ROADWORKS SUMMARY
Walnut Tree Way, COLCHESTER, CO5 0NG
Introduction
View current and future planned roadworks and road closures for Walnut Tree Way, CO5 0NG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Walnut Tree Way, COLCHESTER, CO5 0NG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Walnut Tree Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
Tomorrow
Essex County Council are carrying out Highway improvement works on Hall Road, Copford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 17:03 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 13:32.
Tomorrow
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eastways, Witham Town, Witham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Dec 2024 at 08:52.
Monday
UK Power Networks Eastern & London are carrying out Utility asset works on Eastways, Witham Town, Witham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 11:47 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jan 2025 at 11:48.
20 Jan and 24 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Coggeshall Road, Kelvedon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 13:54.
Tomorrow
GTC Pipelines were proposing to carry out New service connection on Barnhall Road, Tolleshunt Knights.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 15 Nov 2024 at 09:24.
Monday
Anglian Water are carrying out Utility repair and maintenance works on Vine Road, Tiptree.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 10:15 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Jan 2025 at 10:37.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Church Hill, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Dec 2024 at 12:56.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Church Hill, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Dec 2024 at 16:09.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Church Street, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 09:42.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Hollow Road, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Dec 2024 at 16:09.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Hollow Road, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Dec 2024 at 10:00.
3 and 7 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Maldon Road, Layer Marney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 10:31.
3 and 24 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:22.
3 Feb and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Kelvedon Road, Tiptree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 14:47.
3 Feb and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Kelvedon Road, Tiptree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 14:27.
3 Feb and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Kelvedon Road, Tiptree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 22 Jan 2025 at 14:48.
3 Feb and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Kelvedon Road, Tiptree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 15:09.
3 and 24 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:27.
3 Feb and 4 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:37.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Guithavon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 08:45.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Guithavon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:09.
4 and 6 Feb 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Totham Hill Green, Great Totham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 8 Nov 2024 at 13:40.
4 and 6 Feb 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Totham Hill Green, Great Totham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 18 Nov 2024 at 15:18.
10 Feb and 2 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 2 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:43.
10 and 12 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Oak Road, Rivenhall End, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:09.
17 and 21 Feb 2025
GTC Pipelines are proposing to carry out New service connection on Barnhall Road, Tolleshunt Knights.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 19 Nov 2024 at 08:32.
17 and 23 Feb 2025
Gigaclear are proposing to carry out Remedial works on Coggeshall Road, Feering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 24 Dec 2024 at 10:25.
17 and 23 Feb 2025
Gigaclear were proposing to carry out Remedial works on Coggeshall Road, Feering.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 14 Jan 2025 at 12:04.
17 and 23 Feb 2025
Gigaclear were proposing to carry out Remedial works on Coggeshall Road, Feering.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 31 Dec 2024 at 11:34.
18 and 20 Feb 2025
Anglian Water are proposing to carry out Remedial works on Queen Street, Coggeshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 10:39.
22 Feb and 2 Mar 2025
Gigaclear are proposing to carry out Remedial works on Ashbury Drive, Marks Tey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 4 Dec 2024 at 15:35.
24 and 27 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Clears Road, Layer Marney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 17 Jan 2025 at 08:30.
24 and 27 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Clears Road, Layer Marney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 5 Dec 2024 at 12:52.
24 and 26 Feb 2025
Anglian Water are proposing to carry out Remedial works on Tey Road, Coggeshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 08:56.
3 Mar and 6 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:48.
10 Mar and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Coggeshall Road, Kelvedon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 10:52.
10 Mar and 15 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:06.
10 Mar and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Coggeshall Road, Kelvedon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 14:57.
10 Mar and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Coggeshall Road, Kelvedon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Dec 2024 at 13:00.
10 and 31 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:00.
12 and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Oxley Hill, Tolleshunt D'arcy.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Dec 2024 at 14:23.
12 and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Oxley Hill, Tolleshunt D'arcy.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 17:31.
17 and 19 Mar 2025
Anglian Water are proposing to carry out Remedial works on Grove Road, Tiptree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 26 Nov 2024 at 15:57.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:44.
17 Mar and 15 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:10.
17 Mar and 15 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:44.
17 Mar and 15 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:23.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:17.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:45.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:11.
17 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 09:49.
18 and 20 Mar 2025
Anglian Water are proposing to carry out Remedial works on Colchester Road, Virley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 30 Dec 2024 at 13:06.
20 Mar and 8 Apr 2025
Gigaclear are proposing to carry out Remedial works on St Annes Close, Coggeshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 8 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 14:28.
20 Mar and 8 Apr 2025
Gigaclear are proposing to carry out Remedial works on St Annes Close, Coggeshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2025 and could run through until 8 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 29 Jan 2025 at 10:47.
24 Mar and 19 May 2025
Cadent Gas were proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 10:35.
24 Mar and 19 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:29.
24 Mar and 19 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:41.
26 Mar and 2 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Feering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 09:39.
26 Mar and 2 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Feering Hill, Feering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 13:01.
26 Mar and 2 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Feering Hill, Feering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 11:00.
26 Mar and 2 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Feering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 May 2024 at 09:15.
31 Mar and 18 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:26.
31 Mar and 18 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Guithavon Court, Witham Town, Witham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:20.
1 and 3 Apr 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Grange Road, Wickham Bishops.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2025 at 10:14.
1 and 3 Apr 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Grange Road, Wickham Bishops.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jan 2025 at 08:44.
7 and 11 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 16:11.
7 and 22 Apr 2025
GTC Pipelines were proposing to carry out Utility asset works on Kelvedon Road, Tiptree.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 22 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 20 Jan 2025 at 10:07.
7 and 22 Apr 2025
GTC Pipelines are proposing to carry out Utility asset works on Kelvedon Road, Tiptree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 20 Jan 2025 at 09:53.
7 and 11 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Maldon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 13:05.
14 Apr and 13 May 2025
Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Witham Town, Witham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.
14 and 18 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Tiptree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jan 2025 at 11:04.
14 Apr and 5 May 2025
Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.
14 Apr and 5 May 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.
16 and 18 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Newbridge Road, Layer Marney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 16:31.
16 and 18 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Tiptree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 13:58.
16 and 18 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Newbridge Road, Layer Marney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 13:22.
21 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Coggeshall Road, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 13:12.
21 Apr and 2 May 2025
Essex County Council are proposing to carry out Highway improvement works on Coggeshall Road, Kelvedon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Dec 2024 at 13:21.
21 Apr and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Valley, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 11:30.
21 Apr and 28 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:42.
21 Apr and 28 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Street, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:41.
22 and 25 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Birch Road, Copford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Jan 2025 at 13:43.
28 Apr and 20 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:43.
28 Apr and 20 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 12:00.
28 Apr and 20 May 2025
Cadent Gas are proposing to carry out Utility asset works on Guithavon Road, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:39.
28 Apr and 5 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:41.
28 Apr and 5 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 11:38.
28 Apr and 5 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Witham Town, Witham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:19.
Roadworks Map near to Walnut Tree Way, COLCHESTER, CO5 0NG (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Walnut Tree Way, COLCHESTER, CO5 0NG (2 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Jan 2025 - 3 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.