ROADWORKS SUMMARY
Fronks Road, HARWICH, CO12 4EG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fronks Road, CO12 4EG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fronks Road, HARWICH, CO12 4EG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fronks Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Between
17 Feb 2025 and 18 Feb 2028
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 February 2028. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 18:48.

Anglian Water logo
LONG TERM
Between
11 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Road, Chelmondiston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 10:52.

Anglian Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are carrying out Utility repair and maintenance works on Main Road, Chelmondiston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 June 2025 at 11:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Aug 2025 at 13:43.

Anglian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Main Road

Anglian Water are carrying out Utility repair and maintenance works on Main Road, Shotley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 June 2025 at 10:00 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Aug 2025 at 09:21.

Anglian Water logo
LONG TERM
Between
11 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Road, Chelmondiston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 15 May 2025 at 10:44.

Anglian Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Shotley Road

Anglian Water are carrying out Utility repair and maintenance works on Shotley Road, Chelmondiston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 June 2025 at 11:00 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Aug 2025 at 15:28.

Anglian Water logo
LONG TERM
Between
11 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Shotley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Shotley Road, Chelmondiston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 10:52.

Anglian Water logo
LONG TERM
Between
11 Jun and 7 Nov 2025
Details
View Map
Share
Follow
Shotley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Shotley Road, Chelmondiston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Anglian Water on 15 May 2025 at 10:45.

Cadent Gas logo
LONG TERM
Until
25 Sep 2025
Details
View Map
Share
Follow
Long Meadows

Cadent Gas are carrying out Utility asset works on Long Meadows, Dovercourt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 08:24 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Jul 2025 at 08:31.

Cadent Gas logo
LONG TERM
Between
14 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Long Meadows

Cadent Gas are proposing to carry out Utility asset works on Long Meadows, Dovercourt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 12:16.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Arderne Close

Cadent Gas are carrying out Utility asset works on Arderne Close, Dovercourt.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 10:48 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 13:57.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Grimston Lane

Cadent Gas were proposing to carry out Utility asset works on Grimston Lane, Trimley St Martin.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 15:08.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Grimston Lane

Cadent Gas were proposing to carry out Utility asset works on Grimston Lane, Trimley St Martin.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Apr 2025 at 15:33.

Cadent Gas logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Gulpher Road

Cadent Gas are proposing to carry out Utility asset works on Gulpher Road, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 09:41.

Cadent Gas logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Devon Road

Cadent Gas are proposing to carry out Utility asset works on Devon Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 14:28.

Cadent Gas logo
LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road West

Cadent Gas are proposing to carry out Utility asset works on High Road West, Felixstowe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 14:26.

Cadent Gas logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Cornwall Road

Cadent Gas are proposing to carry out Utility asset works on Cornwall Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 14:28.

Essex County Council logo
Finishing
Saturday
Details
View Map
Share
Oakley Road

Essex County Council were proposing to carry out Highway improvement works on Oakley Road, Dovercourt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 May 2025 at 16:54.

Essex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Oakley Road

Essex County Council are proposing to carry out Highway improvement works on Oakley Road, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Jun 2025 at 13:28.

Essex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Oakley Road

Essex County Council are carrying out Highway improvement works on Oakley Road, Dovercourt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 20:15 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 2 Sep 2025 at 20:25.

Essex County Council logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Market Street

Essex County Council are proposing to carry out Highway improvement works on Market Street, Harwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Aug 2025 at 09:43.

UK Power Networks Eastern & London logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
The Maltings

UK Power Networks Eastern & London are proposing to carry out New service connection on The Maltings, Ramsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Jun 2025 at 08:27.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Fairfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairfield Avenue, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 13:35.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Dellwood Avenue

Cadent Gas are proposing to carry out Utility asset works on Dellwood Avenue, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 13:45.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Beatrice Avenue

Cadent Gas are proposing to carry out Utility asset works on Beatrice Avenue, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 13:17.

Cadent Gas logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Beatrice Avenue

Cadent Gas are proposing to carry out Utility asset works on Beatrice Avenue, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2025 at 12:31.

Anglian Water logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Holland Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Holland Road, Felixstowe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Jun 2025 at 15:01.

Cadent Gas logo
Between
10 and 28 Sep 2025
Details
View Map
Share
Follow
Gulpher Road

Cadent Gas are proposing to carry out Utility asset works on Gulpher Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 28 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 22 Aug 2025 at 15:17.

Cadent Gas logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 14:27.

Cadent Gas logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Seaton Road

Cadent Gas are proposing to carry out Utility asset works on Seaton Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 14:26.

Anglian Water logo
LONG TERM
Between
22 Sep and 4 Nov 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are proposing to carry out Utility asset works on Main Road, Shotley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 4 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Aug 2025 at 14:07.

Affinity Water logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Station Road, Wrabness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 25 Jun 2025 at 08:17.

Affinity Water logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Station Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Station Road, Wrabness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 2 Sep 2025 at 14:32.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Beatrice Avenue

Cadent Gas are proposing to carry out Utility asset works on Beatrice Avenue, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 12:21.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Dellwood Avenue

Cadent Gas are proposing to carry out Utility asset works on Dellwood Avenue, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 13:26.

Cadent Gas logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Fairfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairfield Avenue, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 13:23.

Cadent Gas logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Devon Road

Cadent Gas are proposing to carry out Utility asset works on Devon Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:24.

Cadent Gas logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Cornwall Road

Cadent Gas are proposing to carry out Utility asset works on Cornwall Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:23.

Cadent Gas logo
LONG TERM
Between
29 Sep and 21 Nov 2025
Details
View Map
Share
Follow
High Road West

Cadent Gas are proposing to carry out Utility asset works on High Road West, Felixstowe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:23.

Cadent Gas logo
LONG TERM
Between
29 Sep and 21 Nov 2025
Details
View Map
Share
Follow
High Road West

Cadent Gas are proposing to carry out Utility asset works on High Road West, Felixstowe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:24.

Cadent Gas logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Cobbold Road

Cadent Gas are proposing to carry out Utility asset works on Cobbold Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:28.

Cadent Gas logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Cobbold Road

Cadent Gas are proposing to carry out Utility asset works on Cobbold Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:59.

Cadent Gas logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Penfold Road

Cadent Gas are proposing to carry out Utility asset works on Penfold Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:26.

Cadent Gas logo
Between
6 and 19 Oct 2025
Details
View Map
Share
Follow
Fleetwood Avenue

Cadent Gas are proposing to carry out Utility asset works on Fleetwood Avenue, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 10:00.

Cadent Gas logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
High Road East

Cadent Gas are proposing to carry out Utility asset works on High Road East, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 10:00.

Cadent Gas logo
Between
6 and 19 Oct 2025
Details
View Map
Share
Follow
Fleetwood Road

Cadent Gas are proposing to carry out Utility asset works on Fleetwood Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 10:00.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Gainsborough Road

Cadent Gas are proposing to carry out Utility asset works on Gainsborough Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:59.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Hamilton Road

Cadent Gas are proposing to carry out Utility asset works on Hamilton Road, Felixstowe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 08:36.

Cadent Gas logo
Between
6 and 20 Oct 2025
Details
View Map
Share
Follow
Gainsborough Road

Cadent Gas are proposing to carry out Utility asset works on Gainsborough Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:28.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:25.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Garrison Lane

Cadent Gas are proposing to carry out Utility asset works on Garrison Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:28.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
St Andrews Road

Cadent Gas are proposing to carry out Utility asset works on St Andrews Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:27.

Suffolk County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Cobbold Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Cobbold Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Aug 2025 at 10:42.

UK Power Networks Eastern & London logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Hamilton Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Hamilton Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2025 at 09:25.

Cadent Gas logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Seaton Road

Cadent Gas are proposing to carry out Utility asset works on Seaton Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 11:25.

Cadent Gas logo
Between
13 and 26 Oct 2025
Details
View Map
Share
Follow
Valley Walk

Cadent Gas are proposing to carry out Utility asset works on Valley Walk, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 10:19.

Suffolk County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Orwell Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Orwell Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Aug 2025 at 10:42.

Suffolk County Council logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Victoria Street

Suffolk County Council are proposing to carry out Highway improvement works on Victoria Street, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Aug 2025 at 10:42.

Suffolk County Council logo
Between
14 and 18 Oct 2025
Details
View Map
Share
Follow
Seaton Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Seaton Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Aug 2025 at 15:30.

Suffolk County Council logo
Between
14 and 18 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Aug 2025 at 15:30.

Suffolk County Council logo
Between
14 and 18 Oct 2025
Details
View Map
Share
Follow
King Street

Suffolk County Council are proposing to carry out Highway improvement works on King Street, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 18 Aug 2025 at 15:29.

Cadent Gas logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Garrison Lane

Cadent Gas are proposing to carry out Utility asset works on Garrison Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:27.

Essex County Council logo
LONG TERM
Between
20 Oct 2025 and 18 Apr 2027
Details
View Map
Share
Follow
Kingsway

Essex County Council are proposing to carry out Highway improvement works on Kingsway, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 18 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 19 Aug 2025 at 10:13.

Cadent Gas logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Cobbold Road

Cadent Gas are proposing to carry out Utility asset works on Cobbold Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2025 at 12:59.

Cadent Gas logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Cobbold Road

Cadent Gas are proposing to carry out Utility asset works on Cobbold Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 10:28.

Anglian Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Woodlands

Anglian Water are proposing to carry out Utility asset works on Woodlands, Chelmondiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Sep 2025 at 13:12.

Anglian Water logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Woodlands

Anglian Water are proposing to carry out Utility asset works on Woodlands, Chelmondiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Aug 2025 at 15:18.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Seaton Road

Cadent Gas are proposing to carry out Utility asset works on Seaton Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:25.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Back Lane

Cadent Gas are proposing to carry out Utility asset works on Back Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:25.

Anglian Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Grange Farm Avenue

Anglian Water are proposing to carry out Utility repair and maintenance works on Grange Farm Avenue, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 30 Jul 2025 at 10:40.

UK Power Networks Eastern & London logo
Between
30 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Kirton Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Kirton Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 12:02.

Anglian Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are proposing to carry out Utility asset works on Church Road, Chelmondiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 2 Sep 2025 at 13:14.

Anglian Water logo
Between
3 and 9 Nov 2025
Details
View Map
Share
Follow
Church Road

Anglian Water are proposing to carry out Utility asset works on Church Road, Chelmondiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Aug 2025 at 16:04.

Anglian Water logo
LONG TERM
Between
7 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Main Road

Anglian Water are proposing to carry out Utility asset works on Main Road, Shotley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 11 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 3 Jul 2025 at 12:23.

Cadent Gas logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Devon Road

Cadent Gas are proposing to carry out Utility asset works on Devon Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:33.

Anglian Water logo
Between
10 and 18 Nov 2025
Details
View Map
Share
Follow
Pin Mill Road

Anglian Water are proposing to carry out Utility asset works on Pin Mill Road, Chelmondiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Aug 2025 at 12:23.

Cadent Gas logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Cornwall Road

Cadent Gas are proposing to carry out Utility asset works on Cornwall Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2025 at 15:35.

UK Power Networks Eastern & London logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Kirton Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Kirton Road, Trimley St Martin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 11:50.


Roadworks Map near to Fronks Road, HARWICH, CO12 4EG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fronks Road, HARWICH, CO12 4EG (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
FRONKS ROAD 
(0.0 miles)
Cadent Gas
New service connection - Footway, Carriageway - Multi-way signals
In Progress
Since: 2 Sep 2025 08:43
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
0.0
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
LONG MEADOWS 
(0.5 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 14 Jul 2025 - 19 Sep 2025
0.5
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
LONG MEADOWS 
(0.5 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
In Progress
Since: 18 Jul 2025 08:24
(Scheduled: 14 Jul 2025 - 25 Sep 2025)
0.5
Details
Share
Follow
4
UK Power Networks Eastern & London logo
URGENT
  
LONG MEADOWS 
(0.6 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 1 Sep 2025 12:06
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.6
Details
Share
Follow
5
BT logo
ABBOTT ROAD 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.6
Details
Share
Follow
6
BT logo
ABBOTT ROAD 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.6
Details
Share
Follow
7
Affinity Water logo
URGENT
  
HIGH STREET 
(0.6 miles)
Affinity Water
Utility repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 3 Sep 2025 10:20
(Scheduled: 3 Sep 2025 - 8 Sep 2025)
0.6
Details
Share
Follow
8
Essex County Council logo
LOW ROAD 
(0.6 miles)
Essex County Council
Highway improvement works - Verge - No carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 4 Sep 2025
0.6
Details
Share
Follow
9
Affinity Water logo
KILMAINE ROAD 
(0.7 miles)
Affinity Water
Remedial works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 2 Sep 2025 - 4 Sep 2025
0.7
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
ARDERNE CLOSE 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 11 Aug 2025 10:48
(Scheduled: 11 Aug 2025 - 5 Sep 2025)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.