ROADWORKS SUMMARY
Colchester Road, SUDBURY, CO10 5LT
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Colchester Road, CO10 5LT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Colchester Road, SUDBURY, CO10 5LT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Colchester Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
16 Nov 2025
Anglian Water are carrying out Utility asset works on Marsh Road, Stoke By Nayland.
These works are categorised as Major.
The works started on 17 May 2024 at 13:50 and could run through until 16 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 17 May 2024 at 13:50.
23 Nov 2025
Anglian Water are carrying out Utility asset works on Tog Lane, Great Horkesley.
These works are categorised as Major.
The works started on 24 May 2024 at 08:35 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 24 May 2024 at 08:35.
2 Dec 2025
Anglian Water are carrying out Utility asset works on Church Road, Boxted.
These works are categorised as Major.
The works started on 24 June 2024 at 12:30 and could run through until 2 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 24 Jun 2024 at 12:24.
2 Dec 2025
Anglian Water are carrying out Utility asset works on Wet Lane, Boxted.
These works are categorised as Major.
The works started on 24 June 2024 at 12:30 and could run through until 2 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 24 Jun 2024 at 12:24.
Friday
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 14:00.
20 Jan 2025 and 19 Jul 2027
Essex County Council are proposing to carry out Highway improvement works on Wick Road, Boxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 19 July 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 08:20.
20 Jan and 28 Feb 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Mill Street, Polstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 15:25.
19 Jul 2027
Essex County Council are carrying out Highway improvement works on Wick Road, Boxted.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 00:00 and could run through until 19 July 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 13:49.
Essex County Council carried out Highway improvement works on Lamarsh Road, Alphamstone.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 3 Feb 2025 and 21 Feb 2025 and were actually completed between 3 Feb 2025 (10:29) and 18 Feb 2025 (10:45). The works impacted the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Feb 2025 at 10:58.
Friday
Anglian Water are carrying out Utility repair and maintenance works on Folly Road, Great Waldingfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2025 at 13:58 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 18 Feb 2025 at 15:23.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Bear Street, Nayland With Wissington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 22 Oct 2024 at 11:55.
18 Feb and 19 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Further Street, Assington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 10 Feb 2025 at 09:09.
18 Feb and 19 Mar 2025
Suffolk County Council were proposing to carry out Highway improvement works on Boxford Lane, Newton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 14:28.
26 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Green, Edwardstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 13 Feb 2025 at 12:55.
26 and 28 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Mill Green, Edwardstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 11 Dec 2024 at 15:58.
13 and 16 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boxford Road, Milden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 12:46.
13 and 19 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boxford Road, Milden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jan 2025 at 10:15.
14 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:13.
14 and 20 Mar 2025
Essex County Council were proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 13:10.
14 and 20 Mar 2025
Essex County Council were proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 13:10.
14 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:07.
14 and 20 Mar 2025
Essex County Council were proposing to carry out Highway improvement works on Main Road, Wormingford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 12:56.
14 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:16.
14 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 13:10.
14 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 13:34.
14 and 20 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Feb 2025 at 09:15.
15 and 18 Apr 2025
Essex County Council were proposing to carry out Highway improvement works on Dowling Road, Mount Bures.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 15:17.
23 and 25 Apr 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Sherbourne Street, Boxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 7 Feb 2025 at 10:06.
23 and 29 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Chappel Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 11:55.
23 and 29 Apr 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on School Street, Stoke By Nayland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Feb 2025 at 15:17.
23 and 28 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 11:52.
23 and 25 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Hornes Green Road, Bures Hamlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 15:31.
23 and 29 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Bures Hamlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Jan 2025 at 15:29.
5 and 11 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Stone Street, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 May 2025. The works will impact the verge only.
This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 15:53.
5 and 11 May 2025
Suffolk County Council are proposing to carry out Works for road purposes on Stone Street, Boxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 May 2025. The works will impact the verge only.
This roadwork event was last updated by Suffolk County Council on 18 Feb 2025 at 16:49.
6 and 9 May 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Water Lane, Little Horkesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Feb 2025 at 11:34.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Jan 2025 at 16:04.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 11:30.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 11:56.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 11:30.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 12:21.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Sandy Hill, Wormingford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 11:56.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 12:09.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Colchester Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 12:09.
7 and 13 May 2025
Essex County Council are proposing to carry out Highway improvement works on Lower Road, Mount Bures.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Feb 2025 at 12:21.
Roadworks Map near to Colchester Road, SUDBURY, CO10 5LT (Loading...)
![](https://a.tile.openstreetmap.org/13/4114/2705.png)
![](https://b.tile.openstreetmap.org/13/4115/2705.png)
![](https://c.tile.openstreetmap.org/13/4113/2705.png)
![](https://c.tile.openstreetmap.org/13/4116/2705.png)
![](https://b.tile.openstreetmap.org/13/4112/2705.png)
![](https://a.tile.openstreetmap.org/13/4117/2705.png)
![](marker-shadow.png)
![Marker](marker-icon.png)
![Marker](https://streetguide.co.uk/includes/images/purple-32.png)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Colchester Road, SUDBURY, CO10 5LT (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.