on Wick Road, Boxted.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 June 2023 at 08:33 and could run through until 28 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Jun 2023 at 11:26.
20 Jul 2025
Anglian Water are carrying out Utility asset works on Hadleigh Road, Raydon.
These works are categorised as Major.
The works started on 20 January 2024 at 11:00 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 20 Jan 2024 at 11:12.
18 Jul 2025
Anglian Water are carrying out Utility asset works on Higham Road, Raydon.
These works are categorised as Major.
The works started on 2 February 2024 at 17:00 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 2 Feb 2024 at 17:25.
14 Aug 2025
Anglian Water are carrying out Utility asset works on Woodlands Road, Raydon.
These works are categorised as Major.
The works started on 8 March 2024 at 07:00 and could run through until 14 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 8 Mar 2024 at 07:44.
17 Sep 2025
Anglian Water are carrying out Utility asset works on Low Lift Cottage Road, Langham.
These works are categorised as Major.
The works started on 20 March 2024 at 11:00 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 20 Mar 2024 at 11:12.
14 Sep 2025
Anglian Water are carrying out Utility asset works on Thorington Street, Stoke By Nayland.
These works are categorised as Major.
The works started on 2 April 2024 at 16:00 and could run through until 14 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 2 Apr 2024 at 15:20.
16 Nov 2025
Anglian Water are carrying out Utility asset works on Marsh Road, Stoke By Nayland.
These works are categorised as Major.
The works started on 17 May 2024 at 13:50 and could run through until 16 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 17 May 2024 at 13:50.
2 Nov 2025
Anglian Water are carrying out Utility asset works on Water Lane, Langham.
These works are categorised as Major.
The works started on 20 May 2024 at 08:30 and could run through until 2 November 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 20 May 2024 at 07:42.
23 Nov 2025
Anglian Water are carrying out Utility asset works on Tog Lane, Great Horkesley.
These works are categorised as Major.
The works started on 24 May 2024 at 08:35 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 24 May 2024 at 08:35.
2 Dec 2025
Anglian Water are carrying out Utility asset works on Church Road, Boxted.
These works are categorised as Major.
The works started on 24 June 2024 at 12:30 and could run through until 2 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 24 Jun 2024 at 12:24.
2 Dec 2025
Anglian Water are carrying out Utility asset works on Wet Lane, Boxted.
These works are categorised as Major.
The works started on 24 June 2024 at 12:30 and could run through until 2 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 24 Jun 2024 at 12:24.
Tuesday
UK Power Networks Eastern & London are carrying out Utility asset works on Old Ipswich Road, Ardleigh.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 26 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 08:03.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Rectory Hill, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 13:46.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:42.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Mill Lane, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 13:41.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 13:43.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:22.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Martens Lane, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 12:53.
14 Oct and 6 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Water Lane, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 14:31.
21 Oct and 1 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 1 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 15:02.
21 Oct and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 15:42.
21 Oct and 29 Nov 2024
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 29 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:13.
4 Nov and 1 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 1 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 14:39.
11 Nov and 10 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Wildeve Avenue, Colchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 10 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:22.
14 and 28 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Wildeve Avenue, Colchester.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 28 November 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 14:23.
28 Nov 2024
Essex County Council are carrying out Highway improvement works on Wildeve Avenue, Colchester.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 16:32 and could run through until 28 November 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 16:45.
Anglian Water carried out Utility repair and maintenance works on Wickerstreet Green, Kersey.
The road was closed for some or all of the period.
The works were originally planned between 14 Nov 2024 and 21 Nov 2024 and were actually completed between 14 Nov 2024 (10:30) and 21 Nov 2024 (12:00). The works impacted the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 12:13.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:28.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 11:29.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:34.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:33.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:35.
18 Nov and 13 Dec 2024
Suffolk County Council are proposing to carry out Highway repair and maintenance works on Mill Green, Edwardstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 27 Sep 2024 at 15:56.
13 Dec 2024
Suffolk County Council are carrying out Highway repair and maintenance works on Mill Green, Edwardstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:30 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 12:57.
Monday
Anglian Water are carrying out Utility repair and maintenance works on Lower Raydon, Raydon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 14:00 and could run through until 25 November 2024. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 09:00.
25 and 29 Nov 2024
Anglian Water are proposing to carry out Utility asset works on Water Lane, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Sep 2024 at 10:56.
25 and 29 Nov 2024
Anglian Water are proposing to carry out Utility asset works on Water Lane, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 1 Oct 2024 at 09:18.
25 and 29 Nov 2024
Anglian Water were proposing to carry out Utility asset works on Water Lane, Langham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 11:19.
25 and 29 Nov 2024
Anglian Water are proposing to carry out Utility asset works on Water Lane, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 11:48.
25 and 29 Nov 2024
Anglian Water are proposing to carry out Utility asset works on Water Lane, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Nov 2024 at 10:15.
25 and 29 Nov 2024
Anglian Water are proposing to carry out Utility asset works on Water Lane, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 09:08.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Skye Hall Hill, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Sep 2024 at 11:03.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Skye Hall Hill, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 Sep 2024 at 10:41.
2 and 6 Dec 2024
Anglian Water were proposing to carry out Utility asset works on Skye Hall Hill, Boxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 12:14.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Skye Hall Hill, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 11:50.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Skye Hall Hill, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 09:18.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Skye Hall Hill, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 08:14.
2 and 6 Dec 2024
Anglian Water were proposing to carry out Utility asset works on Higham Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Oct 2024 at 10:13.
2 and 13 Dec 2024
Anglian Water were proposing to carry out Utility asset works on Higham Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 11:17.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Higham Road, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 09:18.
2 and 6 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Higham Road, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 16:45.
2 and 6 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Brick Kiln Hill, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 13 Sep 2024 at 14:18.
2 and 4 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Stone Street, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Oct 2024 at 12:22.
2 and 4 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Stone Street, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 10:30.
2 and 13 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Layham Road, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 7 Nov 2024 at 15:28.
2 and 13 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Layham Road, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 12 Nov 2024 at 13:10.
2 and 13 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Duke Street, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 7 Nov 2024 at 16:03.
2 and 13 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Duke Street, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 12 Nov 2024 at 13:10.
3 and 10 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 12:39.
4 and 6 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Dedham Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 16 Sep 2024 at 14:01.
9 and 13 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Higham Road, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 11:02.
9 and 13 Dec 2024
Anglian Water are proposing to carry out Utility asset works on Higham Road, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 11:20.
9 and 13 Dec 2024
Anglian Water were proposing to carry out Utility asset works on Higham Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Oct 2024 at 10:12.
10 and 12 Dec 2024
Anglian Water were proposing to carry out Utility repair and maintenance works on Stone Street, Boxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 14:49.
11 and 13 Dec 2024
Suffolk County Council were proposing to carry out Highway improvement works on Mill Green, Edwardstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Oct 2024 at 16:17.
11 and 13 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Mill Green, Edwardstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 15 Oct 2024 at 15:13.
13 and 16 Dec 2024
Anglian Water were proposing to carry out Utility asset works on Hadleigh Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Oct 2024 at 10:06.
13 and 16 Dec 2024
Anglian Water were proposing to carry out Section 58 on Hadleigh Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 12:19.
16 and 23 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Vinesse Road, Little Horkesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Sep 2024 at 10:11.
16 and 23 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Vinesse Road, Little Horkesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Sep 2024 at 15:06.
16 and 18 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Grove Hill, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 23 Sep 2024 at 13:04.
16 and 18 Dec 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Grove Hill, Langham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Sep 2024 at 09:45.
16 and 20 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Brick Kiln Hill, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Sep 2024 at 15:41.
16 and 20 Dec 2024
Suffolk County Council were proposing to carry out Highway improvement works on Brick Kiln Hill, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 7 Oct 2024 at 13:19.
16 and 20 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Brick Kiln Hill, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Oct 2024 at 09:29.
16 and 20 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Brick Kiln Hill, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Sep 2024 at 15:42.
16 and 20 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Brick Kiln Hill, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 9 Oct 2024 at 11:50.
16 and 20 Dec 2024
Suffolk County Council were proposing to carry out Highway improvement works on Brick Kiln Hill, Boxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 25 Sep 2024 at 15:25.
16 and 20 Dec 2024
Suffolk County Council are proposing to carry out Highway improvement works on Brick Kiln Hill, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 25 Sep 2024 at 14:52.
6 and 8 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Horkesley Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Sep 2024 at 10:14.
6 and 8 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Horkesley Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Sep 2024 at 15:05.
6 and 10 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Church Road, Boxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 12:15.
6 and 10 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Church Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 11:52.
6 and 10 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Church Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 10:47.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Wiston Road, Nayland With Wissington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 27 Sep 2024 at 11:34.
6 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 08:59.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Lower Raydon, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:26.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Lower Raydon, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:11.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Road From C727 To C473, Shelley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:27.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Road From C727 To C473, Shelley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:11.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Layham Road, Shelley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:27.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Layham Road, Shelley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:12.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Shelley Road, Layham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 14 Nov 2024 at 12:27.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Shelley Road, Layham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 19 Nov 2024 at 12:11.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jul 2024 at 11:49.
13 and 17 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Wet Lane, Boxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 12:15.
13 and 17 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Wet Lane, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 11:56.
13 and 17 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Wet Lane, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 10:48.
13 Jan and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 14:00.
17 and 24 Jan 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Sep 2024 at 11:32.
17 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 12:50.
17 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 13:13.
17 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 15:09.
17 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Benton Street, Hadleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 12:07.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:53.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 08:15.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:56.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:46.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 12:02.
20 Jan 2025 and 19 Jul 2027
Essex County Council are proposing to carry out Highway improvement works on Wick Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 19 July 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 13:54.
20 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 09:04.
20 and 24 Jan 2025
Anglian Water were proposing to carry out Utility asset works on Woodlands Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 11:19.
20 and 24 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Woodlands Road, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 19:21.
3 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Brook Street, Dedham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:33.
7 and 10 Feb 2025
Anglian Water were proposing to carry out Section 58 on Hadleigh Road, Raydon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Nov 2024 at 09:09.
7 and 10 Feb 2025
Anglian Water are proposing to carry out Section 58 on Hadleigh Road, Raydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 10:38.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Bear Street, Nayland With Wissington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 22 Oct 2024 at 11:55.
Roadworks Map near to Great Horkesley, COLCHESTER, CO6 4AY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Great Horkesley, COLCHESTER, CO6 4AY (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Nov 2024 - 22 Nov 2024)