ROADWORKS SUMMARY
Bures Road, COLCHESTER, CO6 2BB
Introduction
View current and future planned roadworks and road closures for Bures Road, CO6 2BB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bures Road, COLCHESTER, CO6 2BB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bures Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
23 Nov 2025
Anglian Water are carrying out Utility asset works on Tog Lane, Great Horkesley.
These works are categorised as Major.
The works started on 24 May 2024 at 08:35 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 24 May 2024 at 08:35.
27 Oct and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on London Road, Copford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Oct 2024 at 09:31.
Today
Cadent Gas are proposing to carry out Utility asset works on Coggeshall Way, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 15:29.
Today
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 15:28.
4 Nov and 13 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on London Road, Copford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 16:38.
4 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:18.
4 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:13.
7 Nov 2024 and 20 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Copford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 10:28.
20 Jan 2025
Essex County Council are carrying out Highway improvement works on Hall Road, Copford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 17:03 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 17:14.
11 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:20.
29 Nov 2024
Cadent Gas are carrying out Utility asset works on High Street, Earls Colne.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:08 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:13.
11 Nov and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 24 Sep 2024 at 14:27.
11 Nov and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 08:06.
11 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Coggeshall Way, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:35.
11 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:30.
12 Nov and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on London Road, Copford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 11:29.
20 Dec 2024
Essex County Council are carrying out Highway improvement works on London Road, Copford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 16:10 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 16:17.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:27.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 11:28.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:28.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 11:29.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:34.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:33.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:35.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:30.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 11:31.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:30.
18 Nov and 9 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:44.
18 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:12.
22 Nov and 3 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Station Road, Wakes Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 15:13.
22 Nov and 3 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Bures Road, Wakes Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 15:16.
22 Nov and 3 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Chappel Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 15:17.
22 Nov and 3 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 15:18.
22 Nov and 3 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Bures Hamlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 15:12.
25 Nov and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Copford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:56.
25 Nov 2024 and 20 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Copford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Oct 2024 at 11:05.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:44.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:50.
Wednesday
Anglian Water are proposing to carry out Utility repair and maintenance works on Cross End, Pebmarsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 12:13.
Wednesday
Anglian Water are proposing to carry out Utility repair and maintenance works on Cross End, Pebmarsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Oct 2024 at 12:54.
26 Nov and 2 Dec 2024
G2 Energy IDNO are proposing to carry out New service connection on Plummers Road, Fordham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 3 Sep 2024 at 12:56.
26 Nov and 2 Dec 2024
G2 Energy IDNO are proposing to carry out New service connection on Plummers Road, Fordham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 27 Sep 2024 at 10:46.
Thursday
Anglian Water are proposing to carry out Utility repair and maintenance works on Church Road, Twinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 5 Sep 2024 at 09:10.
Thursday
Anglian Water are proposing to carry out Utility repair and maintenance works on Church Road, Twinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 09:43.
27 Nov and 3 Dec 2024
G2 Energy IDNO are proposing to carry out New service connection on Plummers Road, Fordham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 18 Sep 2024 at 10:49.
28 Nov and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 08:39.
28 Nov and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 9 Oct 2024 at 20:11.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Tollgate Drive, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 16:14.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Tollgate Drive, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 16:29.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Tollgate Drive, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 16:50.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Tollgate Drive, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Sep 2024 at 08:41.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Marram Close, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Sep 2024 at 16:45.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Marram Close, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Sep 2024 at 08:58.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:38.
2 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:22.
2 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:28.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Hornes Green Road, Bures Hamlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 09:30.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Remedial works on Bures Road, Alphamstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 12:22.
2 and 6 Dec 2024
Essex County Council are proposing to carry out Remedial works on Bures Road, Alphamstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:41.
3 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Tollgate Drive, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:16.
3 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Marram Close, Stanway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:19.
3 and 10 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 12:39.
3 and 10 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 12:39.
3 and 10 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 12:39.
8 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Plummers Road, Fordham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 09:42.
8 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Plummers Road, Fordham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 14:44.
8 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Plummers Road, Fordham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:32.
11 and 13 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Bridge Street, Bures Hamlet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 09:42.
16 and 23 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Vinesse Road, Little Horkesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Sep 2024 at 10:11.
16 and 23 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Vinesse Road, Little Horkesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Sep 2024 at 15:06.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:24.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:22.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:48.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 10:29.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 09:55.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colchester Road, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:30.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colchester Road, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Newbarn Road, Great Tey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 10:33.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Station Road, Wakes Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:06.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:40.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:21.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, Wakes Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:51.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colchester Road, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:30.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Colchester Road, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:54.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fenn Road, Halstead Urban, Halstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 13:58.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Chappel Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:59.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:00.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Bures Hamlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:01.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Wiston Road, Nayland With Wissington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 27 Sep 2024 at 11:34.
8 and 10 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on The Green, Twinstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 09:00.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Foundry Lane, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 09:01.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Foundry Lane, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jul 2024 at 11:49.
13 and 15 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Dowling Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 10:11.
13 and 15 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Dowling Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 10 Oct 2024 at 15:33.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:50.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 08:17.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:53.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Bures Road, West Bergholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 08:15.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:52.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:56.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 11:46.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 12:02.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:41.
27 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Coggeshall Way, Halstead Urban, Halstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:21.
27 Jan and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Colne Road, Halstead Urban, Halstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 13:33.
3 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Lamarsh Road, Alphamstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 14:56.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Lane, Earls Colne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 10:36.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Lane, Earls Colne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:22.
11 and 13 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Green, Twinstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 10:54.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Flories Road, Great Tey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 09:20.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:21.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:09.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:21.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:31.
Roadworks Map near to Bures Road, COLCHESTER, CO6 2BB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bures Road, COLCHESTER, CO6 2BB (2 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.