ROADWORKS SUMMARY
Wix Road, HARWICH, CO12 5LU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wix Road, CO12 5LU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wix Road, HARWICH, CO12 5LU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wix Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ramsey Road

Cadent Gas are proposing to carry out Utility asset works on Ramsey Road, Dovercourt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:29.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Ramsey Road

Cadent Gas were proposing to carry out Utility asset works on Ramsey Road, Dovercourt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 1 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 17:42.

Cadent Gas logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Ramsey Road

Cadent Gas were proposing to carry out Utility asset works on Ramsey Road, Dovercourt.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 16:21.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Ramsey Road

Cadent Gas are proposing to carry out Utility asset works on Ramsey Road, Ramsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:46.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Harwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:22.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Ramsey Road

Cadent Gas were proposing to carry out Utility asset works on Ramsey Road, Ramsey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 1 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 15:02.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Windmill Road

UK Power Networks Eastern & London are carrying out New service connection on Windmill Road, Bradfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:20 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 08:20.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Windmill Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Windmill Road, Bradfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 13:36.

Murphy Power Distribution logo
Finishing
Sunday
Details
View Map
Share
A120 From J B1035 To J B1352

Murphy Power Distribution were proposing to carry out Highway repair and maintenance works on A120 From J B1035 To J B1352, Tendring.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 22 Nov 2024 at 11:21.

Murphy Power Distribution logo
Finishing
Sunday
Details
View Map
Share
Follow
A120 From J B1035 To J B1352

Murphy Power Distribution are proposing to carry out Highway repair and maintenance works on A120 From J B1035 To J B1352, Tendring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 26 Nov 2024 at 12:16.

Murphy Power Distribution logo
Finishing
Sunday
Details
View Map
Share
Follow
A120 From J B1035 To J B1352

Murphy Power Distribution are proposing to carry out Highway repair and maintenance works on A120 From J B1035 To J B1352, Tendring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 22 Nov 2024 at 15:45.

Murphy Power Distribution logo
Finishing
Sunday
Details
View Map
Share
A120 From J B1035 To J B1352

Murphy Power Distribution were proposing to carry out Utility repair and maintenance works on A120 From J B1035 To J B1352, Tendring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:48.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Mayes Lane

Cadent Gas are proposing to carry out Utility asset works on Mayes Lane, Little Oakley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 15:00.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Mayes Lane

Cadent Gas are proposing to carry out Utility asset works on Mayes Lane, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 10:46.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Mayes Lane

Cadent Gas are proposing to carry out Utility asset works on Mayes Lane, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:12.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Mayes Lane

Cadent Gas were proposing to carry out Utility asset works on Mayes Lane, Little Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:35.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Cadent Gas are proposing to carry out Utility asset works on Lodge Road, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 16:30.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Lodge Road

Cadent Gas were proposing to carry out Utility asset works on Lodge Road, Little Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:00.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Bay View Crescent

Cadent Gas were proposing to carry out Utility asset works on Bay View Crescent, Little Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:36.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Bay View Crescent

Cadent Gas are proposing to carry out Utility asset works on Bay View Crescent, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 10:53.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Bay View Crescent

Cadent Gas are proposing to carry out Utility asset works on Bay View Crescent, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 15:11.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Bay View Crescent

Cadent Gas were proposing to carry out Utility asset works on Bay View Crescent, Little Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:55.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Mayes Lane

Cadent Gas were proposing to carry out Utility asset works on Mayes Lane, Little Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:27.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Mayes Lane

Cadent Gas are proposing to carry out Utility asset works on Mayes Lane, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 17:30.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Golden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Golden Lane, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 15:49.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Golden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Golden Lane, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Sep 2024 at 09:09.

Essex County Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Bagshaw Road

Essex County Council are proposing to carry out Highway improvement works on Bagshaw Road, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 07:43.

Essex County Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Bagshaw Road

Essex County Council are proposing to carry out Highway improvement works on Bagshaw Road, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 12:04.

Essex County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Kreswell Grove

Essex County Council are proposing to carry out Highway improvement works on Kreswell Grove, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 10:43.

Essex County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Bradfield Road

Essex County Council are proposing to carry out Highway improvement works on Bradfield Road, Wix.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:36.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Main Road

Cadent Gas were proposing to carry out Utility asset works on Main Road, Harwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 15:39.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Bay View Crescent

Cadent Gas are proposing to carry out Utility asset works on Bay View Crescent, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 17:30.

Essex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Swan Road

Essex County Council are proposing to carry out Highway improvement works on Swan Road, Beaumont.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 08:58.

Essex County Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Little Bentley Road

Essex County Council are proposing to carry out Highway improvement works on Little Bentley Road, Tendring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 16:10.

Essex County Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Little Bentley Road

Essex County Council are proposing to carry out Highway improvement works on Little Bentley Road, Tendring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 15:12.

Essex County Council logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Harwich Road

Essex County Council are proposing to carry out Highway improvement works on Harwich Road, Bradfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 14:11.

Essex County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Crow Lane

Essex County Council are proposing to carry out Highway improvement works on Crow Lane, Weeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 13:59.

Essex County Council logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Crow Lane

Essex County Council are proposing to carry out Highway improvement works on Crow Lane, Tendring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:27.

Essex County Council logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Crow Lane

Essex County Council are proposing to carry out Highway improvement works on Crow Lane, Tendring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 13:58.

Essex County Council logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Crow Lane

Essex County Council are proposing to carry out Highway improvement works on Crow Lane, Weeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the verge only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 16:27.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Clacton Road

Essex County Council are proposing to carry out Highway improvement works on Clacton Road, Mistley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:02.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:02.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:15.

Essex County Council logo
LONG TERM
Between
17 Feb 2025 and 18 Feb 2028
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 February 2028. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 18:48.

Affinity Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Dead Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Dead Lane, Mistley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 15 Nov 2024 at 14:46.


Roadworks Map near to Wix Road, HARWICH, CO12 5LU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 17:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wix Road, HARWICH, CO12 5LU (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.